ML17056C322
| ML17056C322 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 03/18/1993 |
| From: | Bettenhausen L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Sylvia B NIAGARA MOHAWK POWER CORP. |
| References | |
| NUDOCS 9303290009 | |
| Download: ML17056C322 (10) | |
Text
'ccm,zm v o oocmmm orsr
@nod svsxzrvr REGULA
. Y INFORMATION DISTRIBUTIO SYSTEM (RIDS)
ACCESSION NBR:9303290009 DOC.DATE: 93/03/18 NOTARIZED: NO DOCKET FACIL:50y220 Nine Mile Point Nuclear Station, Unit 1, Niagara Powe 05000220 50-410 Nine Mile Point Nuclear Station, Unit 2, Niagara Moha 05000410 AUTH.NAME AUTHOR AFFILIATION BETTENHAUSEN,L.
Region 1 (Post 820201)
RECIP.NAME RECIPIENT AFFILIATION SYLVIA,B.R.
Niagara Mohawk Power Corp.
D
SUBJECT:
Informs that Region I staff has decided to postpone review of changes to Fire Protection QA Program until revised 6
submitted w/FSAR in June 1993.
DISTRIBUTION CODE:
Q004D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: QA Topical Report,
- Change, Amendment, or Correspondence (D cket Utili I
NOTES:
RECIPIENT ID CODE/NAME BRINKMAN,D.
INTERNAL: ACRS OC/LFMB RGN1 FILE EXTERNAL: DMB/OSS NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME MENNING,J NRR/DRIL/RPEB
~EG F
Ol IHS COPIES LTTR ENCL D
D A
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE V(AS'fE! CONTACT TIIE DOCUMEN'I'ONTROLDESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DIN'RIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 18 ENCL
ll I
~
r 1
Docket Nos.
50-220 50-410 LIAR 18 j993 Mr. B. Ralph Sylvia Executive Vice President - Nuclear Niagara Mohawk Power Corporation 301 Plainfield Road
- Syracuse, New York 13212
Dear Mr. Sylvia:
SUBJECT:
10 CFR 50.54 QUALITYASSURANCE PROGRAM CHANGE REVIEW
References:
(1)
Letter dated January 4, 1993, from Mr. J. Perry to the U. S. Nuclear Regulatory Commission transmitting Revision.3 of the Fire Protection Quality Assurance Program for Nine Mile Point (2)
Letter dated March 2, 1993, from the U. S. Nuclear Regulatory Commission to Mr. B. R. Sylvia identifying a delay in the review of Revision 3 to the Fire Protection Program for Nine Mile Point (3)
Letter dated March 25, 1992, from Mr. J. Perry to the U. S. Nuclear Regulatory Commission transmitting Revision 7 of the Quality Assurance Topical Report Nine Mile Point Station Operations We received your 10 CFR 50.54(a) submittal, Reference (1) above, transmitting Revision 3 to the Fire Protection Quality Assurance Program (FPQAP) for Nine Mile Point.
Region I began an initial review of the FPQAP; however, based on our current review schedule, we found that it would require more than 60 days to complete our review.
You were notified of our schedule delay for completing of our review of the FPQAP for Nine Mile Point by Reference (2),
On March 15, 1993, Mr. N. Spagnoletti and Mr. J. Kroehler of your staff notified Mr.,F. Bower of the Region I office that the FPQAP is again under revision. It was stated that the Fire Protection Quality Assurance Program description willbe combined with the quality assurance program description in the Niagara Mohawk Power Corporation Quality Assurance Program Topical Report for Nine Mile Point Nuclear Station Operations (NMPC-QATR-1) and that this combined quality assurance program description would be OFFICIALRECORD COPY A:NMPFPQAP.FLB &
6:NMPFPQAP.FLB 9303290009 9303i8
'DR ADOCK-, 05000220 I,
p pDR
.eoiovs >~~~~~
Mr. B. Ralph Sylvia MAR 18 lgg3 into the Final Safety Analysis Report [Updated] (UFSAR) for Nine Mile Point Unit 1 that is scheduled to be submitted to the NRC in June 1993.
Reference (3) identified that future updates to the quality assurance program description willbe submitted with the annual updates to the UFSARs for both Nine MilePoint Unit 1 and Unit 2.
Based on the information above, the Region I staff has decided to postpone the review of changes to the Fire Protection Quality Assurance Program until it is revised and submitted with the Nine Mile Point Unit 1 Final Safety Analysis Report (Updated) in June 1993.
At this time, the quality assurance program description willbe reviewed to identify any reductions from previously accepted commitments or changes made to the FPQAP, Revisions 2 and 3, and the NMPC-QATR-1, Revision 7.
The review willalso determine conformance with other appropriate licensing bases documents.
Ifyou have any questions concerning the above, please contact Fred Bower at (215) 337-5328 or Norm Blumberg at (215) 337-5199.
Sincerely, Lee H. Bettenhausen, Chief Operations Branch Division of Reactor Safety OFFICIALRECORD COPY A:NMPFPQAP.FLB 8c 6:NMPFPQAP.FLB
I
~
Mr. B. Ralph Sylvia MAR 1 8 1gg3 CC:
C. Terry, Vice President - Nuclear Engineering J. Perry, Vice President - Quality Assurance Vice President - Nuclear Generation K. Dahlberg, Unit 1 Plant Manager M. McCormick, Unit 2 Plant Manager D. Greene, Manager, Licensing J. Warden, New York Consumer Protection Branch G. Wilson, Senior Attorney M. Wetterhahn, Winston and Strawn Director, Energy Bc Water Division, Department of Public Service, State of New York C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector State of New York, SLO Designee OFFICIALRECORD COPY A:NMPFPQAP.FLB &
G:NMPFPQAP.FLB
Mr; B. Ralph Sylvia bcc:
Region I Docket Room (with concurrences)
L. Bettenhausen, DRS C. Cowgill, DRP N. Blumberg, DRS J. Yerokun, DRP L. Nicholson, DRP S. Greenlee, DRP W. Schmidt, SRI - Nine Mile V. McCree, OEDO R. Capra, NRR J. Menning, NRR D. Brinkman, NRR R. Gramm, NRR F. Bower, DRS J. Caruso, DRS DRS/EB SALP Coordinator D. Holody, EO V. Curley, DRS DRS FILES (2)