ML18037A258
| ML18037A258 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 05/12/1980 |
| From: | Rhode G NIAGARA MOHAWK POWER CORP. |
| To: | Robert Carlson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML18037A259 | List: |
| References | |
| NUDOCS 8005270481 | |
| Download: ML18037A258 (4) | |
Text
a N>l)
REGULATO~INFORMATION DISTRIBUTION b&STEM (RIDS)
'CCESSION NBR:8005270481 DOC ~ DATE: 80/05/12 NOTARIZED:
i DOCKET FACIL:50 010 Nine Mile Point Nuclear Stations Unit 2g Niagara Moha 05000410 AUTH'AME AUTHOR AFFILIATION RHODEiGgK ~
Niagara Mohawk Power Corp.
RECIP ~ NAME RECIPIENT AFFILIATION CARLSONzRqT ~
Region ip Philadelphiai Reactor Construction 8 Engineeri
SUBJECT:
Forwards interim deficiency rept re environ L seismic qualification of electrical equipment to be used at facility.
DISTRIBUTION CODE:
B019S COPIES RECEIVED:LTR ~
ENCL SIZE:
j
/ +j TITLE; Construction Deficiepcy Report (10CFR50
~ 55E)
NOTES:
1 1
2 2
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
16 16 EXTERNAL! 03 LPDR ACRS RECIPIENT COPIES ID CODE/NAME LTTR ENCL ACTION; 10 PM ff. QZ'L,vg+
1 1
20 LAg ~~pp y 1
1 INTERNAL:
REG FILE 05 08 MPA 10 QAB 13FIELD COOR/IE 17 AD PLANT SYS 22 DIR DPM AD/RCI/IE AEOD GEOSC IENCES BR IEC SYS BR MECH ENG BR STRUCT ENG. BR RECIPIENT ID CODE/NAME 15 BC L-art.AQ 21 AD 02 NRC PDR
'7 EDO L STAFF 09 DEPY DIR DPM 11 STANDRDS DEV 16 AD FOR ENGR 17 AD REAC SFTY 23 OELD AD/SITE TECH DIRECTOR DSE HANAUERgS ~
MATL ENG BR PONER SYS BR 04 NSIC COPIES LTTR ENCL 1
1 1
1 1.
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
@AY 2 q j980 TOTAL NUMBER OF COPIES REQUIRED:
LTTR Q8 ENCL 48
R
,0 0
h I.
I n
V
~
A
hl 7 NIAGA, H V MOHAWK NIAGARAMOHAWKPOWER CORPORATION/300 ERIE BOULEVAROWEST, SYRACUSE, N.Y. 13202/TELEPHONE (315) 474-1511 May 12, 1980 Office of Inspection and Enforcement Region I Attn:
Mr.. R. T. Carlson Reactor Construction and E'ngineering Suppor t Br anch U., S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 Oear Mr. Garison:
Subject:
Nine Mile Point Unit 2 Oocket No. 50-410 On April 10,, 1980 Mr. A. Cerne of your staff was informed by telephone of a potential reportable deficiency under 10 CFR 50.55(e).
This deficiency concerns the environmental and seismic qualification of electrical equipment to be used at Nine Mile Point Unit 2.
Attached is our interim report in accordance with Section 50.55(e)
(3) of the Commission's Regulations.
A final report will be provided by July 30, 1980.
Very truly yours, PEF:jk NIAGARA MOHAWK POWER CORPORATION
/g(
erald K. Rhode Vice President System Project Management QO