D NOTES:
ACCELERAT ~ DOCUlVIENTDISTRIBUTIONSYSTEM REGULAT INFORMATION DISTRIBUTION STEM (RIDS)
ACCESSIOM NBR 9307020349 DOC DATE'3/06/30 NOTARIZED'ES DOCKET
'FACIL:50-220 Nine Mile Point Nuclear Station, Unit 1, Niagara Powe 05000220 AUTH.NAME AUTHOR AFFILIATION TERRY,C.D..Niagara Mohawk Power Corp
~ I
~
'7/iE//~
RECZP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Forwards Rev ll to Vols 1-4 of "NMPNS,Unit 1 FSAR (Update),'W~
reflecting rev to QA program description
& annual 10CF50.59, "NMPNS,Unit SE Summary Rept,1993."
DISTRIBUTION CODE:
A053D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: OR Submittal:
Updated FSAR (50.71) and Amendments RECIPIENT ID CODE/NAME PD1-1 PD INTERNAL: ACRS NRR/PDLR RGNl EXTERNAL: IHS NSIC COPIES LTTR ENCL 1'
2 2
1 0
1 1
1 1
1 1
RECIPIENT ID CODE/NAME BRINKMAN,D.
AEOD DOA/IRB IL 01 NRC PDR SAIC ATEFIYB.
COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 D
D D
D NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTEI CONTACI'HEDOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED:
LTTR 12 ENCL 10
V HIIASAIRA U Ah~8AWK NIAGARAMOHAWKPOWER CORPORATION/301 PLAINFIELDROAD, SYRACUSE, N.Y. 13212/TELEPHONE (315) 474-1511 June 30, 1993
%1P1L 0768 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.
20555 Re:
Nine MilePoint Unit 1 Docket No. 50-220 DPR-6 Gentlemen:
SUBJECT'UBMTITALOF REVISION 11 TO THE NINE MILEPOINT NUCLEAR STATION UNIT 1 FINALSAFETY ANALYSISREPORT (UPDATED),
THE ANNUAL10 C.F.R. $50.59 SAFETY EVALUATION
SUMMARY
REPORT, AND A REVISION TO THE QUALITYASSURANCE PROGRAM DESCRIPTION Pursuant to the requirements of 10 C.F.R.
$50.71(e) and 10 C.F.R.
$50.59(b), Niagara Mohawk Power Corporation hereby submits Revision 11 to the Nine Mile Point Nuclear Station Unit 1 Final Safety Analysis Report (Updated), and the annual Safety Evaluation Summary Report.
One (1) signed original and ten (10) copies of the Unit 1 FSAR (Updated), Revision 11, are enclosed.
Copies are also being sent directly to the Regional Administrator, Region I, and the Senior Resident Inspector at Nine Mile Point.
The Unit 1 FSAR (Updated) revision contains changes made since the submittal of Revision 10 in June 1992.
The certification required by 10 C.F.R.
$50.71(e) is attached.
The enclosed annual Safety Evaluation Summary Report (Enclosure A) contains brief descriptions of changes to the facility design, Unit 1 FSAR (Updated), procedures, tests, and experiments.
None of the Safety Evaluations involved an unreviewed safety question as defined in 10 C.F.R. 550.59(a)(2).
Also, pursuant to the requirements of 10 C.F.R.
$50.54(a)(3), Niagara Mohawk Power Corporation hereby submits a revision to the Niagara Mohawk Power Corporation Quality Assurance Topical Report for Nine Mile Point Nuclear Station Operations (NMPC-QATR-1).
This revision combines the Niagara Mohawk Power Corporation Fire Protection Quality Assurance Program description (NMPC-FPQAP) with the NMPC-QATR-1. This combined quality assurance program description has been incorporated into the Unit 1 FSAR (Updated) as Appendix B. An identical Appendix B willbe added to the Unit 2 Updated Safety Analysis Report in the October 1993 update.
Future revisions to the quality assurance program description willbe submitted with the annual safety analysis report updates for each unit. This approach is consistent with discussions held between Niagara Mohawk Power p
OgO(, '."~9~07020S49 9aoaa0
gyffes f','> h,
l Page 2 Corporation and the Nuclear Regulatory Commission Staff, as documented in USNRC letter to C. D. Terry, "10CFR50,54 Quality Assurance Program Change Review," dated March 18, 1993.
The Unit 1 FSAR (Updated) Appendix B contains changes made to the quality assurance program since the submittal of NMPC-QATR-1, Revision 7, on March 25, 1992, the submittal of NMPC-FPQAP-l, Revision 2, on May 25, 1990, and the submittal of NMPC-FPQAP-1, Revision 3, on January 4, 1993.
Enclosure B provides the identification, reason, and basis for each change to the NMPC-QATR-1 in accordance with 10 C.F,R.
$50,54(a)(3)(ii).
Enclosure B also provides a cross-reference between the new Unit 1 FSAR (Updated) Appendix B and NMPC-QATR-1, Revision 7, as an aid to understanding the manner in which the quality assurance program description was physically incorporated into Unit 1 FSAR (Updated) Appendix B.
Enclosure C provides the identification, reason, and basis for changes made to the NMPC-FPQAP since the submittal of Revision 2.
As described in the above-mentioned USNRC letter dated March 18, 1993, the Region I Staff decided to postpone the review of Revision 3 changes until the NMPC-FPQAP was combined with the NMPC-QATR-1 and submitted with the Nine Mile Point Unit 1 Final Safety Analysis Report (Updated).
As a result of combining the NMPC-FPQAP with the NMPC-QATR-1, several of the changes identified in Revision 3 of the NMPC-FPQAP are no longer applicable.
Therefore, Enclosure C identifies all changes made to the NMPC-FPQAP since the submittal of Revision 2.
Enclosure C also provides a cross-reference between the new Unit 1 FSAR (Updated)
Appendix B and NMPC-FPQAP, Revision 2, as an aid to understanding the manner in which the NMPC-FPQAP was combined with the NMPC-QATR-1 and incorporated into Unit 1 FSAR (Updated) Appendix B.
The revised quality assurance program description eliminates redundancy both within Unit 1 FSAR (Updated) Appendix B and between the Appendix and other Unit 1 FSAR (Updated) sections, and reflects the current organizational structure of the Nuclear Division. None of the changes reduce previous commitments.
Very t
- yours, JJL/mls 003987GG Enclosures C. D. Te Vice President - Nuclear Engineering pc:
Mr. T. T. Martin, Regional Administrator, Region I Mr. W. L. Schmidt, Senior Resident Inspector Records Management
0 J'
~
,r l
r IP t@E r, <',5 ~'" 4
~
si
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of Niagara Mohawk Power Corporation (Nine Mile Point Unit 1)
Docket No. 50-220 ERTIFI ATION C. D. Terry, being duly sworn, states that he is Vice President - Nuclear Engineering of Niagara Mohawk Power Corporation; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this certification; and that, in accordance with 10 C.F.R.
$50.71(e)(2), the information contained in the attached letter and updated Final Safety Analysis Report accurately presents changes made since the previous submittal necessary to reflect information and analyses submitted to the Commission or prepared pursuant to Commission requirement and contains an identification of changes made under the provisions of 550.59 but not previously submitted to the Commission.
C. D.
erry Vice President - Nuclear Engineering Subscribed and sworn to before me, a Notary Public in and for the State of New York and County of
, this ~
day of
, 1993.
Np Public in and for County, New York My Commission Expires:
SNERLY W. RIPKA ttotkiyPale Statoot Itow York Qinrt,ln Oswego Co. Ito. <64879 Mtr Commtsslon Ex~p.
N9~
~
gpss>Ewr
~~ ~
)N I
I
'l
/
'1 Cf f
c, r
I ag II
N',
MILEPOINT UNIT I FSAR (UPIVED)
IN ERTI N IN TR N
VOLUME 1 REM VE ix/x xi/xii xiii/xiv xviib/xviii xxv/xxvi xxvii/xxviii xxviiia/xxviiib xxxi/xxxia xxxviiia/xxxviiib xxxix/xl xliii/xliv xlv/xlvi li/lii liii/liiia I-5/6 III-3/-
III-10/-
III-26/-
III-37/38 III-46/-
IV-35/35a V-3/4 V-11/-
V-21/22 V-23/24 V-25/26
~$ERT ix/x xi/xia xib/xii xiii/xiv xviib/xviii xviiia/xviiib xxv/xxvi xxvii/xxviii xxviiia/xxviiib xxxi/xxxia xxxviiia/xxxvi b xxxix/xl xliii/xliv xlv/xlvi li/lii liii/liii
-5/
3/-
11- 0/-
III-2 III-37 8
111-46/-
IV-35/35a V-3/4 V-11/-
V-21/22 V-23/23a V-23b/24 V-25/26 UFSAR Revision 11 FII-3 June 1993
0
.~ MILEPOINT UNIT I FSAR (UITED)
ERTI NIN TR VOLUME2 R~EM VB ix/x xi/xii xiii/xiv xviib/xviii xxv/xxvi xxvii/xxviii xxviiia/xxviiib xxxi/xxxia xxxviiia/xxxviiib xxxix/xl xliii/xliv xlv/xlvi li/lii liii/liiia
~IN ERT ix/x xi/xia xib/xii xiii/xiv xviib/xviii xviiia/xviiib xxv/xxvi xxvii/xxviii xxviiia/xxviiib xxxi/xxxia.
xxxviiia/xxxviiib xxxix/xl xliii/xliv xlv/xlvi li/lii liii/liiia VI-21/22 VI-43/43a VI-43b/44 VI-45/46 VI-47/-
VI-47a/-
VI-48/-
VI-48a/-
VI-49/-
VI-50/-
VI-50a/-
VI-50b/-
VI-51/-
VI-55/56 VI-58/-
VI-63/-
-/VI-64 VI-67/68 VII-12/-
VII-21/-
VI-21/22 VI-22a/22b VI-43/43a VI-43b/44 VI-45/46 VI-47/-
.VI-48/-
VI-48a/-
VI-49/-
VI-50/-
VI-50a/-
VI-50b/-
VI-51/-
VI-55/56 VI-58/-
VI-63/-
-/VI-64 VI-67/68 VII-12/-
VII-21/21a UFSAR Revision 11 June 1993
0
~ MLE POINT UNIT I FSAR (UETED)
IN ERTI N TR REM VE VII-25/26 VII-27/28 VII-47/-
VIII-11/12 VIII-37/38 VIII-39/40 VIII-49/50 IX-1/2 IX-3/4 t
IX-23/24 IX-24a/-
IX-35/-
VOLUME2 (Cont'd.)
~$ 1.RT VII-21b/-
VII-25/26 VII-27/28 VII%7/-
VIII-11/12 VIII-37/38 VIII-39/40 VIII-49/50 IX-1/2 IX-2a/2b IX-3/4 IX-4a/4b IX-23/24 IX-24a/24b IX-35/36 IX-37/38 IX-39/40 UFSAR Revision 11 FII-5 June 1993
MILEPOINT UNIT I FSAR (UP+TED)
IN ERTI N TR LIST OF EFFECMVE PAGES EMOVE INSERT EP-i EP 1-1 EP 2-1 EP 3-1 EP 4-1 EP 5-1 EP 6-1 EP 7-1 EP 8-1 thru EP 8-2 EP 9-1 EP 10-1 thru EP 10-6 EP 11-1 EP 12-1 EP 13-1 EP 14-1 EP 15-1 thru EP 15-3 EP 16-1 thru EP 16-3 EP 17-1 thru EP 17-2 EP 18-1 EP i EP 1-1 EP 2-1 EP 3-1 EP 4-1 EP 5-1 EP 6-1 EP 7-1 EP 8-1 thru EP 8-2 EP 9-1 EP 10-1 thru EP 10-6 EP 11-1 EP 12-1 EP 13-1 EP 14-1 EP 15-1 thru EP 15-4 EP 16-1 thru EP 16-3 EP 17-1 thru EP 17-2 Chapter 18 Tab EP 18-1 APP. A Tab EP A-1 APP. B Tab EP B-1 UFSAR Revision 11 FII-2 June 1993
NQk MILEPOINT UNIT I FSAR (UP+TED)
INSERTI N INSTR VOLUME3 REM VE IN ERT ix/x xi/xii xiii/xiv xviib/xviii xxv/xxvi xxvii/xxviii xxviiia/xxviiib xxxi/xxxia xxxviiia/xxxviiib xxxix/xl xliii/xliv xlv/xlvi li/lii liii/liiia ix/x xi/xia xib/xii xiii/xiv xviib/xviii xviiia/xviiib xxv/xxvi xxvii/xxviii xxviiia/xxviiib xxxi/xxxia xxxviiia/xxxviiib xxxix/xl xliii/xliv xlv/xlvi li/lii liii/liiia X-9/-
X-21/22 X-29/30 X-31/-
X-33/34 X-41/-
X-45/-
X-46/-
X-47/48 X-57/58 X-61/62 X-9/-
X-21/21a X-21b/22 X-29/30 X-31/-
X-33/34 X-41/-
X-45/-
X-46/-
X-47/48 X-57/58 X-61/62 10A-vii/viii 10A-5/6 10A-7/8 10A-9/10 10A-11/12 10A-13/14 10A-19/20 B-40141-C B-40142-C
. 10A-vii/viii 10A-5/6 10A-7/8 10A-9/10 10A-11/12 10A-13/14 10A-19/20 B-40141-C B-40142-C UFSAR Revision 11 FII-6 June 1993
N MILEPOINT UNIT I FSAR (UPTED)
IN ERTI N REM VE B-40143-C B-40144-C B-40145-C B-40146-C B-40147-C B-40148-C 10B-i/ii 10B-1/2 10B-3/4 10B-29/30 10B-35/36 10B-37/38 10B-39/40 10B-48/-
10B-49/-
10B-52/-
10B-62/-
10B-71/-
10B-77/-
10B-86/-
-/10B-108 10B-109/110 VOLUME3 (Cont'd.)
IN ERT B-40143-C B-40144-C B-40145-C B-40146-C B-40147-C B-40148-C 10B-i%i 10B-1/2 10B-3/4 10B-29/30 10B-35/36 10B-37/38 10B-39/40 10B-48/-
10B-49/-
10B-62/-
10B-71/-
10B-77/-
10B-86/-
10B."89/90 10B-93/-
-/10B-108 10B-109/110 UFSAR Revision 11 FII-7 June 1993
NQk MILEPOINT UNIT I FSAR (UPTED)
ERTI N IN TR REMOVE VOLUME3 (Cont'd.)
INSERT 10B-112/-
-/10B-114 10B-115/116 10B-117/118 10B-120/-
10B-125/-
10B-130/-
10B-135/-
10B-140/-
-/10B-142 10B-145/-
10B-155/-
10B-160/-
-/10B-162 10B-166/-
10B-171/-
10B-176/-
10B-181/-
10B-187/-
10B-193/-
10B-205/206 10B-207/208 10B-209/210 10B-211/212 10B-213/214 10B-215/216 10B-221/222 XII-25/26 XII-27/28 XII-29/30 XII-35/36 XII-41/42 10B-112/-
-/10B-114 10B-115/116 10B-117/118 10B-120/-
10B-125/-
10B-130/-
10B-135/-
10B-140/-
-/10B-142 10B-145/-
10B-155/-
10B-160/-
-/10B-162 10B-166/-
10B-171/-
10B-176/-
10B-181/-
10B-187/-
10B-193/-
10B-205/206 10B-'207/208 10B-209/210 10B-211/212 10B-213/214
'0B-215/216 10B.-221/222 10B-222a/222 b XII-25/26 XII-27/28 XII-29/30 XII-35/36 XII-41/41a UFSAR Revision 11 FII-8 June 1993
~:
NQ MILEPOINT UNIT I FSAR (UP+I%3)
IN ERTI N IN TR NS
~REM VE XIII-1/-
XIII-2/-
XIII-3/4 XID-5/sa XIII-Sb/6 XIII-7/8 XIII-9/10 XIII-11/12 XIII-13/14 XIII-15/16 XIII-17/-
XIII-18/-
XIII-19/20 VOLUME3 (Cont'd.)
