,. f -:-',
BFN TECHNICAL SPECIFICATIONS 6.0 ADMINISTRATIVE CONTROLS 6.0 ADMINISTRATIVE CONTROLS 6.1 RESPONSIBILITY
(, ~7~0 6 )
The Plant Manager has onsite responsibilities for the safe operation of the facility and shall report to the Browns Ferry Site Director.
In the z
absence of the Plant Manager, a Plant Superintendent will assume his
(
responsibilities.
6.2 ORGANIZATION g)qC" g II "
OP<"
(&isabel'
)
~
the-pedant is-show~a-Fi'gure-6-;2-"1-.-
.'Pf t:5<fF:
6.2. 2
'~nizati~~rth~perati on-af the. plan t-shall be-shown-in" Figure-6 2-2
- a. Shift manning reguirements, shall as a minimum, be as described in Table 6.2.A and below.
b.
A licensed senior reactor operator shall be present at the site at lAQ t cqD, wOQ'0 OO MIO 80 eR RU 80 oa N
OK RA mn n-BFNit 2 lunik i,Za~3 6.0-1 all times when there is fuel in the reactor.
Amendment No. 134
G, C'4 P
~
~
~
z p
An onsite and an offsiti orga'nization. shall..be. estabLished: for unit,
, operation and corporate management.,
The onsite and, offsite organization shall'nclude the positions for activities affecting the safety of -the nuclear power plant.
I a.
Lines of authority> responsibility, and communication shall be
~...
established,and'defined from the highest management levels through intermediate levels to and including all operating organ'zation positions.
These relationships shall be documented and updated, as. appropriate, in the form of organizationaL charts>
functional descriptions of departmental responsibilities and.relationships, and )ob descriptions for key personnel posit"ons, or in equivalent forms of documentation.
These requirements shall be documented in the FSAR and wiLL be updated in accordance with 10 CFR 50.71{e).
b.
There shall be an individual executive position (corporate officer) in the offsite organization having corporate responsibility for averall plant nuclear safety.
This individual shall take any measures needed to ensure acceptable perforn~nce of the staff in operating, maintaining, and providing technical support in the plant eo that continued nuclear safety is assured.
c.
There shall be an individual management position in the ans" te organization having responsibility far overalL unit safe operation, and th's pasitian shall have control over those onsite resources necessary for safe operat'on and maintenance of the plant.
F d.
The individuals who train the operating staff and those who carry out health physics and quality assurance functions may report to
~ the appropriate onsite manager',
- however, they shall have
'ufficient organizationaL freedom to ensure their independence from operating pressures.
~
~
.I
~
~
~
l ~
~
I
!ll'l
'I l
r ~
4~~m /So~
. ~
r
~
~
~ I (I
"I
/
~
~ P
~
l ~ r rl I
I r Jg +rwLIto
'll 'P'e) III I, glIIrbhr~fkrt4errrIri'PI+IJ! Is,) l Ir s'r I@I r rk qg1
~II>> 'll t+ Ae
. PI r I.'r I '(LIrPaEf+P II I ~
~ I
,0 ~...
AUDITS PEP 1'm>7
~6.5.2.8'udi'ts of'unit activit'ies'hall be performed under the
'I cognizance of the NSRB.
These audits shall encompass:
a.
The conformance of plant operation to provisions contained within the Technical'pecifications and applicable license conditions at least once per 12 months.
b.
The performance, training and qualifications of the entire plant staff at least once per 12 months.
c.
The results of actions taken to correct deficiencies occurring, in site equipment, structures, systems or method of operation that affect nuclear safety at least once per 6
months.
d.
e.
The performance of activities required by the Operational Quality Assurance Program to meet the criteria of Appendix B,
10 CFR Part 50,. at. least once per 24 months.
~ j The Site Radiological Emergency Plan and implementing procedures at least once every 12 months.'he Plant Physical Security Plan and implementing procedures at least once every 12 months.
Any other area of site operation considered appropriate by the NSRB or the ower~
Nc naa~ vi'c ~im~~ rL Ac L ~ A.>c v~ C~~ap~
h.
