Text
May 6, 1988 Docket No. 50-220 Mr. Charles V. Mangan Senior Vice President Niagara Mohawk Power Corporation 301 Plainfield Road
- Syracuse, New York 13212
Dear Mr. Mangan:
DISTRIBUTION Docket File NRCPDR Local PDR PDI-1 Rdg.
CVogan DNeighbors RBenedict OGC EJordan JPartlow ACRS(10)
SVarga BBoger JJohnson,RI
SUBJECT:
PROPOSED TECHNICAL SPECIFICATIONS AND EXEMPTION REQUESTS RELATED TO APPENDIX J (TAC 54152)
The enclosed Safety Evaluation provides the documentation of our review of your submittals containing proposed Technical Specifications and exemption requests related to Appendix J.
The dates of your submittals are November 1, 1983, August 27, 1984 and November 13, 1985.
F As indicated in the Safety Evaluation, we have determined that exemptions are not required in certain cases and that exemptions are not granted in others.
None of your proposed exemption requests is granted.
One exemption request (liquid poison) was withdrawn by you in a letter dated November 11, 1985.
The Safety Evaluation also provides an evaluation of the proposed Technical Specifi-cations.
An amendment is not being issued at this time because the proposed Technical Specifications, if issued, would not blend with the existing Technical Specifications.
Also, there were several Technical Specifications that we found unacceptable, thereby requiring revisions to the proposed Technical Specifications.'ou are requested to provide revised proposed Technical Specifications within 30 days of receipt of this letter.
Several of these needed
- changes, have been discussed with Mr. Pete Francisco of your staff.
Sincerely,
@igQ8X g1gneC ~~>
Robert A. Capra, Director Project Directorate I-1 Division of Reactor Projects, I/II
Enclosure:
As stated cc:
See next page PDI-1 CVogan*
5/02/88 I-1 RBenedict 5/CQ /88
- SEE PREVIOUS ONCURRENCE PDI-1 DNeighbors*:mak 5/02/88 g~Cr PDI-1 RCapra 5/(0/88 8805160010 880506 PDR ADOCK 05000220 P
~
~
y f
P I*
~
II ltN'I II
Docket No. 50-220 Mr. Charles V. Mangan Senior Vice President Niagara Mohawk Power Corporation 301 Plainfield Road
- Syracuse, New York 13212 DISTRIBUTION oc et s
e NRCPDR Local PDR PDI-1 Rdg.
CVogan DNeighbors RBenedict OGC EJordan JPartlow ACRS(10)
SVarga BBoger JJohnson,RI
Dear Mr. Mangan:
SUBJECT:
PROPOSED TECHNICAL SPECIFICATIONS AND EXEMPTION REQUESTS RELATED TO APPENDIX J (TAC 54152)
The enclosed Safety Evaluation provides the documentation for our review of your submittals containing proposed Technical Specifications and exemption requests related to Appendix J.
The dates of the submittals are November 1,
1983, August 27, 1984 and November 13, 1985.
As indicated in the Safety Evaluation, we have determined that exemptions are not required in certain cases and that exemptions are not granted in others.
None of your proposed exemption requests is granted.
One exemption request (liquid poison) was withdrawn by you.
The Safety Evaluation also provides an evaluation of the proposed Technical Specifications.
An amendment is not being issued at this time because the proposed Technical Specifications, if
- issued, would not blend with the existing Technical Specifications.
- Also, there were several Technical Specifications that we found unacceptable, thereby requiring revisions to the proposed Technical Specifications.
You are requested to provide revised proposed Technical Specifications within 30 days of receipt of this letter.
Several of these needed changes have been discussed with Mr. Pete Francisco of your staff.
The reporting and/or recordkeeping requirements of this letter affect fewer than ten respondents; therefore OMB clearance is not required under PL 96-511.
Sincerely,
Enclosure:
As stated Robert A. Capra, Director Project Directorate I-1 Division of Reactor Projects, I/II cc:
See next page PDI-1 gy CVogan 5/g /88 PDI-1 RBenedi ct 5/
/88 PDI DNe bors:mak 5/g 88 PDI-1 RCapra 5/ /88
'g f
teak I ~ I' IJ
~
fk
,I'
~ Il f
I
~
I Ik kk JJ
~
P
Mr. C. V. Mangan Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station, Unit No.
1 CC:
Mr. Trov B. Conner, Jr.,
Esquire Conner 5 Wetterhahn Suite 1050 1747 Pennsylvania
- Avenue, N.
W.
Washington, D.
C.
20006 Mr. Frank R. Church, Supervisor Town of Scriba R.
D.
P2
- Oswego, New York 13176 Mr. James L. Willis General Supt.-Nuclear Generation Niagara Mohawk Power Corporation Nine ~ile Point Nuclear Station Post Office Box 32
- Lycoming, New York 13093 Resident Inspector U.
S. Nuclear Regulatory Commission Post Office Box 126
- Lycoming, New York 13093 Mr. Gary D. Wilson, Esquire Niagara Mohawk Power Corporation 300 Erie Boulevard West
- Syracuse, New York 13202 Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 Ms.
Donna Ross New York State Energy Office 2 Empire State Plaza 16th Floor
- Albany, New York 12223 Mr.
Thomas W.
Roman Unit 1 Station Superintendent Nine Mile Point Nuclear Station Post Office Box 32
- Lycoming, New York 13093
0