| Site: | Palisades |
| Issue date: | 10/27/1978 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | |
| Shared Package | |
| ML18043A296 | List: |
| References | |
| 50-255-78-23, NUDOCS 7812010126 | |
| Download: ML18043A299 (1) | |
Text
.. \\'
Appendix A NOTICE OF VIOLATION Consumers Power Company Docket No. 50-255 Based on the inspection conducted on October 2-6, 1978, it appears that certain of your activities were in noncompliance with NRC requirements, as noted below.
Items 1 and 2 are infractions.
- 1.
Technical Specification 6.8.1 requires that procedures covering surveillance and testing activities of safety-related equipment shall be implemented.
Surveillance Procedure M0-19 requires corrective action in the event test data indicates containment spray pumps to be inoperable.
2
- Contrary to the above, results of containment spray pump surveil-lance tests conducted on May 21, 1978, indicated the pumps to be inoperable and the action required by Procedure M0-19 was not taken.
10 CFR 50.55a(g) and Procedure EM-09-04 require inservice testing of.ASME Code Class 1, 2 and 3 pumps be performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code 1974 Edition and Addenda through Summer 1975.
Contrary to the above:
- a.
The April 26,.1978, test results of the containment spray pumps were in the "alert range" of Table IWP-3100-2 of
- b.
ASME Code Section XI and testing was not increased as required by Subarticle IWP-3230 until the causes of the deviations were determined and corrected.
The review of the May 21, 1978, test data for the contain-ment spray pumps was not completed within 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> after completion of the test as required by ASME Code Section XI, Subarticle IWP-3230.
7812010 it(,