The fire prot'ection programmatic controls including the implementing procedures at least once per 24 months.
6.,0-13 BFN Amendment No.
134
~, f
0'ECORDS SEP iL >@7 6.5."1.8 " The PORC shall'aintain 'wri'tten minutes of each PORC meeting including expedited meetings that, as a minimum, document the result of all. PORC activities'erformed under the responsibility
~ and authority provisions of these technical specifications.
Copies shall be provided to the Site Director and the Nuclear Safety Review Board..
6.5.2 NUCLEAR SAFETY REVIEW BOARD FUNCTION 6.5.2.l The NSRB shall function to provide independent review and audit cognizance of designated activities in the areas of:
a.
Nuclear power plant operations b.
Nuclear engineering c.
Chemistry and radiochemistry d.
Metallurgy eo Instrumentation and. control Radiological safety Mechanical and electrical engineering, and h.
Quality assurance practices COMPOSITION 6.5.2.2 The NSRB shall be composed of at least five members, including
+At.'D'~A<cY~
the Chairman.
Members of the NSRB may be from the OR~~f
~~Power or other TVA organizations, or external to TVA.
BFN Unit g (>ZQM>
6.0-10 Amendment No.
134
II m4r
SEP 111287.
QUALIFICATIONS 6.5.2.3 The Chairman, members,.alternate members. of the NSgB shall. be
~~ >~ice ~~~/Recce'<vceq &Lc~
- 'ppointed in writing by the r and shall have an academic degree in engineering or a physical science field, or the equivalent; and in addition, shall have a minimum of 5 years technical experience, in one or more areas given in 6.5.2.1.
No more than two alternates shall participate as voting members in NSRB activities at any one time.
CONSULTANTS 6.5.2.4 Consultants shall be utilized to provide expert advice as determined by the NSRB.
MEETING FREQUENCY 6.5.2.5 The NSRB shall meet at least once per six months.
QUORUM 6.5.2.6 The minimum quorum of the NSRB necessary for the performance of the NSRB review and audit functions of these technical
'pecifications shall consist of more than half,of, the NSRB membership or at least five members, whichever is greater.
The quorum shall include the Chairman*or his appointed alternate and the NSRB members including appointed alternate members meeting the requirements of 6.5.2.3.
No more than a minority of the quorum shall have line responsibility for operation of the unit.
('..
6.0-11 BFN gl ~
Unit g I>20~~~
Amendment No.
134
AUTHORITY /~
j44f4444f/l/~
~
on those areas of responsibility specified in Specifications 6.5.2.7 and 6.5.2.8.
RECORDS 6.5.2.10 Reports of activities shall be prepared,
- approved, and distributed as indicated below:
a.
Minutes of each NSRB meeting shall be prepared, approved and forwarded to the Mapage~f=Nuclear=:Pewep within 14 days WPF~~4i cc l,~~M~~
following each meeting.
b.
Reports of reviews encompassed by Section 6.5.2.7
- above,
'Sc CM L VrC+j,.~~~
shall be prepared, approved and forwarded to the Jhnage~f
/IMC;Lat2'<
6.'l&Q N~ar-Power within 14 days following completion of the review.
c.
Audit reports encompassed by Specification 6.5.2.8
- above, Vc~~Vi~Aa~'~. wuc~~Hav>C~ccccp shall be forwarded to the
~wer and to the management positions responsible for the areas audited within 30 days after completion of the audit.
g ~
BFN Unit//>2. a+a(. 2 Amendment No. 134
~'EP 111997
- 6. 0, SAFETY LIMIT VIOLATION"'.7.1 The following actions" shall" be taken in the event a Safety Limit is. violated:
a.
The"NRC Operations Center shall be notified by telephone as soon as possible and in all cases within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
The wV(cc.&c~M AJucka A~~And the NSRB shall be notified within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
b.
A, Safety Limit Violation Report shall be prepared.
The report shall be reviewed by the PORC.
This report shall describe (1) applicable circumstances preceding the violation, (2) effects of the violation upon facility components,
- systems, or structures, and (3) corrective action taken to prevent recurrence.
c.
