| Site: | Nine Mile Point |
| Issue date: | 06/30/1984 |
| From: | STONE & WEBSTER ENGINEERING CORP. |
| To: | |
| Shared Package | |
| ML18037A014 | List: |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737 GL-82-33, PROC-840630, NUDOCS 8407050199 | |
| Download: ML18037A015 (2) | |
Text
Ago Avaiiablo Ou
>5peetare Card SUBMIT PLAN TO NRC I
PREPARE DCRDR SPEC.
SELECT HFE CONSULTANT NRC REVIEW OF PLAN 6/30/84 START REVIEW DCRDR TEAM ORIENTATION I
OPERATING EXPERIENCE REVIEW PERSONNEL AVAILABLEFOR QUESTIONNAIRE 6 INTERVIEWS I
INVENTORY 9/1 CONTROL ROOM 6 PANELS AVAILABLE SURVEY IO/1 I
(DRAFT) EMERGENCY OPERATING PROCEDURES (EOPs) AVAILABLE TASK ANALYSIS VERIFICATION I
1/I/85 I/15 OPERATING CREW AVAILABLE I
VALIDATION (WALK THROUGHS)
ASSESSMENT G
IMPROVEMENT PREPARE FINAL REPORT 2/I 3/21 Tl
'APPRTURE CARB SUBMIT FINAL REPORT TO NRC f
NRC REVIEW OF FINAL REPORT LOAD FUEL 4/21 10/21 LEGEND:
Ql HFE CONSULTANT SUBMIT TASK COMPLETION REPORT TIME INTERVALS IN WEEKS (DATES TENTATIVE)
FIGURE 1-1 ACTIVITY SCHEDULE DETAILED CONTROL ROOM DESIGN REVIEW NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT -UNIT 2
j J
'E I
I 0>>
\\