Responds to SALP Rept 50-410/86-99 Issued on 870515. Licensing Groups of Units 1 & 2 Combined to Improve Efficiency,Promote Cross Training & Improve Quality of Licensing Submittals
ML18038A266
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 06/25/1987
From: Mangan C
NIAGARA MOHAWK POWER CORP.
To: Russell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
(NMP2L-1060), NUDOCS 8707210722
Download: ML18038A266 (8)


Text

ULATORY, INFORMATION DISTR~ UTION SYSTEM <RIDS)

ACCESSION NBR: 8707210722 DOC. DATE: 87/06/25 NOTARIZED:

NO DOCKET FACIL: 50-410 Nine Mile Point Nuc lear Stationi Unit 2i Niagara Moha 05000410 AUTH. NAME AUTHOR AFFILIATION MANGANiC. V.

Niagara Mohawk Power Corp.

RECIP. NAME

'ECIPIENT AFFILIATION RUSSELLi W. T.

Region 1i Office of Director

SUBJECT:

Responds to SALP Rept 50-410/86-99 issued on 8700515.

Licensing groups of Unit 1

5 2 combined to improve efficiencgi promote cross training 5 improve quality of licensing submittals.

DISTRIBUTION CODE:

IE40D COPIES RECEIVED: LTR J ENCL 0 SIZE:

TITLE: Systematic Assessment of Licensee Performance (SALP) Report

'OTES:

RECIPIENT lD CODE/NAME PD1-1 LA NEIGHBORSi D INTERNAL: ACRS AEOD/DOA COMMISSION NRR MORISSEAUi D NRR/DLPG/HFB NRR/DOEA/EAB NRR/DREP/RPB NRR /P M*S/ILR8 OGC/HDS1 RGN1 FILE 01 COPIES LTTR ENCL 2

1 5

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD1-1 PD MINERi S AEOD BAILEYiB AEOD/DSP/TPAB DEDRO NRR/DEST/SIB NRR/DLPG/PEB NRR/DREP/EPB NRR/DRIS DIR OE~LIEB MANiJ 02 COPIES LTTR ENCL EXTERNAL:

LPDR NSIC NRC PDR TOTAL NUMBER OF COPIES REQUIRED:

LTTR 31 ENCL

i~

t

H T NIAGARA 0 MOHAWK NIAGARAMOHAWKPOWER CORPORATION/301 PLAINFIELDROAD, SYRACUSE, N.Y. 13212/TELEPHONE (315) 474-1511 June 25, 1987 (NMP2L 1060)

Mr. William T. Russell Regional Administrator U.S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA,19406

Subject:

Systematic Assessment of Licensee Performance (SALP) Report No. 50-410/86-99 For Nine Mile Point Unit 2

'ear Mr. Russell:

On June 12,

1987, Niagara Mohawk met with representatives of the Nuclear Regulatory Commission at our Training Center to discuss the latest Systematic Assessment of Licensee Performance (SALP) Report for Nine Mile Point Unit 2 issued on May 15, 1987.

As requested by the NRC, this letter transmits Niagara Mohawk's response to the SALP Report on an expedited basis and includes information relating to discussions at the meeting.

As stated at the meeting, we have no overall disagreement with the evaluation set forth by the SALP review board.

We have reviewed the report and have taken actions and plan to take others to improve operation of the unit, particularly those areas ident'ified as deficiencies, including licensing activities, management oversight of operation and surveillance testing.

~Li cens1n We acknowledge that licensing performance during this evaluation period was adversely affected by schedule pressures.

These schedules 'created inefficiencies in manpower resources for both the NRC and Niagara Mohawks We are working to develop more realistic schedules as demonstrated by the successful replacement of the Main Steam Isolation Valves from the ball type valves to the wye-.pattern globe valves.

7~5 pDR gDOCK o PDR g7072107~

8 O04io

Page 2

0 We have implemented several changes to improve internal communications and

. the technical quality of submittals.

Licensing engineers have been assigned to each of the two Nine Mile Point Units.

These individuals have the responsibility for monitoring the plant status and the day-to-day activities at the facilities As part of their duties, they notify and keep the staff apprised of any significant activities that.occur at the units so that appropriate licensing actions can be considered.

We have combined the licensing groups of Unit 1

and Unit 2 under a single manager.

This consolidation improves efficiency, promotes cross training and improves the quality of licensing submittals by more effectively utilizing personnel experienced in licensing matters related to an operating station.

These experienced personnel have a broad background in regulatory requirements, specifically exemption requests and license change requests.

~0erat1ons The SALP report identified weaknesses in operation resulting from personnel

errors, lack of Technical Specification understanding and Control Room conduct.

To correct personnel

errors, senior management has stressed in meetings and letters to our employees the necessity to follow procedures and the need for attention to detail.'he Unit 2 Station Superintendent has also emphasized these same requirements
and, where appropriate, has taken disciplinary action in response to these deficiencies, Several programs are being utilized to enhance operator understanding of Technical Specifications including the assignment of a Unit Licensing
Engineer, the creation of a Lessons Learned book, the addition of Technical Specification cross reference sheets and simulator training.

The assignment of a Unit Licensing Engineer facilitates licensing interpretations when needed.

The Lessons Learned book contains information valuable to the operating crews such as Licensee Event Reports, Occurrence Reports and Technical Specification interpretations.

The Technical Specification interpretation section of the book centralizes important information used by the Control Room personnel in understanding and implementing Technical Specifications.

The cross reference sheets =identify the appropriate technical specification sections for a particular system or component.

Utilization of the index will assure a more thorough technical specification review and improved compliance.

In addition, simulator sessions will include more situational exercises requiring operators to examine Technical Specifications and then make appropriate operational decisions.

Control Room conduct during the evaluation, period steadily improved as the construction effort subsided.

We established a Work Group Coordinator and an Operations Support Office to reduce the administrative burden on the Station Shift Supervisor and to reduce the Control Room traffic.

. The Station Superintendent emphasized the necessity to restrict Control room access by letters and meetings.

We also erected rope barriers and assigned a Control Room access point to further restrict access.

These actions have reduced Control Room traffic.

Further improvements are being evaluated.

~

Page 3

Senior Niagara Mohawk management will continue to oversee and evaluate Control Room activity as well as other aspects of our operation.

To oversee plant operation during the initial phases of startup, we have formed two groups:

The Management Oversight Committee,. comprised of our senior management and the Self Appraisal Team, largely comprised of senior plant managers.

The Self Appraisal Team will examine daily operations and various station activities and provide critical feedback to responsible managers and to the Management Oversight Committee.

The team members will conduct their own reviews as well as utilize in-house expertise, reports and other documentation generated from existing programs.

Niagara Mohawk is confident that the specific actions, which were discussed in this letter and at our meeting, will result in improvements in the deficient areas identified by the SALP review board.

In addition, Niagara Mohawk is committed to overall excellence in its operation during the forthcoming SALP review period.

We recognize that the startup test program is a critical time for a utility and expect to bring our full management resources to bear to assure a safe and efficient ascent to full power operation.

Sincerely, NIAGARA MOHAWK POWER CORPORATION C.

V.

Ma n

Senior Vice President RGS/mf 2104E xc:

Mr. R. A. Capra, Director Mr.

W. A. Cook, Resident Inspector

e I