OPERATING DATA REPORT DOCKET NO.
50-255 3-2-79 PJBodtke DATE CO:\\IPLETED BY TELEPHONE 616-164-8913 OPERATING STATUS
- 1. Unit Name:
Palisades Notes
. 2. Reporting Period:
790201 - 790228
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
2530 811. 7.
805
- 675
- 635
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month Yr.-to-Date
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical 672 652.1 1384.2
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line 647,3 1372.7
- 15. Urut Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor 1.604,952 479,470 455,036 96,3 3,406,608 1,021,280 969,586
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net) 96.3 106.6 84.1 107.8
- 23. Unit Forced Outage Rate 3
- 7 3.1
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):
Refueling scheduled-~or late summer, 2}g months.
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Based on Condenser Backpressure. Limitati.ons Forecast
/
7 903120?-71 Cµmulative
~,
o"--'8'-'-7-'.. __
35,580.. 1 33,554,5 62,871,240 19,412,920 18,207.,097 53.2 53.2
_45.5 35,*9 38,5 Achieved (9/77)
~**
,,_~
- ~.
~"---
l.
~,-**:
MONTH February, 1979
- e.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-255 Palisades 3-2-79 PJBodtke 616-764-8913 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 62 17 714 2
364 18 712 3
715 19 0
4 712 20 707 5
709 21 26 6
701 22 717 7
1 23 724 8
622 24 24 9
715 25 716 IO 719 26 718 I I 712 27 726 12 713 28 722 13 709 29 14 702 30 15 707 31 16 698 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reponing month. Compute to the nearest whole megawatt.
(9/77)
t~'.~I
~..
./'
N11.::
Date 2
790201 F: Forced S: Scheduled (lJ/77)
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH Feb*, 1979 i
rr, r I
~o.....
'J
- = ~
5 "d *= ""
Q)
D.
- l
~ -
v
~ :I
..c: s 0:::
f-6~
er:
Q)
- E (/) ~
8 F
24.7 G
3 Reason:
A-Equipment Failure (Explain)
B-Maintenance oi Test C'-Rcfueling D-Regulatory Restrktion Licensee Event Report #
NA E-Opcrator Training & License Examination F-Administrative
. G-Operationai Error (Explain)
II-Other (Explain) 3 i::
Q) tr)
C'<j" i:::
Q)
Q)
Q) 0 "d
'U
~
.o. ~
~
E u
(/) l.i 0 c.;
NA NA Method:
!-Manual 2-Manual Scram.
3-Automatic Scram.
4-0ther (Explain)
Operator primary DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE.
Cause & Corrective Action to Prevent Recurrence 50-255 Palisades 3-6-79 PJBodtke 636-764-8913 inadve:rtantly tripped a coolant* pump.
4
.,.4" Exhibit G
- Inst ructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
- 5.
Exl}ibil I
- Same Sllu rec
t
- I *e
Consumers Power Company Palisades Nuclear Plant Docket 50-255
SUMMARY
OF SHUTDOWN EXPERIENCE FOR FEBRUARY, 1979 General.
With the exception of the outage discussed below, the plant operated at or near iliOO per cent of rated thermal power during the entire month.
2-1-79 Due to a personnel error, a primary coolant pump was inadvertantly stop-ped, resulting in an automatic scram of the reactor.
The plant trip was followed by a partial PCS cooldown and Safety Injection System initiation.
The PCS pressure was recovered, such that no HPSI pump water was intro-duced into the PCS.
The plant was put back on line after a 24.7 nour outage.