Forwards IE Insp Rept 50-255/79-06 on 790321-23 & 27-30 & Notice of Violation
ML18043A840
Person / Time
Site: Palisades 
Issue date: 06/06/1979
From: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dewitt R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML18043A841 List:
References
NUDOCS 7907250206
Download: ML18043A840 (2)


See also: IR 05000255/1979006

Text

T

UNITED STATES

NUCLEAR REGULATORY COMMISSION

..

REGION Ill

799 ROOSEVELT ROAD

GLEN ELLYN, ILLINOIS 60137

JUN li

1979

Docket No. 50-255

Consumers Power Company

ATTN:

Mr. R. B. DeWitt

Manager of Nuclear

Plant Operations

212 West Michigan Avenue

Jackson, MI

49201

Gentlemen:

CENTRAL FILES

This refers to the inspection conducted by Messrs. L. J. Rueter

and L. R. Greger of this office on March 21-23 and 27-30, 1979

of activities at Palisades Nuclear Generating Plant authorized

by NRC License No. DPR-20 and to the discussion of our findings

with Mr. Lewis and others of your staff at the conclusion of

the inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection.

Within these areas, the

inspection consisted of a selective examination of procedures

and representative records, observations, and interviews with

personnel.

The inspector also examined actions you have taken with respect

to the matters identified in your letters dated March 13,

September 5, and December 8, 1978.

We have no further questions

regarding these matters.

During this inspection, certain of your activities appeared

to be in noncompliance with NRC requirements, as described

in the enclosed Appendix A.

This notice is sent to you pursuant to the provisions of

Section 2.201 of the NRC's "Rules of Practice," Part 2, Title

10, Code of Federal Regulations.

Section 2.201 requires you

to submit to this office within twenty days of your receipt

of this notice a written statement or explanation in reply,

including for each item of noncompliance: (1) corrective

action taken and the results achieved; (2) corrective action

to be taken to avoid further noncompliance; and (3) the date

when full compliance will be achieved .

\\,

~ .

..

OFFICE"'

SURNAM$

DATE>

Consumers Power

Company

-2-

In accordance with Section 2. 790 of the 'NRC' e "Rules of

Practice," Part 2, Title 10, Code of Federal R~gulat:ions, a

copy of this letter, the enclosures, and your response to

this letter vill be placed in the NRC's Public DoCUlllent Room,

except as follows. If the enclosures contain information

that you or your contractors believe to be proprietary, you

aust apply in writing to this office, within twenty clays of

your receipt of this letter, to withhold such information

from public disclosure.

The application mist include a full

statement of the reasons for which the information is con-

  • idered proprietary, and should be prepared so that proprietary

information identified in the application is contained in an

enclosure to the application.

We r.Ll.1 gladly d..iseuss miy qwesi:ions you have concerning this

inspection.

'lnclosures:

1. Appendb: A, liotice of

Violation

2.

IE Inspection Report

Bo. 50-255/79-06

cc w/encls:

Kr. J. C. Lewis, Plant

Superintendent

Central Files

Reproduction Unit llRC 20b

PDR.

. Local PDR

RSIC

TIC

Sincerely,

A. B. DaTie, Chief

Fuel Facility and

Materials Safety Branch

Konald Callen, Michigan Public

Service Comm.iseion

Hyron M. Cherry, Chicago

NRC Form 3188 (Rm) (1-78) NRCM 0240