I~NERT XII-4lb/42 XIII-1/2 XIII-3/4 XIII-5/6 XIII-7/8 XIII-9/10 XIII-11/12 XIII-13/-
XIII-14/-
~
XIII-14a/-
XIII-14b/-
XIII-15/-
-/XIII-16 XIII-16a/16b XIII-17/18 XIII-19/20 XIII-21/22 XIII-23/24 XIII-25/26 XIII-27/-
XIII-28/-
XIII-29/-
UFSAR Revision 11 FII-9 June 1993
NQ MILEPOINT UNIT I FSAR
)
IN ERTI NIN TR NS VOLUME4 REM VE ix/x xi/xii xiii/xiv xviib/xviii xxv/xxvi xxvii/xxviii xxviiia/xxviiib xxxi/xxxia xxxviiia/xxxviiib xxxix/xl xliii/xliv xlv/xlvi li/lii liii/liiia XV-5/6 XV-159/160 XV-161/162 XV-163/164 XV-164a/164b XV-167/168 XV-169/169a XV-169b/169c XV-169d/169e
~ERT ix/x xi/xia xib/xii xiii/xiv xviib/xviii xviiialxviiib xxv/xxvi xxvii/xxviii xxviiia/xxviiib xxxi/xxxia xxxviiia/xxxviiib xxxix/xl xliii/xliv xlv/xlvi li/lii liii/liiia XV-slsa XV-Sb/6 XV-159/159a XV-159b/159c XV-159d/159e XV-159f/159g XV-159h/159i XV-159j/159k XV-159L/159m XV-159n/159o XV-159p/159q XV-159r/159 s XV-159t/159u XV-.159v/159w XV-.159x/160 XV-161/162 XV-163/164 XV-164a/164b XV-167/168 XV-169/169a XV-169b/169c XV-169d/169e UFSAR Revision 11 FII-10 June 1993
0
MILEPOINT UNIT I FSAR (UP+TED)
INSERTI N INSTR N
REM VE XV-169f/169g XV-169h/169i XVI-1/2 XVI-51/52 VOLUME4 (Cont'd.)
I~NERT XV-169f/169g XV-169h/169i XVI-1/2 XVI-51/52 Chapter 18 Tab Appendix A Tab A-1 Appendix B Tab Appendix B UFSAR Revision 11 FII-11 June 1993
ENCLOSURE B TO NMP1L 0768 IDENTIFICATIONOF CHANGES, REASONS AND BASES FOR NMPC-QATR-1 (UFSAR APPENDIX B)
ENCLOSURE C TO NMP1L 0768 INCORPORATION OF THE FPQAP INTO THE NMPC-QATR-1 (UFSAR APPENDIX B)
ENCLOSURE B - IDENTIFICATIONOF CHANGES, REASONS AND BASES FOR NMPCQATR-I (UFSAR APPENDIX B)
Page 1 of28 NET UFSAR APPENDIX B (NMPCQATR-I)
PAGE/SECTION PREVIOUS NMPC+ATR-I REVISION 7 PAGE/SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDINGTHAT TIIEREVISED PROGRAM CONTINUES TO SATISFY 10CFR50 APPENDIX B AND COMMITMENTSPREVIOUSLY APPROVED BY THE NRC Page ALL Section ALL Page ALL Section ALL a.
Rcviscd section and page numbering consistent with conversion of the QATR into UFSAR Appendix B. Section cross-rcfcrences were rcviscd accordingly.
b.
Defined and consistently applied acronyms for commonly used terms throughout the document; c.g., Quality Assurance Topical Report (QATR), Quality.Assurance (QA),
Niagara Mohawk Power Corporation (NMPC),
etc.
c.
Corrected typographical errors and modified punctuation and grammar.
d.
Rcviscd dcpartmcnt title from "Quality Assurance" to "Nuclear Quality Assurance".
The title of "Vice President Quality Assurance" bccamc "Vice Prcsidcnt Nuclear Quality Assurance".
a.
Editorial.
- b. Editorial.
- c. Editorial.
- d. To be consistent with thc current organization title.
- a. N/A
- b. N/A
- c. N/A
- d. The organization title change docs not alter the functions or rcsponsibilitics of the QA (now NQA) department.
Page B-i Table of Contents Page B-ii List of Tables Page B.0-1 Introduction N/A Table of Contents N/A N/A Page i Introduction Revised Table of Contents to rcflcct ncw Appendix B format.
Added List ofTables consistent with FSAR format.
Section B.O changes:
a.
Removed refcrcncc to NMPC's Quality Assurance Policy.
Added reference to NMPC's Nuclear Division Policy and Directives Manual in third paragraph.
b.
Added Fire Protection Program QA requirements by reference to Branch Tcchnical Position (BTP) APCSB 9.5-1, Appendix A.
Editorial.
Editorial.
Section B.O reason:
- a. To morc accurately describe thc location of NMPC's policy regarding Quality Assurance matters.
N/A N/A Section B.O basis:
- a. NMPC's policy regarding Quality Assurance matters has not changed.
It continues to be embodied in thc Nuclear Division Policy and Directives Manual.
- b. The commitment to BTP APCSB 9.5-1, Appendix A, was previously contained in the separate Fire Protection Quality Assurance Program (FPQAP), Introduction and Scope section.
This administrative change docs not alter thc commitmcnt to the BTP.
ENCLOSURE B - IDENTIFICATIONOF CHANGES, REASONS AND BASES FOR NMPCQATR-I (UFSAR APPENDIX B)
Page 2 of 28 NET UFSAR APPENDIX B (NMPCQATR-I)
PAGE/SECTION PREVIOUS NMPC+ATR-I REVISION 7 PAGE/SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDINGTHAT TIIE REVISED PROGRAM CONTINUES TO SATISFY 10CFR50 APPENDIX B AND COMMITMENTSPREVIOUSLY APPROVED BY THE NRC N/A N/A Page ii QA Policy Rcmovcd QA Policy from the QATR.
To eliminate a policy statement that was redundant to that contained within the Nuclear Division Policy and Directives Manual.
NMPC's policy regarding Quality Assurance matters has not changed.
It continues to be cmbodicd in the Nuclear Division Policy and Directives Manual.
ENCLOSURE B - IDENTIFICATIONOF CHANGES, REASONS AND BASES FOR NMPC-QATR-1 (UFSAR APPENDIX B)
Page3 of28 NEW UFSAR APPENDIX B (NMPC-QATR-1)
PAGE/SECTION PREVIOUS NMPC-QATR-1 REVISION 7 PAGE/SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDING THAT THE REVISED PROGRAM CONTINUES TO SATISFY 10CFR50 APPENDIX B AND COMMITMENTSPREVIOUSLY APPROVED BY THE NRC Page B.l-l Section B.1.1 Page 1-1 Section 1.1 Section B.l.l changes:
a.
Changed such as" to "e.g.,".
- b. In second paragraph, inserted "and fire protection" following "safety-related".
c.
Replaced the "Nuclear Support" organizational unit with "Nuclear Licensing".
d.
Dclctcd "Nuclear Controller" from the statement regarding quality ofwork.
Section B.1.1 reason:
- a. Editorial.
- c. To reflect thc current organization structure.
The Nuclear Support unit, which included Licensing, has been dissolved.
The Nuclear Licensing unit now reports directly to the Executive Vice President Nuclear.
- d. The Nuclear Contmller does not perform any activities to which the QA Pmgiam applies.
Section B.1.1 basis:
- a. N/A
- b. Fire Pmtcction QA requirements were previously contained in the separate FPQAP.
This administrative change does not alter any commitmcnts regarding Fire Protection QA.
- c. The functions and rcsponsibilitics of the Nuclear Licensing unit remain unchanged.
The functions and rcsponsibilitics of other units within Nuclear Support were transferred to Nuclear Generation or Nuclear Engineering.
- d. This text change is consistent with the QA Program ResponsibiTity Matrix (UFSAR Appendix B, Table B-l).
B.1.2.1 1.2.1 Section B.1.2.1 changes:
a.
Added "Upper Management Nuclear" bctwccn "NMPC" and "organization".
b.
Changed figure reference fmm "Figure 1-1" (of the QATR) to "Unit 1 UFSAR Figure XIII-1 and Unit 2 USAR Figurc 13.1-1a".
c.
Added "for QA Program Elements" following "Departmental responsibilities".
d.
Revised rcfcrence from "Figure 1-2" to "Table B-1.
Section B.1.2.1 reason:
a.
Editorial, to more clearly describe the organization depicted on the referenced figures.
- b. EditoriaL The NMPC organization is already described in other sections of the Unit Safety Analysis Reports.
- c. Editorial clarification
- d. Editorial. The referenced material continues to be the QA Program Responsibility Matrix (I'able B-l).
Section B.1.2.1 basis:
- a. N/A
- b. N/A
- c. N/A
- d. N/A
0 I
ENCLOSURE B - IDENTIFICATIONOF CHANGES, REASONS AND BASES FOR NMPCQATR-I (UFSAR APPENDIX B)
Page4of28 NET UFSAR APPENDIX B (NMPCQATR-I)
PAGE/SECTION PREVIOUS NMPCQATR-I REVISION 7 PAGE/SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDING THAT THE REVISED PROGRAM CONTINUES TO SATISFY 10CFR50 APPENDIX B AND COMMITMENTSPREVIOUSLY APPROVED BY THE NRC Page B.1-2 Section B.1.2.1.1 Page 1-2 Section 1.2.2.I, 1.2.2.I.A, 1.2.2.I.A.1 Section B.1.2.1.1 changes:
a.
Eliminated the "Manager Executive Staff" position.
- b. Added a paragraph that references Unit 1 UFSAR Section XIII.Aand Unit 2 USAR Section 13.1.1 for descriptions of rcsponsibilitics for the Manager Licensing, Director Nuclear Communications and Public Affairs, and Controller Nuclear Division. The new paragraph also references Unit 1 UFSAR Appendix 10A and Unit 2 USAR Appendix 9A for descriptions of organizational responsibilities regarding the Fire Protection Program.
Section B.1.2.1.1 reason:
- a. To rcflcct the current organization.
- b. To avoid duplication bctwccn UFSAR Appendix B and other sections of the Unit Safety Analysis Reports.
Section B.1.2.1.1 basis Responsibility for thc Quality First Program (Q1P) has bccn transferred to Nuclear Licensing.
Otherwise, as shown on the QA Program RcsponsibiTity Matrix gable B-1), the Manager Executive Staff had ncithcr primary nor support rcsponsibilitics for QA Program elements.
- b. This is an editorial change only Rcsponsibilitics and duties ofkcy nuclear division personnel are already dcscribcd in the Unit Safety Analysis Reports, and QA Program rcsponsibilitics continue to be depicted on the QA Program ResponsibiTity Matrix gable B-1).
c.
Added rcfcrence to Table B-1 for QA Program responsibilities of the Nuclear Generation organization unit.
- c. Editorial clarification.
- c. N/A
- d. Delctcd description of Plant Managers, Unit 1 and Unit 2, responsibilities, and added a paragraph referencing Unit 1 UFSAR Section XIII.Aand Unit 2 USAR Section 13.1.2.
- d. To avoid duplication between UFSAR Appendix B and other sections of the Unit Safety Analysis Reports.
- d. This is an editorial change only.
RcsponsibiTitics and duties of Plant Managers arc already described in the Unit Safety Analysis Reports, and QA Pmgram rcsponsibilitics continue to be dcpictcd on the QA Program Responsibility Matrix (Table B-1).
ENCLOSURE B - IDENTIFICATIONOF CHANGES, REASONS AND BASES FOR NMPC-QATR-1 (UFSAR APPENDIX B)
PageS of28 NET UFSAR APPENDIX B (NMPC+ATR-I)
PAGE/SECTION PREVIOUS NMPCQATR-I REVISION 7 PAGE/SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDING THAT THE REVISED PROGRAM CONTINUES TO SATISFY 10CFR50 APPENDIX B AND COMMITMENTSPREVIOUSLY APPROVED BY THE NRC Page B.1-3 Section B.1.2.1.1 (continued)
Page 1-3 Section 1.2.2.I.A.2 1.2.2.I.A.3 1.2.2.I.B 1.2.2.I.B.1 1.2.2.I.B.2 1.2.2.I.B.3 Section B.1.2.1.1 changes (continued):
a.
Removed description of responsibilities for the Manager Site Scrviccs and thc Manager Nuclear Security.
Note that the Manager Site Services position has been eliminated, and the General Manager Site Support position has been created.
Also, the Training, Procurement, and Emcrgcncy Preparedness functions have been added to thc Nuclear Generation branch (previously part of Nuclear Support).
Section B.1.2.1.1 reason:
a.
To avoid duplication bctwccn UFSAR Appendix B and other sections of thc Unit Safety Analysis Reports, and to rcflcct the current organization.
Section B.1.2.1.1 basis:
a.
Responsibilities and duties of Nuclear Generation Branch Managers are already dcscribcd in the Unit Safety Analysis Reports (sce also the change description for previous QATR Page 1-2). Overall functions performed by the Nuclear Generation branch have not been reduced.
QA Program responsibilities ofthe Nuclear Generation branch continue to bc dcpictcd on the QA Program Responsibility Matrix(Iable B-l).
b.
Removed descriptions of responsibilities for the Manager Units 1 and 2 Enginccring, Manager Technology Scrviccs, and General Supervisor Engineering Performance Services.
Note that the Manager Information Management position has been added to the Nuclear Enginccring branch (previously part of Nuclear Support).
A paragraph was added to refcrencc Unit 1 UFSAR Section XIII.Aand Unit 2 USAR Section 13.1.1 for descriptions of the Nuclear Engineering organization.
- b. To avoid duplication bctwcen UFSAR Appendix B and other sections of thc unit safety analysis reports, and to reflec the current organization.
b.
Responsibilities and duties of Nuclear Enginccring branch managers/supervisors are already described in the Unit Safety Analysis Reports.
Overall functions performed by Nuclear Engineering have not been reduced.
QA Pmgram responsibiTitics of the Nuclear Engineering branch continue to bc depicted on thc QA Pmgram Responsibility Matrix (Table B-l).
c.
Revised rcferencc for "Figurc 1-2" to "Table B-1."
- c. Editorial. The refcrcnced item continues to be the QA Pmgram Responsibility Matrix (Table B-l).
- c. N/A
ENCLOSURE B - IDENTIFICATIONOF CHANGES, REASONS AND BASES FOR NMPC+ATR-I (UFSAR APPENDIX B)
Page 6 of28 NET UFSAR APPENDIX B (NMPCQATR-1)
PAGE/SECTION PREVIOUS NMPC+ATR-I REVISION 7 PAGE/SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDING THAT THE REVISED PROGRAM CONTINUES TO SATISFY 10CFR50 APPENDIX B AND COMMITMENTSPREVIOUSLY APPROVED BY THE NRC Page B.1-3 Section B.1.2.1.1 (continued)
Page 1-4 Section 1.2.2.I.B.4 1.2.2.I.C 1.2.2.I.C.1 1.2.2.I.C.2 1.2.2.I.C.3 1.2.2.1.C.4 1.2.2.I.C.S Section B.1.2.1.1 changes (continued):
a.
Removed description of rcsponsibiTitics for the Manager ISEG.
b.
Rcmovcd description of the Nuclear Support organization, which has been eliminated.
The Manager Licensing and Director Human Resource Development now report directly to the Executive Vice President Nuclear.
The Training and Emergency Preparedness functions werc transferred to Nuclear Gcncration, and the Information Managcmcnt function was transfencd to Nuclear Enginccring.
