Text
Docket Sos.
50-259, 50-2 and 50-296 Tennessee Valley Authority ATTN:
Dr. Mark 0. Hedford, Vice President Nuclear Assurance, Licensing and Fuels 3B Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801
Dear Dr. Hedford:
Febr y 25, 1gg3
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION REGARDING TVA'S PROPOSED UPGRADE OF THE REACTOR BUILDING RADIATION HONITORING SYSTEM FOR BROWNS
- FERRY, UNITS 1, 2,
AND 3 (TAC NOS.
- H84161, H84162, AND H84163)
By letter dated July 23, 1992, the Tennessee Valley Authority (TVA) submitted a license amendment request (TS 316) to revise the Browns Ferry Nuclear Plant (BFN) Technical Specifications (TS).
This amendment request would make the BFN TS consistent with TVA's proposed analog-to-digital upgrade of the Reactor Building Ventilation Radiation Monitoring System (RBVRH).
After reviewing TVA's submittal, the staff has determined that some additional information will be necessary in order for the staff to complete its safety evaluation.
Therefore, TVA is hereby requested to provide the additional information as specified in the enclosed list.
TVA should respond to this request for additional information (RAI) as soon as possible, but no later than thirty days from the date of this RAI.
This requirement(s) affects 9 or fewer respondents and, therefore, is not "subject to Office of Management and Budget review under P.L.96-511.
If you have any questions regarding the content of this RAI, please contact Thierry H. Ross, NRC Project Manager at (301) 504-1474, Sincerely, FredePick J.
IPe@on", Director Project Directorate II-4 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Enclosure:
Request for Additional Information cc w/enclosure:
See next page Distribution
'Docket File
'BFN Rdg. File G. Lainas J. Williams H. Sanders ACRS(10)
P. Frederickson RII E. Merschoff RII NRC
& Local PDRs S.
Varga F. Hebdon, T.
Ross 010{jo"-
Pl~~~i f
1
~+ fQr, ~mr
/
OFC NAME DATE:
PDII-4 LA Wonders 93 PDII-4 PH TRoss:as 4 x z9'3 PDII-4 PH JWilliam
>/W 93 PDII 4 D
FHe on 93 DOCUMENT NAME:
TS316RAI.BFN 9303030140 930225 PDR ADOCK 05000259 P
0, l
4 Kp
.'I I
Browns Ferry Nuclear Plant CC:
Mr. John B. Waters, Chairman Tennessee Valley Authori'ty ET 12A 400 West Summit Hill Drive Knoxville, Tennessee 37902 Mr. J.
R.
Bynum, Vice President Nuclear Operations 3B Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801 Site Licensing Manager Browns Ferry Nuclear Plant Tennessee Valley Authority P.O.
Box 2000
- Decatur, Alabama 35602 Mr. 0. J. Zeringue, Vice President Browns Ferry Nuclear Plant Tennessee Valley Authority P.O.
Box 2000
- Decatur, Alabama 35602 Mr. M. J. Burzynski, Manager Nuclear Licensing and Regulatory Affairs 5B Lookout Place Chattanooga, Tennessee 37402-2801 TVA Representative Tennessee Valley Authority 11921 Rockville Pike Suite 402 Rockville, Maryland 20852 General Counsel Tennessee Valley Authority ET 11H 400 West Summit Hill Drive Knoxville, Tennessee 37902
- Chairman, Limestone County Commission P.O.
Box 188
- Athens, Alabama 35611 State Health Officer Alabama Dept. of Public Health 434 Monroe Street Montgomery, Alabama 36130-1701 Regional Administrator U.S.N.R.C.
Region II 101 Marietta Street, N.W.
Suite 2900 Atlanta, Georgia 30323 Mr. Charles Patterson Senior Resident Inspector Browns Ferry Nuclear Plant U.S.N.R.C.
Route 12, Box 637
- Athens, Alabama 35611 Si te gual ity Manager Browns Ferry Nuclear Plant Tennessee Valley Authority P. 0.
Box 2000
- Decatur, Alabama 35602
ENCLOSURE NRC RE/VEST FOR ADDITIONAL INFORMATION REGARDING TS-316 1.
Provide NEDC-3197-A "NUHAC gualification Report for RBVRH System for TVA BFN Units 1, 2, and 3," November 1991.
2.
Is GE performing additional EHI/RFI environmental tests to include the broader frequency ranges of the environmentf If so, describe the tests in detail.
3.
Provide the onsite EHI/RFI survey plan and additional information necessary to demonstrate that the Nuclear Measurement Analysis and Control (NUHAC) Reactor Building Ventilation Radiation Monitors (RBVRH) are qualified to operate at the Browns Ferry Nuclear Plant.
The onsite EHI/RFI survey should include the survey of the NUHAC RBVRH installed environment during plant start-up and normal power output level to show that the NUMAC RBVRM operating environment is well within the tested envelope.
4.
Provide the drift analysis report, GE-NE-533-020-0492 "Reactor Building Vents Radiation Monitoring System Drift Rate Calculation for Tennessee Valley Authority Browns Ferry Nuclear Plant."
5.
Provide the TVA's maintenance document on the high voltage adjustment, which assures that the GH voltage drift is well within the permissible values between calibrations.
6.
Provide the following GE NUMAC RBVRH software development requirement documents:
a.
- 23A5161, "NUMAC Software Configuration Management Plan,"
Revision 1
b.
- 23A5162, "NUHAC Software Management Plan," Revision 2
c.
- 23A5163, "NUMAC Software Verification and Validation Plan,"
Revision 3
7.
Describe the hardware configuration management for the NUMAC RBVRH.
8.
Describe the training program for the NUMAC RBVRM.
0'
~
V