Monthly Operating Rept for Mar 1979
ML18043A615
Person / Time
Site: Palisades Entergy icon.png
Issue date: 04/05/1979
From: Bodtke P
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18043A614 List:
References
MOR-790331, NUDOCS 7904160167
Download: ML18043A615 (4)


Text

...*

(

OPERATU'lG DATA REPORT OPERATING STATUS I. Unit Name:

Palisades

2. Reporting Period:

790301 - 790331

3. Licensed Thennal Power (MWt):

2530

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe): _*.....;6.....;7..;;;;5 ___ _

811.7 805

7. Maximwn Dependable Capacity (Net MWe):

_*....;:6:.::3:..::5:..__ __ _

Notes DOCKET NO.

DATE COMPLETED BY TELEPHONE 50-255 April 5, 1979 PJBodtke.

616-764-8913

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date

  • 11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical 744 2160 2113.l 728.9
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line 722.5 2095.2
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH) 5,191,896 1,563, 720 1.483.148 1,785,288 542,440 513,562
19. Unit Service Factor 97.1 97.0
20. Unit Availability Factor 97.1 97.0
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net) 108.1 85.3 108.7 85.8
23. Unit Forced Outage Rate 2
  • 9 3.0
24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):
25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION.

  • Based on Condenser Backpressure Limitations Forecast 7904160 It 7 Cumulative 63,831 36,309 34,277 64,656,528 19.955.360 18,720,659 53.7 53.7 46.2 36.4 37.5 Achi~~ed (Q/77)
  • -*'*:***~~_..... '":"._....... --r.--~--........._.,. __________________..:__ ___ _

(

c:

C A VERA GE DAILY UNIT POWER LEV

  • DOCKET NO.

50-255 UNIT Palisades DATE A:Qril 5 i 1979 COMPLETED BY PJBodtke TELEPHONE 616-764-8913 MONTII March, 1979*

DAY A VERA GE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 729 17 725*

2 720 18 718 3

192 19 716 4

359 20 724 5

726 21 725 6

723 22 725 7

719 23 706 8

732 24 718 9

720 25 722

'10 722 26 719 II 709 27 721.

12 723 28 714 13 715 29 715 14 720

.30 691 15 712 31 723 16 714 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting ITil>nth. Compute to the nearest whole megawatt.

(9/77)

(~

Nii:

Date 3

790303 2

F: Forced S: Scheduled (9/77)

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH March, 1979

'"L rl

't 0

ell.....

... 'J Vl

-a*=,.,

tlJ 0

0..

l

~ -

11)

~ ~

.cs~

I-

l :r:

'U a:;..c =

o-

~

~VJ ~

c5 F

21.5 A

3 Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C'-Refueling D-Rcgulatory Restriction Licensee Event Report#

N/A E-Opcralor Training & License Examination F-Administ rativc

. G-Opcrational Error (Explain)

I I-Other (Explain) 3

-=

E-q-ti>.,-,

= tlJ tlJ tlJ 0 "O

    • ~*8

.o. 0 Eu 0 u NA NA Method:

I-Manual 2-Manual Scram.

3-Autumalic Scram.

4-0ther (Explain) *.

Failure of DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-255 Palisades April 9, 1979 PJBodtke 616-764-8913 C~use & Corrective Action to Prevent Recurrence a control valve resulted in a heater.drain pump trip, which caused the 4

5 main feed pumps to trip.

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit I

  • Same Source

Consumers Power Company Palisades Nuclear Plant Docket No. 50-255 General 3-3-79

SUMMARY

OF SHUTDOWN EXPERIENCE FOR MARCH 1979 With the exception noted below, the plant operated at 100 percent of rated thermal power during March.

The high level dump valve (CV-0609) for the moisture separator drain tank failed open, resulting in a low water level in the tank.

This caused the heater drain pump (P-lOB) to trip, which in turn led to a low suction pressure trip of the main feedwater pumps.

The reactor tripped from low steam generator water level.

Following repairs to CV-0609, the plant was returned to operation.

The outage lasted 21.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.