Section B.1.2.1.1 reason:
a.
To avoid duplication bctwccn UFSAR Appendix B and other sections of the Unit Safety Analysis Reports.
- b. To reflec the current organization.
Section B.l.2.1.1 basis:
a.
This is an editorial change only.
Responsibilities of the Manager ISEG are already described in thc Unit Safety Analysis Reports.
- b. The restructuring of support functions is similar to the organizational structure that cxistcd when Unit 2 was licensed in October 1986.
Thc changes in reporting responsibility do not affec the functions and duties of the affecte groups.
QA Program responsibilities have bccn appropriately reflected in the QA Program Responsibility Matrix gable B-l).
ENCLOSURE B - IDENTIFICATIONOF CHANGES, REASONS AND BASES FOR NMPCQATR-I (UFSAR APPENDIX B)
Page 7 of 28 NET UFSAR APPENDIX B (NMPCQATR-1)
PAGE/SECTION PREVIOUS NMPCQATR-1 REVISION 7 PAGE/SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDING THAT THE REVISED PROGRAM CONTINUES TO SATISFY 10CFR50 APPENDIX B AND COMMITMENTSPREVIOUSLY APPROVED BY THE NRC Page B.1-3 Section B.1.2.1.1 (continued)
Page 1-5 Section 1.2.2.I.C.6 1.2.2.I.D 1.2.2.I.D.1 1.2.2.I.D.2 1.2.2.I.D.3 1.2.2.I.D.4 Section B.1.2.1.1 changes (continued):
a.
Remove description of responsibilities for thc Manager Procurement, who was part of the Nuclear Support organization.
The Procurement function has been transferred to Nuclear Generation.
b.
Revised refcrcnce from "Figure 1-2" to "Table B-1 c.
Revised QA responsibility description from "Performance ofNDE such as ISI and Erosion/Corrosion" to "Performing ISI and Erosion/Corrosion Examinations (Visual and NDE)."
d.
Changed "Managers Quality Assurance Operations Units I and II" to "Managers Quality Assurance Units 1 and 2." Thc rcsponsibilitics of these managers now include Nuclear Enginccring and Licensing activities, which were previously thc responsibility of the Manager Quality Assurance Engineering.
e.
Eliminated "Manager Quality Assurance Engineering."
Thc rcsponsibilitics of this position were divided between thc Managers QA and the ncw position of Manager Quality Assurance Support.
Added "Manager Quality Assurance Support and rcmovcd the descriptions of the Supervisor Quality Assurance Audits and the Supervisor Quality Assurance Services.
Responsibilities of the Manager Quality Assurance Support include all activities previously described for thc Supervisor QA Audits and the Supervisor Quality Scrviccs, and also include Fuels and Procuremcnt activities that were previously thc responsibility of the Manager Quality Assurance Engineering.
Section B.1.2.1.1 reason:
a.
To rcflcct thc current organization.
b.
EditoriaL
- c. To be more specific regarding thc type ofactivity.
- d. To rcflcct position title change and reassignment of duties and responsibiTitics within the QA organization.
e.
To rcflcct reassignment of duties and rcsponsibilitics within thc QA organization.
- f. To rcficct position title change and reassignment of duties and rcsponsibilitics within the QA organization.
Section B.1.2.1.1 basis:
a.
Sce Item b for Previous QATR Page 14.
- b. N/A
- c. This change more completely describes thc types of examinations that may be pcrformcd.
Examination scope and tcchniqucs have not been changed.
d, e 8h f. Streamlining ofthc NQA organization does not change thc functions or responsibilities of NQA. Adequate resources continue to bc available to verify the overall quality of design, operation, maintenance, and modification activities at the Nine Mile Point Nuclear Stations.
ENCLOSURE B - IDENTIFICATIONOF CHANGES, REASONS AND BASES FOR NMPCQATR-I (UFSAR APPENDIX B)
Page 8 of 28 NE)V UFSAR APPENDIX B (NMPC-QATR-1)
PAGE/SECTION PREVIOUS NMPCQATR-I REVISION 7 PAGE/SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDINGTHAT THE REVISED PROGRAM CONTINUES TO SATISFY 10CFR50 APPENDIX B AND COMMITMENTSPREVIOUSLY APPROVED BYTHE NRC Page B.1-4 Section B.1.2.1.1 (continued)
B.1.2.1.2 N/A Page 1-6 Section 1.2.2.I.E 1.2.3.A 1.2.3.B Page 1-7 Section B.1.2.1.1 changes (continued):
a.
Removed description of responsibilities for "Controller Nuclear Division".
Section B.1.2.1.2 changes:
a.
Removed descriptions regarding thc V.P.
Electric Customer Service, General Manager Central Region, Director System Electric Operations, and Manager Meter and Laboratory Facilities.
b.
Added brief description of rcsponsibiTitics of corporate support departments with reference to Unit 1 UFSAR Section XIII.A.1 and Unit 2 USAR Section 13.1.1.
c.
Revised reference from "Figure 1-2" to "Table B-l."
Removed organization chart (added rcfcrcnce to Unit 1 and Unit 2 organization charts in Section B.1.2.1).
Section B.1.2.1.1 reason:
- a. To avoid duplication between UFSAR Appendix B and other sections of the Unit Safety Analysis Reports.
Section B.1.2.1.2 reason:
a%,b.
Editorial. To consolidate organizational descriptions in a single location within the Unit Safety Analysis Reports, thereby avoiding duplication.
- c. Editorial. The referenced item continues to be the QA Program Responsibility Matrix(iable B-l).
To avoid duplication between UFSAR Appendix B and other sections of the Unit Safety Analysis Reports.
Section B.1.2.1.1 basis:
a.
This is an editorial change only.
Responsibilities of thc ControHcr Nuclear Division are already dcscribcd in Unit 1 UFSAR Section XIH.Aand Unit 2 USAR Section 13.1.1.
(Sce also the change description for Previous QATR Page 1-2.)
Section B.1.2.1.2 basis:
a Ec b.
These are editorial changes only. The functions and responsibiTities of the corporate support departments have not changed.
Their descriptions have simply been relocated within the Unit Safety Analysis Reports.
QA Program responsibiTities for these departments continue to be depicted on the QA Program Responsibility Matrix (I'able B-1).
- c. N/A This is an editorial change only. Thc NMPC organization is already shown on figures contained in Unit 1 UFSAR Section XIII.Aand Unit 2 USAR Section 13.1.
The Nuclear Quality Assurance department organization is dcscribcd within the text ofUFSAR Appendix B.
ENCLOSURE B - IDENTIFICATIONOF CHANGES, REASONS AND BASES FOR NMPCQATR-I (UFSAR APPENDIX B)
Page 9 of 28 NET UFSAR APPENDIX B (NMPC+ATR-I)
PAGE/SECTION PREVIOUS NMPC+ATR-I REVISION 7 PAGE/SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDINGTHAT THE REVISED PROGRAM CONTINUES TO SATISFY 10CFR50 APPENDIX B AND COMMITMENTSPREVIOUSLY
. APPROVED BY THE NRC Table B-1 Page 1-8 Figure 1-2 Table B-1 changes:
a.
Changed "Figure 1-2" to "Table B-1",
rcmovcd page number, and relocated table to the cnd of Appendix B.
b.
Revised table header to identify industry standards; i.c., NQA-1 and ANS-3.2.
c.
Added a column to identify Fire Protection QA requirements from BTP APCSB 9.5-1, Appendix A, and merged Fire Protection QA responsibilities (from FPQAP Figure 1.1) into Table B-1.
e.
Removed thc column for Nuclear Support (NSP).
The Nuclear Support organization has been climinatcd.
- f. Added a column to identify Nuclear Licensing (NL) QA Program responsibilities.
- g. Removed the column for Nuclear Security (NS).
Table B-1 reason:
a.
Editorial. These changes are consistent with the FSAR style and format.
- b. Editorial.
- e. To reflect the current organization.
- f. To reflect thc current organization.
g To depict responsibilities at a higher level rather than listing lowcr<icr organizational units.
Table B-1 basis:
- a. N/A
- b. N/A
- c. This is an administrative change only. These requirements were previously contained in Figure 1-1 of the FPQAP.
Overall Fire Protection QA Program rcsponsibiTitics are not reduced.
- d. This is an administrative change only. Thc Risk Management rcsponsibilitics for Fire Protection QA activities were previously contained in Figurc 1-1 of the FPQAP and have not bccn altered.
e.
QA Program responsibilities of Nuclear Support have been transferred to Nuclear Licensing, Nuclear Generation or Nuclear Engineering as appropriate.
See also the change description for Previous QATR Page 1-3.
- f. This is an administrative change only. Nuclear Licensing's responsibilities were previously grouped under the Nuclear Support column, but are now shown separately.
- g. This is an administrative change only. QA Program responsibilities of Nuclear Security are now included as part of the Nuclear Generation column.
ENCLOSURE B - IDENTIFICATIONOF CHANGES, REASONS AND BASES FOR NMPC-QATR-1 (UFSAR APPENDIX B)
Page 10 of 28 NET UFSAR APPENDIX B (NMPCQATR-I)
PAGE/SECTION PREVIOUS NMPCQATR-I REVISION 7 PAGE/SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDINGTIIAT THE REVISED PROGRAM CONTINUES TO SATISFY IOCFR50 APPENDIX B AND COMMITMENTSPREVIOUSLY APPROVED BY THE NRC Table B-1 (continued)
Page 1-8 Figure 1-2 (continued)
Table B-1 changes (continued):
h.
Consolidated the columns for Mctcr &Test (MT) and Mctcr Ec Laboratory (ML)into a single Electric Customer Service Strategic Business Unit (EC) column.
Table B-I reason:
- h. To depict responsibilities at a higher level rather than listing lowcrdicr organizational units.
Table B-1 basis:
- h. This is an administrative change only. The Electric Customer Service Strategic Business Unit (EC) column cncompasscs the previous MT and MLcolumns.
QA Program responsibilities are not rcduccd.
- i. Transferred the Fire Protection QA Program responsibilities of the Meter and Laboratory department from FPQAP Figure 1.1 to Table B-l, under the "EC" column.
This rcsultcd in the addition of "S" entries in the EC column for Criteria III, IV, VII, XIV,XV, and XVIII.
- i. This is an administrative change only. Fire Protection QA Program rcsponsibilitics are not reduced.
- j. The definition of the "P" designation has been cxpandcd by adding "including any Support Responsibilities" and changed "S", "P" identifications to rcflcct ncw definition. Thc following matrix entries werc changed accordingly for "P,S" to "P":
(1) Criterion II, Column NE (2) Criterion VII, Column NE (3) Criterion XII, Column EC (previously Column MT)
- j. To clarify Primary and Support responsibilities.
Allcviates thc need to list both a "P" and an "S" in the matrix column for a single program element.
- j. This change rccognizcs that an organization with primary responsibility for a QA Program element may also have an associated support responsibility.
QA Program rcsponsibilitics are not affected by this change.
ENCLOSURE B - IDENTIFICATIONOF CHANGES, REASONS AND BASES FOR NMPCQATR-I (UFSAR APPENDIX B)
Page 11 of 28 NET UFSAR APPENDIX B (NMPC+ATR-1)
PAGE/SECTION PREVIOUS NMPCQATR-I REVISION 7 PAGE/SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDING THAT THE REVISED PROGRAM CONTINUES TO SATISFY 10CFR50 APPENDIX B AND COIITMENTS PREVIOUSLY APPROVED BY TIIENRC Table B-1 (continued)
Page 1-8 Figurc 1-2 (continued)
Table B-1 changes (continued):
- k. In thc Nuclear Gcncration (NG) column, changed "S" to "P" for Criterion II, changed "P" to "S" for Criterion XV, and changed "P" to "S" for Criterion XVIII.
Table B-1 reason:
- k. To reflec current organizational structure, rcsponsibiTitics, and single-point accountability.
Table B-1 basis:
- k. Overall QA Program responsibilities are not reduced.
These changes account for thc elimination ofthc Nuclear Support organization and the resulting addition of the Training, Procurement, and Emergency Preparedness functions to Nuclear Gcncration.
The indicated responsibilities are consistent with NMPC procedural requircmcnts.
- l. In the Nuclear Engineering (NE) column, added an "S" entry for Criterion XIVand changed "P" to "S" for Criterion XVIII.
L To reflect current organizational responsibilities.
I. Overall QA Program responsibilities are not reduced.
The indicated rcsponsibiTitics are consistent with NMPC procedural requirements.
- m. In the Nuclear Quality Assurance (NQA) column, changed "R" to "S,R" for Criterion VII, changed "R" to "S,R" for Criterion XV, and changed "S,R" to "P,R" for Criterion XVIL
- m. To reflect current organizational rcsponsibiTitics.
- m. Overall QA Program responsibilities are not reduced.
The indicated responsibilities are consistent with NMPC procedural requirements.
- n. In thc Electric Customer Service Strategic Business Unit (EC) column, changed "S" to "P" for Criterion XVII.("S" was previously shown in thc MT and MLcolumns.)
- n. To reflec current organizational responsibilities.
- n. Overall QA Program responsibilities are not rcduccd.
The indicated responsibilities are consistent with NMPC procedural requirements.
ENCLOSURE B - IDENTIFICATIONOF CHANGES, REASONS AND BASES FOR NMPCQATR-I (UFSAR APPENDIX B)
Page 12 of 28 NET UFSAR APPENDIX B (NMPC-QATR-1)
PAGE/SECTION PREVIOUS NMPCQATR-I REVISION 7 PAGE/SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDING THAT THE REVISED PROGRAM CONTINUES TO SATISFY 10CFR50 APPENDIX B AND COMMITMENTSPREVIOUSLY APPROVED BY THE NRC Page B.2-1 Section B.2.1 B.2.2.1 Page 2-1 Section 2.1 2.2.1 Section B.2.1 changes:
a.
Added discussion of the Fire Protection QA Program and refercnccs to thc Unit 1 UFSAR Appendix 10A and Unit 2 USAR Appendix 9A.
b.
Added "fire protection" to activities performed under the QA Program.
Section B.2.2.1 - No changes.
Section B.2.1 reason:
Section B.2.1 basis:
a.
This is an administrative change only. These requirements were previously contained in FPQAP, Revision 3, Sections 1.1 and 2.0.
(Sce Enclosure C for FPQAP changes.)
- b. This is an administrative change only. These requirements were previously contained in FPQAP, Revision 3, Section 2.2.
(Sce Enclosure C for FPQAP changes.)
B.2.2.2 Page B.2-2 Section B.2.2.2 (continued) 2.2.2 Page 2-1 Section 2.2.2 (continued)
Section B.2.2.2 changes:
a.
Changed "Appendix C Matrix" to "Table B-2."
Section B.2.2.2 (continued) - No changes.
Section B.2.2.2 reason:
a.
Editorial.
Section B.2.2.2 basis:
- a. N/A B.2.2.3 Page 2-2 Section 2.2.3 Section B.2.2.3 changes:
a.
This section has been rewritten to rcllcct that the Nuclear Division Policy and Directives Manual sets forth the overall program requirements.
Section B.2.2.3 reason:
a.
To be consistent with current Nuclear Division Policics and Directives.
Section B.2.2.3 basis:
- a. NMPC's policy regarding Quality Assurance matters has not changed.
That policy continues to be embodied in the Nuclear Division Policy and Directives.
B.2.2.4 B.2.2.5 2.2.4 2.2.5 Section B.2.2.4 - No changes.
Section B.2.2.5 - No changes.
ENCLOSURE B - IDENTIFICATIONOF CHANGES, REASONS AND BASES FOR NMPCQATR-I (UFSAR APPENDIX B)
Page 13 of28 NET UFSAR APPENDIX B (NMPC-QATR-1)
PAGE/SECTION PREVIOUS NMPC+ATR-1 REVISION 7 PAGE/SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDINGTHAT TIIEREVISED PROGRAM CONTINUES TO SATISFY 10CFRSO APPENDIX B AND COMMITMENTSPREVIOUSLY APPROVED BY THE NRC Page B.2-3 Section B.2.2.5 (continued)
B.2.2.6 B.2.2.6 (continued)
B.2.2.7 B.2.2.8 Page 2-2 (continued)
Section 2.2.5 (continued) 2.2.6 Page 2-3 Section 2.2.6 (continued) 2.2.7 2.2.8 Section B.2.2.5 (continued) - No changes.
Section B.2.2.6 - No changes.
Section B.2.2.6 (continued) - No changes.
Section B.2.2.7 changes:
a.
Added "Fire Protection Program" bctwcen "arc applied to" and "emergency plans."
b.
Deleted "nuclear" from betwccn "the" and "station".
Section B.2.2.8 - No changes.
Section B.2.2.7 reason:
- b. Editorial.
Section B.2.2.7 basis:
a.
This is an administrative change only. The requirements were previously contained in FPQAP, Revision 3, Section 2.0.
(Sce Enclosure C for FPQAP changes.)
- b. N/A Page B.2%
Section B.2.2.8 (continued)
B.2.2.9 B.2.2.10 B.2.2.11 B.2.2.12 Page B.2-5 Section B.2.2.12 (continued)
B.2.2.13 B.2.2.14 B.2.2.14 (continued)
Page 2-3 (continued)
Section 2.2.8 (continued) 2.2.9 2.2.10 Page 2P Section 2.2.11 2.2.12 Page 2-4 (continued)
Section 2.2.12 (continued) 2.2.13 2.2.14 Page 2-5 Section 2.2.14 (continued)
Section B.2.2.8 (continued) - No changes.
Section B.2.2.9 - No changes.
Section B.2.2.10 changes:
a.
Changed "Appendix A and B of this Topical Rcport" to "Tables B-3 and B-4."
Section B.2.2.11 - No changes.
Section B.2.2.12 - No changes.
Section B.2.2.12 (continued) - No changes.
Section B.2.2.13 - No changes.
Section B.2.2.14 - No changes.
Section B.2.2.14 (continued) - No changes.
Section B.2.2.10 reason:
a.
Editorial.
Section B.2.2.10 basis:
- a. N/A
1 1
ENCLOSURE B - IDENTIFICATIONOF CHANGES, REASONS AND BASES FOR NMPC-QATR-I (UFSAR APPENDIX B)
Page 14 of 28 NET UFSAR APPENDIX B (NMPC-QATR-I)
PAGE/SECTION PREVIOUS NMPCQATR-I REVISION 7 PAGE/SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDING THAT TIIE REVISED PROGRAM CONTINUES TO SATISFY 10CFR50 APPENDIX B AND COMMITMENTSPREVIOUSLY APPROVED BY THE NRC Page B.~
Section B.2.2.14 (continued)
B.2.2.15 B.2.2.16 Page 2-5 Section 2.2.14 (continued) 2.2.15 2.2.16 Section B.2.2.14 (continued) - No changes.
Section B.2.2.15 - No changes.
Section B.2.2.16 changes:
a.
Added "and FSAR sections" after "Tcchnical Specifications."
Section B.2.2.16 reason:
a.
Editorial, to indicate that the SRAB is also discussed in the Unit Safety Analysis Rcpotts.
Section B.2.2.16 basis:
- a. N/A B.2.2.17 B.2.2.18 2.2.17 Page 2W Section 2.2.18 Section B.2.2.17 changes:
a.
Added "Generation" after "Vice President Nuclear."
b.
Added "sections" after "FSAR".
c.
Changed "Administrative Procedures (APs) to "Generation Administrative Procedures (GAPs)".
Section B.2.2.18 - No changes.
Section B.2.2.17 reason:
a.
Editorial, to correct position title.
- b. Editorial.
- c. To be consistent with current Nuclear Division procedure titles.
Section B.2.2. 17 basis:
- a. N/A
- b. N/A
- c. The GAPs have replaced the APs and contain the same requirements regarding SORC rcsponsibiTitics.
Page B.2-7 Section B.2.2.18 (continued)
Page B.3-1 Section B.3.1 B.3.2.1 B.3.2.2 B.3.2.3 B.3.2.4 B.3.2.5 Page 24 Section 2.2.18 (continued)
Page 3-1 Section 3.1 3.2.1 3.2.2 3.2.3 3.2.4 3.2.5 Section B.2.2.18 (continued) - No changes.
Section B.3.1
- No changes.
Section B.3.2.1 - No changes.
Section B.3.2.2 - No changes.
Section B.3.2.3 - No changes.
Section B.3.2.4 - No changes.
Section B.3.2.5 - No changes.
ENCLOSURE B - IDENTIFICATIONOF CHANGES, REASONS AND BASES FOR NMPCQATR-I (UFSAR APPENDIX B)
Page 15 of 28 NEW UFSAR APPENDIX B (NMPC+ATR-1)
PAGE/SECTION PREVIOUS NMPCQATR-I REVISION 7 PAGE/SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDINGTHAT THE REVISED PROGRAM CONTINUES TO SATISFY 10CFR50 APPENDIX B AND COMMITMENTSPREVIOUSLY APPROVED BY THE NRC Page B.3-2 Section B.3.2.6 B.3.2.7 B.3.2.8 B.3.2.9 Page B.3-3 Section B.3.2.10 B.3.2.11 B.3.2.12 B.3.2.13 Page B.3<
Section B.3.2.13 (continucd)
B.3.2.14 B.3.2.15 Page 3-1 (continued)
Section 3.2.6 Page 3-2 Section 3.2.7 3.2.8 3.2.9 Page 3-2 (continued)
Section 3.2.10 Page 3-3 Section 3.2.11 3.2.12 3.2.13 Page 3-3 (continucd)
Section 3.2.13 (continued) 3.2.14 Section B.3.2.6 - No changes.
Section B.3.2.7 - No changes.
Section B.3.2.8 - No changes.
Section B.3.2.9 changes:
a.
Deleted the word "single" prcccding "individual".
Section B.3.2.10 - No changes.
Section B.3.2.11 - No changes.
Section B.3.2.12 - No changes.
Section B.3.2.13 - No changes.
Section B.3.2.13 (continued) - No changes.
Section B.3.2.14 - No changes.
Section B.3.2.15 changes:
a.
Added section describing design control for fire protection systems, cquipmcnt, and components.
Section B.3.2.9 reason:
a.
Editorial.
Section B.3.2.15 reason:
Section B.3.2.9 basis:
- a. N/A Section B.3.2.15 basis:
a.
This is an administrative change only.
These requirements were previously contained in FPQAP, Revision 3, Section 3.0.
(See Enclosure C for FPQAP changes.)
q C
ENCLOSURE B - IDENTIFICATIONOF CHANGES, REASONS AND BASES FOR NMPCQATR-I (UFSAR APPENDIX B)
Page 16 of 28 NET UFSAR APPENDIX B (NMPCQATR-I)
PAGE/SECTION PREVIOUS NMPCQATR-I REVISION 7 PAGE/SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDINGTHAT THE REVISED PROGRAM CONTINUES TO SATISFY IOCFR50 APPENDIX B AND COMMITMENTSPREVIOUSLY APPROVED BY THE NRC Page B.4-1 Section B.4.1 B.4.2.1 B.4.2.2 B.4.2.3 B.4.2.4 B.4.2.5 Page B.4-2 Section B.4.2.5 (continued)
B.4.2.6 B.4.2.7 B.4.2.8 B.4.2.9 Page 4-1 Section 4.1 4.2.1 4.2.2 4.2.3 4.2.4 4.2.5 Page 4-2 Section 4.2.5 (continued) 4.2.6 4.2.7 4.2.8 Section B.4.1
- No changes.
Section B.4.2.1 - No changes.
Section B.4.2.2 - No changes.
Section B.4.2.3 - No changes.
Section B.4.2.4 - No changes.
Section B.4.2 5 - No changes.
Section B.4.2.5 - No changes.
Section B.4.2.6 - No changes.
Section B.4.2.7 - No changes.
Section B.4.2.8 - No changes.
Section B.4.2.9 changes:
a.
Added section describing procurement document control requirements as applied to the Fire Protection Program.
Section B.4.2.9 reason:
Section B.4.2.9 basis:
a.
This is an administrative change only. Thcsc requirements were previously contained in FPQAP, Revision 3, Section 4.0.
(See Enclosure C for FPQAP changes.)
Page B.4-3 Section B.4.2.9 (continued)
N/A Section B.4.2.9 changes (continued):
a.
Sce above.
Section B.4.2.9 reason:
a.
See above.
Section B.4.2.9 basis:
a.
See above.
ENCLOSURE B - IDENTIFICATIONOF CHANGES, REASONS AND BASES FOR NMPCQATR-I (UFSAR APPENDIX B)
Page 17 of 28 NE)V UFSAR APPENDIX B (NMPCQATR-I)
PAGE/SECTION PREVIOUS NMPCQATR-I REVISION 7 PAGE/SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDING THAT TIIE REVISED PROGRAM CONTINUES TO SATISFY 10CFR50 APPENDIX B AND COMMITMENTSPREVIOUSLY APPROVED BY THE NRC Page B.5-1 Section B.5.1 B.5.2.1 B.5.2.2 Page 5-1 Section 5.1 5.2.1 5.2.2 Section B.5.1 changes:
a.
Changed "App. A" to "Table B-3".
Section B.5.2.1 - No changes.
Section B.5.2.2 changes:
a.
Changed "such as" to "e.g.," (two places).
Section B.5.1 reason:
a.
Editorial.
Section B.5.2.2 reason:
a.
Editorial.
Section B.5.1 basis:
- a. N/A Section B.5.2.2 basis:
- a. N/A B.5.2.3 B.5.2.4 B.5.2.5 Page B.6-1 Section B.6.1 B.6.2.1 B.6.2.2 5.2.3 5.2.4 Page 6-1 Section 6.1 6.2.1 6.2.2 Section B.5.2.3 - No changes.
Section B.5.2.4 - No changes.
Section B.5.2.5 changes:
a.
Added section addressing instructions, procedures, and drawings relating to the Fire Protection Program.
Section B.6.1
- No changes.
Section B.6.2.1 - No changes.
Section B.6.2.2 - No changes.
Section B.5.2.5 reason:
Section B.5.2.5 basis:
a.
This is an administrative change only. These requirements were previously contained in FPQAP, Revision 3, Section 5.0.
(Scc Enclosure C for FPQAP changes.)
B.6.2.3 Page B.6-2 Section B.6.2.3 (continued)
B.6.2.4 B.6.2.5 B.6.2.6 Page 6-2 Section 6.2.3 Page 6-2 Section 6.2.3 (continued) 6.2A 6.2.5 6.2.6 Section B.6.2.3 - No changes.
Section B.6.2.3 (continued) - No changes.
Section B.6.2.4 - No changes.
Section B.6.2.5 - No changes.
Section B.6.2.6 - No changes.
I ~-
ENCLOSURE B - IDENTIFICATIONOF CHANGES, REASONS AND BASES FOR NMPC-QATR-1 (UFSAR APPENDIX B)
Page 18 of 28 NEW UFSAR APPENDIX B (NMPC-QATR-I)
PAGE/SECTION PREVIOUS NMPCQATR-I REVISION 7 PAGE/SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDINGTHAT THE REVISED PROGRAM CONTINUES TO SATISFY IOCFR50 APPENDIX B AND COMMITMENTSPREVIOUSLY APPROVED BY THE NRC Page B.7-1 Section B.7.1 B.7.2.1 B.7.2.2 B.7.2.3 Page 7-1 Section 7.1 7.2.1 7.2.2 7.2.3 Section B.7.1
- No changes.
Section B.7.2.1 - No changes.
Section B.7.2.2 - No changes.
Section B.7.2.3 - No changes.
Page B.7-2 Section B.7.2.3 (continued)
B.7.2.4 B.7.2.5 Page 7-2 Section 7.2.3 (continued) 7.2.4 7.2.5 Section B.7.2.3 changes (continued):
a.
In Item 2.c, deleted "Such that" preceding Iccclvlllg, Section B.7.2.4 - No changes.
Section B.7.2.5 - No changes.
Section B.7.2.3 reason:
a.
Editorial.
Section B.7.2.3 basis:
- a. N/A Page B.7-3 Section B.7.2.6 B.7.2.7 B.7.2.8 B.7.2.9 B.7.2.10 Page B.7C Section B.7.2.10 (continued)
Page 7-2 (continued)
Section 7.2.6 7.2.7 Page 7-3 Section 7.2.8 7.2.9 N/A Section B.7.2.6 - No changes.
Section B.7.2.7 - No changes.
Section B.7.2.8 - No changes.
Section B.7.2.9 - No changes.
Section B.7.2.10 changes:
a.
Added section describing control of purchased material, cquipmcnt, and services for fire protection items.
Section B.7.2.10 changes (continucd):
a.
See above.
Section B.7.2.10 reason:
a.
To incorporate Fire Protection QA requirements into the overall QA Program description.
Section B.7.2.10 reason:
a.
Sce above.
Section B.7.2.10 basis:
a.
This is an administrative change only. Thcsc requirements were previously contained in FPQAP, Revision 3, Section 6.0.
(Sce Enclosure C for FPQAP changes.)
Section B.7.2.10 basis:
a.
Sce above.
ENCLOSURE B - IDENTIFICATIONOF CHANGES, REASONS AND BASES FOR NMPCQATR-I (UFSAR APPENDIX B)
Page 19 of 28 NET UFSAR APPENDIX B (NMPCQATR-I)
PAGE/SECTION PREVIOUS NMPCQATR-I REVISION 7 PAGE/SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDINGTHAT THE REVISED PROGRAM CONTINUES TO SATISFY 10CFR50 APPENDIX B AND COMMITMENTSPREVIOUSLY APPROVED BYTIIE NRC Page B.8-1 Section B.8.1 B.8.2.1 B.8.2.2 B.8.2.3 B.8.2.4 Page B.9-1 Section B.9.1 B.9.2.1 B.9.2.2 B.9.2.3 B.9.2.4 B.9.2.5 Page B.9-2 Section B.9.2.5 (continued)
B.9.2.6 B.9.2.7 B.9.2.8 B.9.2.9 Page B.9-3 Section B.9.2.9 (continued)
Page B.10-1 Section B.10.1 B.10.2.1 B.10.2.2 Page 8-1 Section 8.1 8.2.1 8.2.2 8.2.3 8.2.4 Page 9-1 Section 9.1 9.2.1 9.2.2 9.2.3 9.2.4 9.2.5 Page 9-2 Section 9.2.5 (continued) 9.2.6 9.2.7 9.2.8 9.2.9 Page 9-2 Section 9.2.9 (continued)
Page 10-1 Section 10.1 10.2.1 10.2.2 Section B.8.1
- No changes.
Section B.8.2.1 - No changes.
Section B.8.2.2 - No changes.
Section B.8.2.3 - No changes.
Section B.8.2.4 - No changes.
Section B.9.1
- No changes.
Section B.9.2.1 - No changes.
Section B.9.2.2 - No changes.
Section B.9.2.3 - No changes.
Section B.9.2.4 - No changes.
Section B.9.2.5 - No changes.
Section B.9.2.5 (continued) - No changes.
Section B.9.2.6 - No changes.
Section B.9.2.7 - No changes.
Section B.9.2.8 - No changes.
Section B.9.2.9 - No changes.
Section B.9.2.9 (continued) - No changes.
Section B.10.1
- No changes.
Section B.10.2.1 - No changes.
Section B.10.2.2 - No changes.
ENCLOSURE B - IDENTIFICATIONOF CHANGES, REASONS AND BASES FOR NMPC-QATR-1 (UFSAR APPENDIX B)
Page 20 of 28 NET UFSAR APPENDIX B (NMPC-QATR-1)
PAGE/SECTION PREVIOUS NMPC-QATR-1 REVISION 7 PAGE/SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDINGTHAT THE REVISED PROGRAM CONTINUES TO SATISFY 10CFR50 APPENDIX B AND COMMITMENTSPREVIOUSLY APPROVED BY THE NRC Page B.10-2 Section B.10.2.3 B.10.2.4 B.10.2.5 B.10.2.6 B.10.2.7 B.10.2.8 Page 10-2 Section 10.2.3 10.2.4 10.2.5 10.2.6 10.2.7 10.2.8 Section B.10.2.3 changes:
a.
Added "and inspection/survcillancc of activities affectin fire protection."
Section B.10.2.4 - No changes.
Section B.10.2.5 - No changes.
Section B.10.2.6 - No changes.
Section B.10.2.7 - No changes.
Section B.10.2.8 - No changes.
Section B.10.2.3 reason:
Section B.10.2.3 basis:
a.
This is an administrative change only. These rcquircments werc previously contained in FPQAP, Revision 3, Section 7.4.
(Sce Enclosure C for FPQAP changes.)
B.10.2.9 Page B.10-3 Section B.10.2.9 (continued)
Page 10-3 Section 10.2.9 Page 10-3 Section 10.2.9 (continucd)
Section B.10.2.9 - No changes.
Section B.10.2.9 (continued) - No changes.
B.10.2.10 Section B.10.2.10 changes:
a.
Added section describing inspection and surveillance of activities affecting fire protection.
Section B.10.2.10 reason:
Section B.10.2.10 basis:
a.
This is an administrative change only. These requirements were previously contained in FPQAP, Revision 3, Section 7.0.
(Sce Enclosure C for FPQAP changes.)
ENCLOSURE B - IDENTIFICATIONOF CHANGES, REASONS AND BASES FOR NMPCQATR-I (UFSAR APPENDIX B)
Page 21 of28 NET UFSAR APPENDIX B (NMPCQATR-I)
PAGE/SECTION PREVIOUS NMPCQATR-I REVISION 7 PAGE/SECTION IDENTIFICATIONOF CHANGE REASON FOR CIIANGE BASIS FOR CONCLUDING THAT THE REVISED PROGRAM.
CONTINUES TO SATISFY 10CFR50 APPENDIX B AND COMMITMENTSPREVIOUSLY APPROVED BY THE NRC Page B.11-1 Section B.11.1 B.11.2.1 B.11.2.2 B.11.2.3 Page 11-1 Section 11.1 11.2.1 11.2.2 Page 11-2 Section 11.2.3 Section B.11.1
- No changes.
Section B.11.2.1 - No changes.
Section B.11.2.2-No changes.
Section B.11.2.3 - No changes.
Page B.11-2 Section B.11.2.3 (continued)
B.11.2.4 B.11.2.5 B.11.2.6 Page B.12-1 Section B.12.1 B.12.2.1 B.12.2.2 B.12.2.3 B.12.2.4 B.12.2.5 B.12.2.6 B.12.2.7 Page 11-2 Section 11.2.3 (continued) 11.2.4 11.2.5 Page 12-1 Section 12.1 12.2.1 12.2.2 12.2.3 12.2.4 12.2.5 12.2.6 12.2.7 Section B.11.2.3 (continucd) - No changes.
Section B.11.2.4 - No changes.
Section B.11.2.5 - No changes.
Section B.11.2.6 changes:
a.
Added section describing tests and test control for fire protection items.
Section B.12.1
- No changes.
Section B.12.2.1 - No changes.
Section B.12.2.2 - No changes.
Section B.12.2.3 - No changes.
Section B.12.2.4 - No changes.
Section B.12.2.5 - No changes.
Section B.12.2.6 - No changes.
Section B.12.2.7 - No changes.
Section B.11.2.6 reason:
Section B.11.2.6 basis:
a.
This is an administrative change only.
These requirements were previously contained in FPQAP, Revision 3, Sections 8.1 and 8.2.
(Sce Enclosure C for FPQAP changes.)
ENCLOSURE B - IDENTIFICATIONOF CHANGES, REASONS AND BASES FOR NMPC-QATR-1 (UFSAR APPENDIX B)
Page 22 of28 NET UFSAR APPENDIX B (NMPC-QATR-I)
PAGE/SECTION PREVIOUS NMPC-QATR-1 REVISION 7 PAGE/SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDING THAT THE REVISED PROGRAM CONTINUES TO SATISFY 10CFR50 APPENDIX B AND COMMITMENTSPREVIOUSLY APPROVED BY THE NRC Page B.12-2 Section B.12.2.7 (continued)
B.12.2.8 B.12.2.9 Page B.13-1 Section B.13.1 B.13.2.1 B.13.2.2 Page B.14-1 Section B.14.1 B.14.2.1 B.14.2.2 B.14.2.3 B.14.2.4 B.14.2.5 B.14.2.6 B.14.2.7 Page 12-1 Section 12.2.7 (continued) 12.2.8 Page 13-1 Section 13.1 13.2.1 13.2.2 Page 14-1 Section 14.1 14.2.1 14.2.2 14.2.3 14.2.4 14.2.5 14.2.6 Section B.12.2.7 (continued) - No changes.
Section B.12.2.8 - No changes.
Section B.12.2.9 changes:
a.
Added section describing control of measuring and test equipment as it applies to the Fire Protection Program.
Section B.13.1 - No changes.
Section B.13.2.1 - No changes.
Section B.13.2.2 - No changes.
Section B.14.1
- No changes.
Section B.14.2.1 - No changes.
Section B.14.2.2 - No changes.
Section B.14.2.3 - No changes.
Section B.14.2.4 - No changes.
Section B.14.2.5 - No changes.
Section B.14.2.6 - No changes.
Section B.14.2.7 changes:
a.
Added section describing inspection, test, and operating status for fire protection items.
Section B.12.2.9 reason:
Section B.14.2.7 reason:
a.
To incorporate Fire Protection QA requirements into the overall QA Program description.
Section B.12.2.9 basis:
a.
This is an administrative change only. Thcsc requircmcnts were previously contained in FPQAP, Revision 3, Section 10.0.
(Sce Enclosure C for FPQAP changes.)
Section B.14.2.7 basis:
a.
This is an administrative change only. These requirements were previously contained in FPQAP, Revision 3, Section 9.0.
(Sce Enclosure C for FPQAP changes.)
ENCLOSURE B - IDENTIFICATIONOF CHANGES, REASONS AND BASES FOR NMPC-QATR-I (UFSAR APPENDIX B)
Page 23 of 28 NEW UFSAR APPENDIX B (NMPCQATR-I)
PAGE/SECTION PREVIOUS NMPCQATR-I REVISION 7 PAGE/SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDING TIIAT THE REVISED PROGRAM CONTINUES TO SATISFY 10CFR50 APPENDIX B AND COMMITMENTSPREVIOUSLY APPROVED BYTIIE NRC Page B.15-1 Section B.15.1 B.15.2.1 B.15.2.2 B.15.2.3 B.15.2.4 B.15.2.5 B.15.2.6 B.15.2.7 Page 15-1 Section 15.1 15.2.1 15.2.2 15.2.3 15.2.4 15.2.5 15.2.6 15.2.7 Section B.15.1
- No changes.
Section B.15.2.1 - No changes.
Section B.15.2.2-No changes.
Section B.15.2.3 - No changes.
Section B.15.2.4 - No changes.
Section B.15.2.5 - No changes.
Section B.15.2.6 - No changes.
Section B.15.2.7 changes:
- a. Added "on an audit/survcillancc basis" following "documentation".
Section B.15.2.7 reason:
- a. To clarify thc method of documentation review.
Section B.15.2.7 basis:
- a. Thc NQA Department reviews nonconformance documentation on an audit/survcillancc basis.
This clarification docs not change measures cstablishcd to control nonconformances.
B.15.2.8 B.15.2.9 15.2.8 15.2.9 Section B.15.2.8 - No changes.
Section B.15.2.9 - No changes.
a
ENCLOSURE B - IDENTIFICATIONOF CHANGES, REASONS AND BASES FOR NMPCQATR-I (UFSAR APPENDIX B)
Page 24 of28 NET UFSAR APPENDIX B (NMPCQATR-1)
PAGE/SECTION PREVIOUS NMPCgATR-I REVISION 7 PAGE/SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDINGTHAT THE REVISED PROGRAM CONTINUES TO SATISFY 10CFR50 APPENDIX B AND COMMITMENTSPREVIOUSLY APPROVED BY THE NRC Page B.15-2 Section B.15.2.9 (continued)
B.15.2.10 Page 15-1 Section 15.2.9 (continued) 15.2.10 Section B.15.2.9 (continued) - No changes.
Section B.15.2.10 - No changes.
B.15.2.11 B.15.2.12 B.15.2.13 B.15.2.14 B.15.2.15 Page B.16-1 Section B.16.1 B.16.2.1 B.16.2.2 B.16.2.3 B.16.2.4 B.16.2.5 Page 15-2 Section 15.2.11 15.2.12 15.2.13 15.2.14 Page 16-1 Section
~
16.1 16.2.1 16.2.2 16.2.3 16.2.4 Section B.15.2.11 - No changes.
Section B.15.2.12 - No changes.
Section B.15.2.13 changes:
a.
Replaced "based on thc results/inspection of QA activities" with "based on quality trends identified".
Section B.15.2.14 - No changes.
Section B.15.2.15 changes:
a.
Added section describing measures to control nonconforming fire protection materials, parts, or components.
Section B.16.1
- No changes.
Section B.16.2.1 - No changes.
Section B.16.2.2 - No changes.
Section B.16.2.3 - No changes.
Section B.16.2.4 - No changes.
Section B.16.2.5 changes:
a.
Added section describing corrective actions for conditions adverse to fire protection.
Section B.15.2.13 reason:
- a. To be consistent with Section B.15.2.12.
Section B.15.2.15 reason:
Section B.16.2.5 reason:
Section B.15.2.13 basis:
- a. This revision is consistent with Section B.15.2. 12, which states that "quality trends" are identified when evaluating documents that identify nonconformanccs.
Section B.15.2.15 basis:
a.
This is an administrative change only. These rcquircmcnts were previously contained in FPQAP, Revision 3, Section 11.2.
(See Enclosure C for FPQAP changes.)
Section B.16.2.5 basis:
- a. This is an administrative change only. These rcquiremcnts werc previously contained in FPQAP, Revision 3, Sections 11.1 and 11.3.
(See Enclosure C for FPQAP changes.)
ENCLOSURE B - IDENTIFICATIONOF CHANGES, REASONS AND BASES FOR NMPCQATR-I (UFSAR APPENDIX B)
Page 25 of 28 NET UFSAR APPENDIX B (NMPC+ATR-I)
PAGE/SECTION PREVIOUS NMPCQATR-I REVISION 7 PAGE/SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDINGTHAT THE REVISED PROGRAM CONTINUES TO SATISFY 10CFR50 APPENDIX B AND COMMITMENTSPREVIOUSLY APPROVED BY THE NRC Page B.17-1 Section B.17.1 B.17.2.1 B.17.2.2 B.17.2.3 Page B.17-2 Section B.17.2.3 (continued)
B.17.2.4 B.17.2.5 Page 17-1 Section 17.1 17.2.1 17.2.2 17.2.3 Page 17-1 (continued)
Section 17.2.3 (continued) 17.2.4 17.2.5 Section B.17.1
- No changes.
Section B. 17.2.1 - No changes.
Section B. 17.2.2 changes:
a.
Added Item 10, "Records for activities affectin thc Fire Protection Program" and renumbered previous Item 10 as Item 11.
Section B.17.2.3 - No changes.
Section B.17.2.3 (continued) - No changes.
Section B.17.2.4 - No changes.
Section B.17.2.5 - No changes.
Section B.17.2.2 reason:
Section B.17.2.2 basis:
- a. This is an administrative change only. These requirements were previously contained in FPQAP, Revision 3, Section 12.0.
(Sce Enclosure C for FPQAP changes.)
B.17.2.6 B.17.2.7 B.17.2.8 Page 17-2 Section 17.2.6 17.2.7 17.2.8 Section B.17.2.6 - No changes.
Section B.17.2.7 - No changes.
Section B.17.2.8 - No changes.
ENCLOSURE B - IDENTIFICATIONOF CHANGES, REASONS AND BASES FOR NMPCQATR-I (UFSAR APPENDIX B)
Page 26 of28 NET UFSAR APPENDIX B (NMPC-QATR-I)
PAGE/SECTION PREVIOUS NMPCQATR-I REVISION 7 PAGE/SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDINGTHAT THE REVISED PROGRAM CONTINUES TO SATISFY 10CFR50 APPENDIX B AND COMMITMENTSPREVIOUSLY APPROVED BY THE NRC Page B.18-1 Section B.18.1 B.18.2.1 B.18.2.2 B.18.2.3 B.18.2.4 B.18.2.5 B.18.2.6 Page B.18-2 Section B.18.2.6 (continued)
B.18.2.7 B.18.2.8 B.18.2.9 B.18.2.10 B.18.2.11 B.18.2.12 Page B.18-3 Section B.18.2.12 (continued)
Page 18-1 Section 18.1 18.2.1 18.2.2 18.2.3 18.2.4 18.2.5 Page 18-2 Section 18.2.6 Page 18-2 Section 18.2.6 (continued) 18.2.7 18.2.8 18.2.9 18.2.10 18.2.11 N/A Section B.18.1
- No changes.
Section B.18.2.1 - No changes.
Section B.18.2.2 - No changes.
Section B.18.2.3 - No changes.
Section B.18.2.4 - No changes.
Section B.18.2.5 - No changes.
Section B.18.2.6 - No changes.
Section B.18.2.6 (continued) - No changes.
Section B.18.2.7 - No changes.
Section B.18.2.8 - No changes.
Section B.18.2.9 - No changes.
Section B.18.2.10 - No changes.
Section B.18.2.11 - No changes.
Section B.18.2.12 changes:
a.
Added section describing QA audits conducted for thc Fire Protection Program.
Section B.18.2.12 changes (continued):
a.
See above.
Section B.18.2.12 reason:
Section B.18.2.12 reason:
a.
Sce above.
Section B.18.2. 12 basis:
a.
This is an administrative change only. These requirements were previously contained in FPQAP, Revision 3, Section 13.0.
(Sec Enclosure C for FPQAP changes.)
Section B.18.2.12 basis:
a.
See above.
1 V
ENCLOSURE B - IDENTIFICATIONOF CHANGES, REASONS AND BASES FOR NMPCQATR-I (UFSAR APPENDIX B)
Page 27 of 28 NEW UFSAR APPENDIX B (NMPCQATR-1)
PAGE/SECTION Table B-3 Shcct 1 of 1 Table BP Shcct1 of 8 Sheet 2 of 8 Sheet 3 of 8 Shcct 4 of 8 Sheet 5 of 8 Shcct 6 of 8 Sheet 7 of 8 Shcct 8 of 8 PREVIOUS NMPC-QATR-1 REVISION 7 PAGE/SECTION Appendix A Page A-1 Page A-2 Appendix B Page B-1 Page B-2 Page B-3 Page B-4 Page B-5 Page B4 Page B-7 Page B-8 Page B-9 Page B-10 Page B-11 IDENTIFICATIONOF CHANGE Table B-3 changes:
a.
Changed title from "Appendix A" to "Table B-3".
b.
Changed format.
- c. Within the footnote, changed "Appendix A" to "this Table" and "Appendix B" to "Table B4".
d.
Changed items in the Revision/Date column to show the revision number first, foHowcd by the date (consistent with the column title).
e.
Added Item 11, BTP APCSB 9.5-1, Appendix A.
Table BQ changes:
a.
Changed format.
b.
Changed Title from "Appendix B, Intcrprctations and Exceptions ofAppendix A Documents", to "Table B4, Intcrprctations and Exceptions ofTable B-3 Documents."
c.
Changed rcfcrcnccs to Appendix A and Appendix B to Table B-3 and B4, respectively.
d.
In Item S.d, revised reference from "Question and Answer section" to "Appendix 9C".
REASON FOR CHANGE Table B-3 reason:
a.
Editorial.
b.
Editorial.
c.
Editorial.
d.
Editorial.
e.
To incorporate Fire Protection QA requirements into the overall QA Program description.
Table BP reason:
a.
EditoriaL
- b. Editorial.
c.
Editorial.
d.
Editorial. Heavy Loads Analysis was incorporated into Appendix 9C ofthe Unit 2 USAR.
BASIS FOR CONCLUDINGTIIAT TIIE REVISED PROGRAM CONTINUES TO SATISFY 10CFR50 APPENDIX B AND COMMITMENTSPREVIOUSLY APPROVED BY THE NRC Table B-3 basis:
- a. N/A
- b. N/A
- 0. N/A
- d. N/A e.
This is an administrative change only. The commitment to BTP APCSB 9.5.1, Appendix A, was previously contained in FPQAP, Revision 3, Section 2.1.
The commitment to the BTP has not bccn altered.
Table B4 basis:
- a. N/A
- b. N/A
- c. N/A
- d. N/A
S ENCLOSURE B - IDENTIFICATIONOF CHANGES, REASONS AND BASES FOR NMPC+ATR-I (UFSAR APPENDIX B)
Page 28 of28 NEHRU UFSAR APPENDIX B (NMPC-QATR-1)
PAGE/SECTION Table B-2 Sheet 1 of 1 PREVIOUS NMPCQATR-I REVISION 7 PAGE/SECTION Appendix C Page C-1 IDENTIFICATIONOF CHANGE Table B-2 changes:
a.
Changed "Appendix C" to "Table B-2".
b.
Changed format.
c.
Revised the list of QAPs and NIPs.
REASON FOR CHANGE Table B-2 reason:
a.
Editorial.
- b. Editorial.
- c. To bc consistent with current procedure numbers.
BASIS FOR CONCLUDINGTHAT THE REVISED PROGRAM CONTINUES TO SATISFY 10CFR50 APPENDIX B AND COMMITMENTSPREVIOUSLY APPROVED BY THE NRC Table B-2 basis:
- a. N/A
- b. N/A
- c. The revisions to thc rcfcrenccd proccdurc numbers do not affect implementation of any requirements ofthc Quality Assurance Program.
ENCLOSURE C
TO NMP1L 0768 INCORPORATION OF 'IHE FPQAP INTO 'IKENMPC-QATR-1 (UFSAR APPENDIX B)
ENCLOSURE C - INCORPORATION OF THE FPQAP INTO THE NMPC-QATR-1 (UFSAR APPENDIX B)
Page 1 of 21 The following table provides the identification, reason, and basis for changes made to the NMPC-FPQAP since the submittal of Revisions 2 and 3. The table also provides a cross-reference bctwccn FPQAP Revision 2, Revision 3, and thc ncw Unit 1 FSAR (Updated) Appendix B, as an aid to understanding thc manner in which the program descriptions were combined.
FPQAP REV. 2 PAGE/
SECTION FPQAP REV. 3 PAGE/
SECTION NET UFSAR APP. B PAGE/
SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDINGTHAT THE REVISED PROGRAM CONTINUES TO SATISFY BTP 9.5-1 AND COMMITMENTSPREVIOUSLY APPROVED BY THE NRC Page i Page ii Page iii Quality Assurance Policy Page 2 Page 3 Page 4 Page B-1 Page B.O-l Page B.0-1 Section B.O Eliminated NMPC-FPQAP Table of Contents.
Eliminated Introduction and Scope Section of the FPQAP by including Fire Protection Program Quality Assurance requirements into thc applicablc sections of NMPC-QATR-1 (UFSAR Appendix B).
Removed QA Policy from the NMPC-FPQAP and NMPC-QATR-1. Added rcferencc to Nuclear Division Policy and Directives Manual in UFSAR Appendix B, Section B.O.
Editorial. Thc Fire Protection Quality Assurance Program has been combined with applicable sections ofthc NMPC-QATR-1 (UFSAR Appendix B).
To combine the FPQAP with the overall Quality Assurance Program description.
To eliminate a policy statcmcnt that was redundant to that contained within the Nuclear Division Policy and Directives Manual.
N/A Implementation of fire protection quality assurance rcquircmcnts is not affcctcd by the combined program description.
NMPC's policy regarding Quality Assurance matters has not changed.
It continues to be cmbodicd in the Nuclear Division Policy and Directives Manual.
Page iiii and v Page 5 thru 8 N/A Removed Summary of Changes from FPQAP.
EditoriaL The identification, reason, and basis for each change are provided in this enclosure.
N/A
-~
ENCLOSURE C - INCORPORATION OF THE FPQAP INTO THE NMPC-QATR-1 (UFSAR APPENDIX B)
Page 2 of 21 FPQAP REV. 2 PAGE/
SECTION FPQAP REV. 3 PAGE/
SECTION NET UFSAR APP. B PAGE/
SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDING THAT THE REVISED PROGRAM CONTINUES TO SATISFY BTP 9.5-1 AND COMMITMENTSPREVIOUSLY APPROVED BY THE NRC Page 1
Section 1.0 1.1 Page 9 Section 1.0 (Revised) 1.1 (Revised)
Page B.1-1 Section B.O B.1.1 Page B.2-1 Section B.2.1 Change:
a.
Revision 3 changed Section title from "Organization" to "Overview".
b.
Revision 3 added "Fire Extinguishment" and "Smoke Removal" and rephccd "housekeeping" with "Control of Combustibles and Ignition Sources".
Reason:
a.
Editorial. To morc correctly describe the purpose of the section.
- b. Editorial.
Expanded program definition to include additional information from of FPQAP Revision 2.
Basis:
- a. N/A
- b. N/A
- c. The Revision 3 changes and FPQAP Section 1.1 have been superseded by Sections B.1 and B.2. Section B.1.1 was rcviscd to include fire protection activities.
Sections B.1.2.1.1 and B.2.1 have been revised to rcfcrence Unit 1 FSAR (Updated) Appendix 10A and Unit 2 USAR Appendix 9A for a description of the Fire Protection Program.
e.
Editorial. By combining thc FPQAP with the overall QA Program description, the Revision 3 changes to Sections 1.0 and 1.1 no longer apply. The combined QA Program description eliminates redundant information by referencing other sections of thc Unit Safety Analysis Reports.
- c. N/A
\\
J-
ENCLOSURE C - INCORPORATION OF THE FPQAP INTO THE NMPCQATR-I (UFSAR APPENDIX B)
Page3 of21 FPQAP REV. 2 PAGE/
SECTION FPQAP REV. 3 PAGE/
SECTION NET UFSAR APP. B PAGE/
SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDING THAT THE REVISED PROGRAM CONTINUES TO SATISFY BTP 9.5-1 AND COMMITMENTSPREVIOUSLY APPROVED BY THE NRC Page 1
Section 1.2 Page 9 Section 1.2 Page B.1-2 Section B.1.2.1.1 Change:
a.
Revision 3 rcviscd section title from "Implementation" to "Organization".
Reason:
a.
Editorial.
Basis:
- a. N/A b.
Revision 3 rcmovcd the description of Executive Vice President-Nuclear responsibilities.
- b. Editorial. To reflect only thc main administrative structure ofNMPC's fire protection program.
- b. N/A Page 1
Section 1.2.A Page 9 Section 1.2.1 (Revised)
Page B.1-2 Section B.1.2.1.1
- c. The Revision 3 changes and FPQAP Section 1.2 have bccn superseded by Section B.1.2.1.1.
Change:
a.
Revision 3 changed title from "General Superintendent-Nuclear Generation" to "Vice President Nuclear Gcncration".
- c. NMPC's current Organizational structure, including thc responsibilities of the Exccutivc Vice President-Nuclear, is dcscribcd in Section B.1.2.1.1.
Reason:
- a. To reflect current title.
- c. N/A Basis:
a.
Thc title change is administrative and provides the position with greater authority.
- b. The Revision 3 changes and Section 1.2.1 have been supcrscdcd by Section B.1.2.1.1.
b.
FPQAP Section 1.2.1 has bccn combined with QATR Section 1.2.2.
The title changewas previously identified in QATR, Revision 6, Section 1.2.2, which is now Section B.1.2.1.1.
- b. This change was previously addressed in NMPC-QATR-1, Revision 6.
ENCLOSURE C - INCORPORATION OF THE FPQAP INTO THE NMPCQATR-I (UFSAR APPENDIX B)
Page 4 of 21 FPQAP REV. 2 PAGE/
SECTION FPQAP REV. 3 PAGE/
SECTION NET UFSAR APP. B PAGE/
SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDING THAT THE REVISED PROGRAM-CONTINUES TO SATISFY BTP 9.5-1 AND COMMITMENTSPREVIOUSLY APPROVED BY THE NRC Page 1
Section 1.2.A.1 1.2.A.2 1.2.A.3 Page 2 Section 1.2.A.4 1.2.A.S 1.2.A.6 Page 3 Section 1.2.A.6 1.2.A.7 Page 10 Section 1.2.1.1 (Rcviscd)
Page B.1-2 Change:
a.
Revision 3 changed the title of "Station Superintendents, Unit 1 and Unit 2" to "Plant Managers" and included the responsibilities of the Site Superintendent Maintenance, Tcchnical Supcrintcndcnt, Supcrintcndent Training, Site Fire Program Coordinator, Supervisor Operations Support, and Unit Supervisors Fire Protection under the Plant Managers to whom they report.
- b. The Revision 3 change and FPQAP Section 1.2.1.1 have bccn supcrscdcd by Section B.1.2.1.1.
Reason:
- a. To reflect title change and to reflec only the main administrative structure of NMPC's Fire Protection Program.
Fire protection implementation responsibilities are delineated in implementing pmccdurcs.
- b. Editorial. Position title changes were previously idcntificd in QATR, Revision 6, Section 1.2.2, which is now Section B.1.2.1.1.
Organizational rcsponsibilitics for the Fire Protection Program are described in thc Unit Safety Analysis Reports which are refcrcnced in Section B.1.2.1.1.
Basis:
a.
The title change is administrative in nature and docs not change the functions or responsibilities of the position.
The dcscribcd rcsponsibilitics rcficct single-point accountability and do not alter Fire Protection QA Program elements.
- b. N/A
0
ENCLOSURE C - INCORPORATION OF THE FPQAP INTO THE NMPCQATR-I (UFSAR APPENDIX B)
Page5of21 FPQAP REV. 2 PAGE/
SECTION FPQAP REV. 3 PAGE/
SECTION NET UFSAR APP. B PAGE/
SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDINGTHAT THE REVISED PROGRAM CONTINUES TO SATISFY BTP 9.5-1 AND COMMITMENTSPREVIOUSLY APPROVED BY THE NRC Page 4 Section 1.2.B Page 5 Section 1.2.B.1 1.2.B.2 Page 10 Section 1.2.2 Page B.1-2 Section B.1.2.1.1 Change:
a.
Revision 3 changed the title of "Vice President Nuclear Engineering and Licensing" to Vice President Nuclear Enginccring",
revised responsibility description and climinatcd the description of responsibilities for the Fire Protection Enginccr and Manager Nuclear Consulting Services.
Reason:
- a. To reflec that Nuclear Licensing no longer reports to thc Vice Prcsidcnt Nuclear Engineering, and to reflect only thc main administrative structure of thc Fire Protection Program.
Basis:
a.
The change to the organizational structure docs not affec functions or duties related to Fire Protection QA Program elements.
The revised responsibiTity description only reflects single-point accountabiTity; it does not affect the functions or duties of subordinate positions.
- b. The Revision 3 change and FPQAP Section 1.2.2 have been superseded by Section B.1.2.1.1 b.
Editorial. Position title changes were previously idcntificd in QATR, Revision 6, Section 1.2.2, which is now Section B.1.2.1.1.
Organizational responsibilities for thc Fire Protection Program are described in the Unit Safety Analysis Reports which are now referenced in Section B.1.2.1.1.
- b. N/A Page5 &6 Section 1.2.B.2.a Page 10 Section 1.2.2.1 Page B.1-2 Section B.1.2.1.1 Change:
a.
Revision 3 provided a more gcncral description of the Fire Protection Program Manager's responsibilities.
- b. The Revision 3 change and FPQAP Section 1.2.2.1 have bccn superseded by Section B.1.2.1.1.
Reason:
a.
Editorial. To provide a more consolidated description of responsibilities.
- b. Editorial. The responsibilities of the Fire Protection Program Manager are dcscribcd in the Unit Safety Analysis Reports which are referenced in Section B.1.2.1.1.
Basis:
- a. N/A
- b. N/A
ENCLOSURE C - INCORPORATION OF THE FPQAP INTO THE NMPCQATR-I (UFSAR APPENDIX B)
Page 6 of 21 FPQAP REV. 2 PAGE/
SECTION FPQAP REV. 3 PAGE/
SECTION NET UFSAR APP. B PAGE/
SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDING THAT THE REVISED PROGRAM CONTINUES TO SATISFY BTP 9.5-1 AND COMMITMENTSPREVIOUSLY APPROVED BY THE NRC Page 6 Section 1.2.C Page 7 Section 1.2.C.1 1.2.C.2 1.2.C.3 Page 10 Section 1.2.3 Page B.1-3 Section B.1.2.1.1 Change:
a.
Revision 3 changed the title of Vice President-Quality Assurance" to "Vice President Nuclear Quality Assurance".
b.
Revision 3 revised thc description of the Vice President Nuclear Quality Assurance responsibilities and eliminated responsibility descriptions for subordinate positions.
Reason:
- a. To reflect current title.
- b. The Vice Prcsidcnt's rcsponsibilitics were rephrased for clarity.
Subordinate responsibilities were removed to reflect single-point accountability.
Basis:
- a. This change is administrative in nature.
The responsibilities ofthe position have not changed.
- b. The revised rcsponsibiTity description only reflect single-point accountability; it docs not affect the functions or duties of subordinate positions.
- c. The Revision 3 changes and FPQAP Section 1.2.3 have been supcrscdcd by Section B.1.2.1.1.
- c. Editorial. Nuclear Quality Assurance organizational rcsponsibilitics are dcscribcd in Section B.1.2.1.1.
Organizational rcsponsibilitics for the Fire Protection Program are dcscribcd in the Unit Safety Analysis Reports which are rcfcrcnccd in Section B.1.2.1.1.
- c. N/A N/A Page 10 Section 1.2.4 Page B.1-3 Section B.1.2.1.1 Change:
a.
Revision 3 added Vice President Nuclear Support responsibilities.
- b. The Revision 3 change and FPQAP Section 1.2.4 have been superseded by Section B.1.2.1.1.
Reason:
- a. To describe a revised Nuclear Division organizational structure.
- b. To rcflcct the elimination of the Nuclear Support organization.
Basis:
- a. Thc change in reporting structure docs not affect thc functions and duties of the affcctcd gmups.
- b. Thc change in reporting structure docs not affec the functions and duties of thc affecte gmups.
C
ENCLOSURE C - INCORPORATION OF THE FPQAP INTO THE NMPCQATR-I (UFSAR APPENDIX B)
Page 7 of 21 FPQAP REV. 2 PAGE/
SECTION FPQAP REV. 3 PAGE/
SECTION NEW UFSAR APP. B PAGE/
SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDING THAT THE REVISED PROGRAM CONTINUES TO SATISFY BTP 9.5-1 AND COMMITMENTSPREVIOUSLY APPROVED BY THE NRC N/A Page 10 Section 1.2.5 Page B.18-2 Section B.18.2.3 B.18.2.12 Change:
a.
Revision 3 added Section 1.2.5 to describe Safety Review and Audit Board (SRAB) rcsponsibilitics.
Reason:
a.
Editorial. To describe the responsibilities of the SRAB as they relate to Fire Protection QA Program elements.
Basis:
- a. N/A Page 7 Section 1.2.D Page 10 Section 1.2.7 Page B.I<
Section B.1.2.1.2
- b. The Revision 3 change and Section 1.2.4 have been supcrscdcd by Sections B.18.2.3 and B.18.2.12.
Change:
a.
No change in Revision 3.
b.
FPQAP Section 1.2.7 has been superseded by Section B.1.2.1.2.
This section was added to dcscribc overall corporate support rcsponsibilitics and provides a rcfcrence to Unit 1 UFSAR Section III.A.1 and Unit 2 USAR Section 13.1.1 for a further description.
- b. Editorial. SRAB responsibilities are described in Section B.18.2.3 and identified in Section B.18.2.12.
Reason:
- a. N/A
- b. Editorial. To consolidate the description of nonnuclear corporate support responsibilities into a separate section.
- b. N/A Basis:
- a. N/A
- b. N/A
ENCLOSURE C - INCORPORATION OF THE FPQAP INTO THE NMPCQATR-I (UFSAR APPENDIX B)
Page 8 of 21 FPQAP REV. 2 PAGE/
SECTION FPQAP REV. 3 PAGE/
SECTION NEHRU UFSAR APP. B PAGE/
SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDING THAT THE REVISED PROGRAM CONTINUES TO SATISFY BTP 9.5-1 AND COMMITMENTSPREVIOUSLY APPROVED BY TIIENRC Page 8 Section 1.2.E Page N/A Section 1.2 Page B.1-2 Section B.1.2.1.1 Change:
a.
Revision 3 removed the "Manager System Purchasing" position and responsibiTities description.
Reason:
a.
This position is a corporate position.
Purchasing functions are now pcrformcd within thc Nuclear Division.
Basis:
- a. All QA Program rcsponsibiTitics regarding procurement have been assumed by the Nuclear Division Page 8 Section 1.2.F Page N/A Section 1.2 Page B.1-2 Section B.1.2.1.1
- b. The Revision 3 change has been superseded by Section B.1.2.1.1.
Change:
a.
Revision 3 removed the Program Director-Nuclear Materials Management position and responsibilities description.
- b. Editorial. This change was previously identified in QATR, Revision 6, Section 1.2.2.
Section B.1.2.1.1 has been rcviscd to provide a reference to thc Unit Safety Analysis Reports, which describe procurement rcsponsibiTitics.
Reason:
a.
This position is a corporate position.
Materials Management functions were combined with Purchasing functions which arc now performed within the Nuclear Division.
- b. N/A Basis:
- a. AllQA Program rcsponsibilitics regarding Materials Managcmcnt have been assumed by the Nuclear Division.
- b. Thc Revision 3 change has been superseded by Section B.1.2.1.1.
- b. EditoriaL This change was previously identified in QATR, Revision 6, Section 1.2.2.
Section B.1.2.1.1 has been revised to provide a reference to thc Unit Safety Analysis Reports, which describ Materials Management responsibilities.
- b. N/A
ENCLOSURE C - INCORPORATION OF THE FPQAP INTO THE NMPCQATR-I (UMAPPENDIX B)
Page 9 of 21 FPQAP REV. 2 PAGE/
SECTION FPQAP REV. 3 PAGE/
SECTION NET UFSAR APP. B PAGE/
SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDING THAT THE REVISED PROGRAM CONTINUES TO SATISFY BTP 9.5-1 AND COMMITMENTSPREVIOUSLY APPROVED BY THE NRC Page 8 Section 1.2.G Page 8 Section 1.2.H Page 10 Section 1.2.6 Page N/A Section 1.2 Page B.IQ Section B.1.2.1.2 Page B.1-2 Section B.1.2.1.1 Change:
a.
Revision 3 added thc responsibilities of the Supervisor Standards Laboratory.
- b. The Revision 3 change and Section 1.2.6 have bccn superseded by Section 1.2.1.2.
Change:
a.
Revision 3 rcmovcd Supervisors'esponsibilities.
- b. The Revision 3 change has been superseded by Section B.1.2.1.1.
Reason:
a.
Editorial. To bc consistent with the responsibiTitics described in the QATR.
b.
Editorial. The rcsponsibiTities were previously describe in thc QATR. Section B.1.2.1.1 has been revised to pmvidc a reference to thc Unit Safety Analysis Reports which dcscril>cs these responsibilities.
Reason:
a.
To rcflcct only the main administrative structure of the fire protection pmgram.
b.
Editorial. Section B.1.2.1.1 has bccn rcviscd to provide a reference to the Unit Safety Analysis Reports which describ Fire Protection Program responsibilities.
Basis:
- a. N/A
- b. N/A Basis:
- a. The revised responsibility description reflect single-point accountability; it does not affect the functions, duties, or rcsponsibilitics of supervisory positions.
- b. N/A
c v\\
f 3l;
ENCLOSURE C - INCORPORATION OF THE FPQAP INTO THE NMPCQATR-I (UFSAR APPENDIX B)
Page 10 of 21 FPQAP REV. 2 PAGE/
SECTION FPQAP REV. 3 PAGE/
SECTION NEW UFSAR APP. B PAGE/
SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDINGTHAT THE REVISED PROGRAM CONTINUES TO SATISFY BTP 9.5-1 AND COMMITMENTSPREVIOUSLY APPROVED BY THE NRC Page 9 Figure 1.1 Page 11 Figurc 1.1 Table B-1 Change:
a.
Revision 3 removed corporate Purchasing and Materials Managcmcnt Dcpartmcnts, and revised FPQAP Section numbers.
Reason:
a.
To reflec the transfer of Purchasing functions from corporate headquarters to thc Nuclear Division.
Basis:
a.
The Nuclear Division has assumed all QA Program responsibilities regarding Purchasing for the Fire Protection Program.
Page 10 Section 2.1 Page 12 Section 2.1 Page B.2-1 Section B.2.1
- b. Thc Revision 3 changes and Figure 1.1 have been superseded by revised Table B-1.
Change:
a.
Revision 3 dclctcd "uses a graded approach to apply appropriate criteria from 10CFR50, Appendix B to Fire Protection systems or activities" and added "applies the criteria from Branch Technical Position (BTP) 9.5-1.
- b. Thc Revision 3 change and the FPQAP Section 2.1 have been superseded by including Branch Technical Position (BTP) 9.5-1 in Section B.O, and referring to Unit 1 UFSAR Appendix 10A and Unit 2 USAR Appendix 9A in Sections B.2.1.
b.
Editorial. Figure 1.1 has bccn incorporated into Table B-1. QATR Figure 1.1 was previously updated to rcQcct this change.
Reason:
a.
Editorial. To clarify that the QA Program for fire protection applies the criteria from Branch Technical Position (BTP) 9.5-1 to fire protection systems and activities.
- b. To include the QA Program description for fire protection as part of the overall plant QA Program description.
b.
Table B-1 depicts organizational responsibility for implementing the QA Program for fire protection.
(Sce Enclosure B for Table B-1 changes.)
Basis:
a.
NMPC has applied, and continues to apply, the criteria from BTP 9.5-1 in the QA Program for fire protection.
b.
The QA Program elements for fire protection are not altered by combining the FPQAP with the QATR.
~A-
ENCLOSURE C - INCORPORATION OF THE FPQAP INTO THE NMPCQATR-I (UFSAR APPENDIX B)
Page 11 of 21 FPQAP REV. 2 PAGE/
SECTION FPQAP REV. 3 PAGE/
SECTION NET UFSAR APP. B PAGE/
SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDINGTHAT THE REVISED PROGRAM CONTINUES TO SATISFY BTP 9.5-1 AND COMMITMENTSPREVIOUSLY APPROVED BY THE NRC Page 10 Section 2.2 Page 12 Section 2.2 Page B.2-1 Section B.2.1 Change:
a.
Revision 3 removed the word instructions" bctwccn "procedures" and "and".
Reason:
a.
Editorial. "Instructions" arc included in the definition of "other documents".
Basis:
- a. N/A Page 10 Section 2.3 Page 11 Section 3.1 Page 12 Section 1.3 Page 12 Section 3.1 Table B-1 Page B.3P Section B.3.2.15
- b. The Revision 3 change and thc FPQAP Section 2.2 have been superseded by combining Section 2.2 into Section B.2.1.
Change:
a.
Revision 3 moved Section 2.3 to Section 1.3 and updated document titles.
- b. The Revision 3 change and FPQAP Section 2.3 have been superscdcd by incorporating Figure 1.1 into Table B-1.
Change:
a.
Section 3.1 has been renumbercd B.3.2.15.
b.
Editorial. Thc term "instructions" has bccn retained in Section B.2.1.
Reason:
a.
Editorial.
b.
Editorial.
Reason:
a.
Editorial.
- b. N/A Basis:
- a. N/A
- b. N/A. (See EnclosureB for Table B-1 changes.)
Basis:
- a. N/A Page 11 Section 3.2 Page 11 Section 3.3 Page 13 Section 3.2 (Rcviscd)
Page 13 Section 3.3 Page B.3P Section B.3.2.15 Page B.3P Section B.3.2.15 Change:
a.
Revision 3 added "Applicablc work documents invoke design documents as ncccssary to ensure proper fabrication, inspection and testing".
- b. Thc Revision 3 change and FPQAP Section 3.2 have bccn incorporated into Section B.3.2.15.
Change:
a.
Section 3.3 was rcnumbcred B.3.2.15.
Reason:
a.
Editorial. To clarify thc use of design documents as inputs to work documents.
b.
Editorial.
Reason:
a.
Editorial.
Basis:
- a. N/A
- b. N/A Basis:
'a. N/A
\\
0
ENCLOSURE C - INCORPORATION OF TIIE FPQAP INTO THE NMPCQATR-I (UFSAR APPENDIX B)
Page 12 of 21 FPQAP FPQAP REV.2, REV. 3 PAGE/
PAGE/
SECTION SECTION NEW UFSAR APP. B PAGE/
SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDING THAT THE REVISED PROGRAM CONTINUES TO SATISFY BTP 9.5-1 AND COMMITMENTSPREVIOUSLY APPROVED BY THE NRC Page 11 Section 3.4 Page 11 Section 3.5 Page 13 Section 3.4 Page 13 Section 3.5 (Rcviscd)
Page B.3P Section B.3.2.15 Page B.3P Section B.3.2.15 Change:
a.
Section 3.4 was rcnumbercd B.3.2.15.
Change:
a.
Revision 3 dclcted "under the direction and guidance of a Fire Protection Enginccr (qualified) and Quality Assurance Pcrsonncl".
Reason:
a.
Editorial.
Reason:
a.
EditoriaL Implementing procedures dictate thc review rcquircments and the lcvcl of design input required.
Basis:
- a. N/A Basis:
- a. N/A Page 12 Section 4.0 Page 13 Section 4.0 (Revised)
Page B.4-2 Section B.4.2.8 B.4.2.9 Page B 4-3 Section B.4.2.9
- b. The Revision 3 change and FPQAP Section 3.5 have bccn incorporated into Section B.3.2.15.
Change:
a.
Revision 3 rewrote Section 4.0.
Added "such as Underwriters'aboratories or Factory Mutual, willbe procured with the required Esting mark." Also added "Tcchnical changes to procurement documents are proccsscd in a manner commensurate with that used for the original."
- b. Editorial.
Reason:
a.
Editorial. To clarify pmcurcmcnt document control.
- b. N/A Basis:
- a. N/A Page 13 Section 5.0 Page 13 Section 5.0 (Revised)
Page B.5-1 Section B.5.2.5
- b. Thc Revision 3 change and FPQAP Section 4.0 have been superscdcd by rcviscd Sections B.4.2.8 and B.4.2.9.
Change:
a.
Revision 3 deleted "by personnel designated by the rclcvant document".
- b. Thc Revision 3 change and FPQAP Section 5.0 have bccn incorporated into Section B.5.2.5.
- b. Editorial.
Reason:
a.
Editorial. Specified in implementing pmcedures.
- b. Editorial.
- b. N/A Basis:
- a. N/A
- b. N/A
0
ENCLOSURE C - INCORPORATION OF THE FPQAP INTO THE NMPCQATR-I (UFSAR APPENDIX B)
Page 13 of 21 FPQAP REV. 2 PAGE/
SECTION FPQAP REV. 3 PAGE/
SECTION NET UFSAR APP. B PAGE/
SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDING THAT TIIE REVISED PROGRAM CONTINUES TO SATISFY BTP 9.5-1 AND COMMITMENTSPREVIOUSLY APPROVED BY THE NRC Page 14 Section 6.1 6.2 6.3 Page 14 Section 6.0 (Revised)
Page B.7-3 Section B.7.2.10 Page B.7%
Section B.7.2.10 Change:
a.
Revision 3 pmvidcd a general rewrite of Section 6.0.
b.
Revision 3 dclctcd the requirement for Fire Protection Qualified Contractors List (FPQCL) and inserted language which served as the basis for thc FPQCL.
Reason:
a.
Editorial.
- b. This allows a bmader base of suppliers, while maintaining requirements for a listing mark (U.L. or F.M.) or another method of supplier qualification, or source surveillance.
Basis:
- a. N/A
- b. Thc cstablishcd contmls continue to ensure that purchased material, equipmcnt, and scrviccs conform to the pmcurcmcnt documents.
Page 15 Section 7.0 Page 14 Section 6.0 (Rcviscd)
Pages B.7-3 and B.7P Section B.7.2.10 c.
Revision 3 added "General usc items not procured specifically for fire protection applications may be used in fue protection applications.
This includes items such as standard hardware items and gaskets."
- d. Thc Revision 3 changes and FPQAP Section 6.0 have been incorporated into Section B.7.2.10.
Change:
a.
Revision 3 incorporated Section 7.0 "Material Control" into Section 6.0 "Contml of Purchased Material, Equipmcnt and Sciviccs."
- c. To clarify thc use of certain standard items in fire protection systems.
- d. Editorial.
Reason:
a.
Editorial. Consolidationof section.
- c. Noncritical subcomponcnts can bc vcrificd opcrablc based on established controls.
- d. N/A Basis:
- a. N/A
- b. The Revision 3 change and FPQAP Section 6.0 have been incorporated into Section B.7.2.10.
- b. Editorial.
- b. N/A
ENCLOSURE C - INCORPORATION OF THE FPQAP INTO THE NMPCQATR-I (UFSAR APPENDIX B)
Page 14 of 21 FPQAP REV. 2 PAGE/
SECTION FPQAP REV. 3 PAGE/
SECTION NET UFSAR APP. B PAGE/
SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDING THAT THE REVISED PROGRAM CONTINUES TO SATISFY BTP 9S-I AND COMMITMENTSPREVIOUSLY APPROVED BY THE NRC Page 16 Ec 17 Section 8.1 Page 17 Section 8.2 Page 17 Section 8.3 Page 15 Section 7.1 (Revised)
Page 15 Section 7.2 (Revised)
Page 15 Section 7.3 (Revised)
Page B.10-3 Section B.10.2.10 Page B.10-2 Section B.10.2.8 Page B.10-1 Section B.10.2.2 Change:
a.
Revision 3 rcnumbcrcd Section 8.0 to 7.0 "Inspection and Survcillancc."
b.
Revision 3 dcletcd general information and gave more details for scope of inspections, survcillanccs, and ovcrchcck inspections.
- e. Thc Revision 3 changes and FPQAP Section 7.1 have been incorporated into Section B.10.2.10.
Change:
a.
Revision 3 dclctcd "cxccpt as noted in Paragraph 8.1 above, relating to Prcventativc Maintenance and Operational Inspections/Tests."
- b. Thc Revision 3 change and FPQAP Section 7.2 have been supcrscdcd by Section B.10.2.8.
Change:
a.
Revision 3 moved Section 8.3 to Section 7.3 and rcviscd section to include thc term "surveillance" where applicable.
- b. The Revision 3 changes and FPQAP Section 7.3 have been supcrscdcd by Section B.10.2.2.
Reason:
a.
EditoriaL
- b. Editorial. The gcncral information is contained in implementing procedures.
- c. Editorial.
Reason:
a.
Editorial. These exceptions are covered within specific implementing procedures for prcvcntive maintenance.
- b. Editorial. The indcpcndcnce of inspection pcrsonncl is dcscribcd in Section B.10.2.8.
Reason:
a.
EditoriaL b.
Editorial.
Basis:
- a. N/A
- b. N/A
- c. N/A Basis:
- a. N/A
- b. N/A Basis:
- a. N/A
- b. N/A
1
ENCLOSURE C - INCORPORATION OF THE FPQAP INTO THE NMPCQATR-I (UFSAR APPENDIX B)
Page 15 of 21 FPQAP REV. 2 PAGE/
SECTION FPQAP REV. 3 PAGE/
SECTION NET UFSAR APP. B PAGE/
SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDING TIIAT THE REVISED PROGRAM CONTINUES TO SATISFY BTP 9$-1 AND COMMITMENTSPREVIOUSLY APPROVED BY THE NRC Page 17 Section 8.4 Page 18 Figure 8.1 Page 19 Section 9.1 Page 16 Section 7.4 (Rcviscd)
Dclctcd Page 16 Section 8.1 (Rcviscd)
Page B.10-2 Section B.10.2.3 Dclctcd Page B.11-2 Section B.11.2.6 Change:
a.
Revision 3 dclctcd "Quality Assurance/Quality Control", and dclctcd "ovcrchcck inspections and NDE", and added "inspection and or surveillance activities".
- b. The Revision 3 change and FPQAP Section 7.4 have bccn incorporated in Section 10.2.3.
Change:
a.
Revision 3 dcletcd Figure 8.1.
b.
FPQAP Figure 8.1 was omitted from UFSAR Appendix B.
Change:
a.
Revision 3 rcnumbcrcd Section 9.0 to 8.0 "Test and Contml".
b.
Revision 3 revised renumbered Section 8.1 by deleting "The pmgram shall be verified through review, audit or surveillance, based on an evaluation of program details."
e.
The Revision 3 change and FPQAP Section 8.1 have been incorporated into Section 11.2.6.
Reason:
a.
Editorial. Clarificsthat "personnel" performing inspection and surveillance activities shall mcct applicable qualifications.
b.
Editorial.
Reason:
a.
Editorial. Inspcctionand surveillance rcsponsibilitics are spccificd by implementing procedure.
b.
Editorial.
Reason:
a.
Editorial.
b.
Editorial. QA performs audits and survciHance of all areas.
c.
Editorial.
Basis:
- a. N/A
- b. N/A Basis:
- a. N/A
- b. N/A Basis:
- a. N/A
- b. N/A
- c. N/A
ENCLOSURE C - INCORPORATION OF THE FPQAP INTO THE NMPCQATR-1 (UFSAR APPENDIX B)
Page 16 of 21 FPQAP REV. 2 PAGE/
SECTION FPQAP REV. 3 PAGE/
SECTION NET UFSAR APP. B PAGE/
SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDINGTHAT THE REVISED PROGRAM CONTINUES TO SATISFY BTP 9.5-1 AND COMMITMENTSPREVIOUSLY APPROVED BY THE NRC Page 19 Section 9.2 Page 20 Section 10.0 Page 21 Section 11.0 Page 16 Section 8.2 Page 16 Section 10.0 (Rcviscd)
Page 16 Section 9.0 (Rcviscd)
Page B.11-2 Section B.11.2.6 Page B.12-2 Section B.12.2.9 Page B. 14-1 Section B.14.2.7 Change:
a.
Revision 3 rcnumbcred Section 9.2 to 8.2.
- b. The Revision 3 change and FPQAP Section 8.2 have been incorporated into Section B.11.2.6.
Changc:-
a.
Revision 3 rcviscd fust sentence from "Validityof measuremcnts and test willbc assured through the use of appropriate inspection," to read "Validityof inspection, surveilhnce and test results is assured through the use of appropriate measuring".
- b. The Revision 3 change and FPQAP Section 10.0 have bccn incorporated into Section B.12.2.9.
Change:
a.
Revision 3 rcnumbercd Section 11.0 to 9.0 "Inspection, Test and Operating Status".
b.
Revision 3 changed "Mcasurcs shall" to "Measures are.
- c. Thc Revision 3 change and FPQAP Section 9.0 have been incorporated into Section B.14.2.7.
Reason:
a.
Editorial.
b.
Editorial.
Reason:
a.
Editorial.
b.
Editorial.
Reason:
a.
Editorial. Consolidationof sections.
b.
Editorial. Betterwording for program Icvcl document.
- c. EditoriaL Basis:
- a. N/A
- b. N/A Basis:
- a. N/A
- b. N/A Basis:
- a. N/A
- b. N/A
- c. N/A
E
ENCLOSURE C - INCORPORATION OF THE FPQAP INTO TIIE NMPC-QATR-I (UFSAR APPENDIX B)
Page 17 of 21 FPQAP REV. 2 PAGE/
SECTION FPQAP REV. 3 PAGE/
SECTION NET UFSAR APP. B PAGE/
SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDING THAT THE REVISED PROGRAM CONTINUES TO SATISFY BTP 9S-I AND COMMITMENTSPREVIOUSLY APPROVED BY THE NRC Page 22 Section 12.1 Page 17 Section 11.1 (Rcviscd)
Page B.16-1 Section B.16.2.5 Change:
a.
Revision 3 rcnumbcred Section 12.0 to 11.0 and changed heading to "Nonconforming Materials, Parts or Components/Conective Action".
Reason:
a.
Editorial.
Basis:
- a. N/A Page 22 Section 12.2 Page 17 Section 11.2 (Rcviscd)
Page B.15-2 Section B.15.2.15 Page B.16-1 Section B.16.2.2 b.
Revision 3 Section 11.1 was revised to provide a ncw general description.
c.
Revision 3 Change "a" was superscdcdby Section B.15.0 and B.16.0.
Revision 3 Change "b" and FPQAP Section 11.1 have been incorporated into Section B.16.2.5.
Change:
a.
Revision 3 rcnumbercd Section 12.2 to 11.2 and combined former Sections 12.1 and 12.2.
b.
Revision 3 added "and to assure that corrective actions arc taken" to Section 11.2.
- b. Editorial.
- c. Editorial.
Reason:
a.
Editorial.
- b. Editorial. To incorporate Section 13.0 of Revision 2.
- b. N/A
- c. N/A-Basis:
- a. N/A
- b. N/A c.
Revision 3 Change "a" and Section 11.2 have been incorporated into Section B.15.2.15.
Revision 3 Change "b" has been supcrscded by Section B.16.0.
c.
Editorial.
- c. N/A
C
ENCLOSURE C - INCORPORATION OF THE FPQAP INTO THE NMPCQATR-I (UFSAR APPENDIX B)
Page 18 of21 FPQAP REV. 2 PAGE/
SECTION FPQAP REV. 3 PAGE/
SECTION NEW UFSAR APP. B PAGE/
SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDINGTHAT THE REVISED PROGRAM CONTINUES TO SATISFY BTP 9.5-1 AND COMMITMENTSPREVIOUSLY APPROVED BY THE NRC Page 22 Section 12.3 Page 17 Section 11.3 (Rcviscd)
Page B.16-1 Section B.16.2.5 Change:
a.
Revision 3 rcnumbercd Section 12.3 to 11.3 and changed "Documentation shall identify the nonconforming item, descry>e the nonconformance and record the disposition" to "Documentation describes thc condition adverse to fire protection, the nonconforming item, and records the corrective action taken."
Reason:
a.
Editorial. To incorporate Section 13.0 of Revision 2.
Basis:
- a. N/A Page 23 Section 13.0 Page 17 Section 11.0 (Revised)
Page B.16-1 Section B.16.2.2
- b. Thc Revision 3 change and FPQAP Section 11.3 have been incorporated into Section B.16.2.5.
Change:
a.
Revision 3 incorporated Section 13.0 "Corrective Action" into Section 11.0 "Nonconforming Materials, Parts or Components/Corrective Action".
- b. The Revision 3 change and FPQAP Section 11.0 have been supcrscdcd by Section B.16.2.5.
- b. Editorial.
Reason:
a.
Editorial.
- b. Editorial.
- b. N/A Basis:
- a. N/A
- b. N/A Page 24 Section 14.1 Page 17 Section 12.1 (Rcviscd)
Page B.17-1 Section B.17.2.2 Change:
a.
Revision 3 rcnumbercd Section 14.1 to 12.1, "Records".
b.
Revision 3 changed "shall" to "arc".
- c. The Revision 3 changes and FPQAP Section 12.1 have been supcrscdcd by Section B.17.2.2.
Reason:
a.
Editorial.
- b. Editorial.
- c. Editorial.
Basis:
- a. N/A
- b. N/A
- c. N/A
DI
ENCLOSURE C - INCORPORATION OF THE FPQAP INTO THE NMPCQATR-I (UFSAR APPENDIX B)
Page 19 of 21 FPQAP REV. 2 PAGE/
SECTION FPQAP REV. 3 PAGE/
SECTION NET UFSAR APP. B PAGE/
SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDINGTHAT THE REVISED PROGRAM CONTINUES TO SATISFY BTP 9.5-1 AND COMMITMENTSPREVIOUSLY APPROVED BY THE NRC Page 24 Section 14.2 Page 24 Section 14.3 Page 17 Section 12.2 (Rcviscd)
Page 17 Section 12.3 (Rcviscd)
Page B.17-1 Section B.17.2.2 B.17.2.3 Page B.17-2 Section B.17.2.3 Change:
a.
Revision 3 rcnumbcrcd Section 14.2 to 12.2 "Records Control".
b.
Revision 3 replaced "nonconformance and corrective action reports" with "Deviation/Event Reports".
- c. Thc Revision 3 changes and FPQAP Section 12.2 have bccn supcrscdcd by Sections B.17.2.2 and B.17.2.3.
Change:
a.
Revision 3 renumbercd Section 14.3 to 12.3 "Record Rctcntion".
- b. The Revision 3 change and FPQAP Section 12.3 have been supcrscdcd by Section B.17.2.3.
Reason:
a.
Editorial.
b.
Deviation/Event Reports have rcplaccd nonconformanceand corrective action reports.
The change reflects Deviation/Event Reports as controlled records.
c.
Editorial. The Deviation/Event Rcport process was previously identified in the QATR.
Reason:
a.
Editorial.
- b. Editorial.
Basis:
- a. N/A
- b. Deviation/Event Reports are identifiable and rctricvablc.
- c. N/A Basis:
- a. N/A
- b. N/A
ENCLOSURE C - INCORPORATION OF THE FPQAP INTO THE NMPCQATR-I (UFSAR APPENDIX B)
Page 20 of 21 FPQAP REV. 2 PAGE/
SECTION FPQAP REV. 3 PAGE/
SECTION NET UFSAR APP. B PAGE/
SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDING THAT THE REVISED PROGRAM CONTINUES TO SATISFY BTP 9.5-1 AND COMMITMENTSPREVIOUSLY APPROVED BY TIIENRC Page 25 Section 15.1 Page 25 Section 15.2 Page 18 Section 13.1 (Rcviscd)
Page 18 Section 13.2 (Rcviscd)
Page B.18-2 Section B.18.2.12 Page B.18-2 Section B.18.2.12 Page B.18-3 Section B.18.2.12 Change:
I a.
Revision 3 renumbered Section 15.0 to 13.0 and rcviscd title from "Audit"to "QA Audit Program".
b.
Revision 3 renumbcred Section 15.1 to 13.1 and changed wording from "Audits shall be conducted" to "QA Audits arc conducted".
c.
Revision 3 Change "a" has bccn superscdcd by Section B.18.
Revision 3 Change "b" and FPQAP Section 13.1 have been incorporated into Section B.18.2.12.
Change:
a.
Revision 3 rcnumbcrcd Section 15.2 to 13.2 and dclctcd the first paragraph of 15.2 that included three bullets showing audit program frequencies.
b.
Revision 3 added "Fire Protection Program Audits are performed per the rcquircmcnts of the applicable Technical Specifications:
Unit-1 6.5.3.8.g, 6.13.1, and 6.13.2 and Unit-2 6.5.3.8.k, 6.5.3.8.1, and 6.5.3.8.m".
Reason:
a.
EditoriaL b.
Editorial.
c.
Editorial.
Reason:
a.
Editorial.
b.
Editorial.
Basis:
- a. N/A
- b. N/A
- c. N/A Basis:
- a. N/A
- b. N/A c.
Revision 3 incorporated footnote regarding NRC Generic Letter 82-21 into renumbered Section 13.2.
c.
Editorial.
- c. N/A
- d. The Revision 3 changes and FPQAP Section 13.2 have been incorporated into Section B.18.2.12.
d.
Editorial.
- d. N/A
ll l
ENCLOSURE C - INCORPORATION OF THE FPQAP INTO THE NMPCQATR-I (UFSAR APPENDIX B)
Page 21 of21 FPQAP REV. 2 PAGE/
SECTION FPQAP REV. 3 PAGE/
SECTION NET UFSAR APP. B PAGE/
SECTION IDENTIFICATIONOF CHANGE REASON FOR CHANGE BASIS FOR CONCLUDING THAT THE REVISED PROGRAM CONTINUES TO SATISFY BTP 9$-1 AND COMMITMENTSPREVIOUSLY APPROVED BY THE NRC Page 25 Section 15.3 Page 26 Page 18 Section 13.3 (Revised)
Page 9 Section 1.1 Page B.18-3 Section B.18.2.12 Page B.2-1 Section B.2.1 Change:
a.
Revision 3 renumbcrcd Section 15.3 to 13.3 "AuditResults" and added "and the Safety Rcvicw and Audit Board (SRAB)".
- b. The Revision 3 change and FPQAP Section 13.3 have bccn incorporated into Section B.18.2.12.
Change:
a.
Revision 3 revised Section 1.1 to further expand the Fire Protection Program description and dclcted Attachment 1, which contained redundant information.
Reason:
a.
Editorial.
b.
Editorial.
Reason:
a.
Editorial. Incorporated into Section 1.1.
Basis:
- a. N/A
- b. N/A Basis:
- a. N/A Page 27 Deleted Deleted
- b. The Revision 3 change and Section 1.1 have bccn supcrscdcd by Section B.2.1.
Section B.2.1 was rcviscd to include a rcfcrcncc to thc Unit 1 UFSAR Appendix 10A and Unit 2 USAR Appendix 9A.
Change:
a.
Revision 3 deleted Attachment 2.
b.
Editorial. Thc scope ofthe Fire Protection Program is describe in Unit 1 UFSAR Appendix 10A and Unit 2 USAR Appendix 9A.
Reason:
a.
Revision 3, Section 6.0, was revised to dclctc the FPQCL and incorporated the root requirements for the list.
- b. N/A Basis:
a.
The established controls continue to ensure that purchased material, equipment, and services conform to thc procuremcnt documents.
b.
FPQAP Attachment 2 was omitted from UFSAR Appendix B.
b.
Editorial.
- b. N/A
0 l'
I l