The Safety Limit Violation Report shall be submitted to the Commission, the NSRB and the Manager of Nuclear Power within 14 days of the violation.
d.
Critical operation of the unit shall not be resumed until authorized by the Commission.
BFN Onit 2
S 'Z,u~<Z Amendment No.
134
~Q IRECTOR DIAL ION OF NOCL R QA DIRECTOR OF NUCLEAR ENGINEERING SITE DIRECTOR DIRECTOR DMSION OF NUCLEAR COtISTRUCllON DIRECtOR DMStON OF NUCLEAR SAFElY R UCENSIN SITE OA MANAGER PROJECT
~ENGINEER PLANT MANAGER SITE SERVICES MANAGER MODIFICATION MANAGE~R SITE SAFETY AND UCENSING LIAHAGER ASSISTANT PLANT MANAGER PORS INDUSTRIAL SAFETY UIIIT SUPERI tIINDENTS (S)
MAI tgTEtIAt ICE QUPEHINlENDENT RADIOLOGICAL CONTROL TKCIINICAL SERVICES SUPERItflKNDENT OPERATIONS SUPERVISORS
>(~)
UNIT LWIITEIIAtICE SUPERVISORS
(>)
CHEMISTRY NGINEERING St IIFT SHIFT CReus TECI-INIGAL ADVISOR
~
SIIIFT EtIGINEER (SRO)
ASSISTANT SI-IIFT ENOINEER (SRO)
UNIT OPERATOR (RO)
ASSISTAtIT UI'IIT OPERATOR AUXILIARYUNIT OPERATOR
+ RESPONSIBIUTY FOR FIRE PAOTECTION PR RAM SRO SENIOR REACTOR OPERATOR UCENSE RO REACTOR OPERATOR UCENSE nouns a.a-s
'AClLITY OHCANIZATION
~ M
.r',
~, ~
8OAII0 OF
~IIKOTAM CENETEAL MAIIAOCJI ISI C)
I CA
~.
'L killIAOER OF MglXblLP TOIlD1 OEPUIY MAIIAOCII IIUCLEAh SAFETY IIEVIEW SOABD DIRECTOR OF NUCLEAR TRAI NING DIRECTOR OF NUCLEAR SERVICES DIRECTOR OF IIUCLEAR ENOINEEBING DIRECTOR OF NUCLEAR QA DIRECTOR OF NUCLEAR CONS1BUCTION DlllECTOR OF CLEAR SAF ETY UCEHSINC IIUClEAJI Sflt DIIItOTOrlS 4 IIIICLCAR PIImtcv lIAIIAoms O
Figure 0.8 i Offslte Organization for Faciiity Management dc Technical Support
ENCLOSURE 2 DESCRIPTION AND JUSTIFICATION BROWNS FERRY NUCLEAR PLANT UNITS 1, 2, AND 3 Descri tion of Chan e
The Browns Ferry Nuclear Plant (BFN) Technical Specifications are being
'changed to delete the organizational charts from the administrative controls section in accordance with the direction of Generic Letter 88-06.
In
- addition, the title of the Manager of Nuclear Power is being changed to Senior Vice President, Nuclear Power Group.
Reason for Chan e
Generic Letter 88-06 which was issued March 22, 1988 provided guidance to licensees for removal of organizational charts from the technical specifications.
Only aspects of organizational charts which are important to safety and not covered by other specifications remain in the technical specifications.
General requirements that define these essential aspects of the organizational structure are substituted fox the organizational charts.
This change will allow TVA to implement changes to the offsite and/or onsite organizations without obtaining NRC approval through the issuance of a license amendment to update the organizational charts.
Justification for Chan e
The deletion of the organizational charts (figures 6.2-1 and 6.2-2) and the addition of general organizational requirements is an administrative change to the BFN Technical Specifications.
The NRC staff has determined that many of the details shown on the onsite and offsite organizational charts are not essential to the safe operation of the facility.
NRC has provided guidance in Generic Letter 88-06 on the aspects of the organizational charts which are important to safety and are not covered under other specifications.
These general requirements for organizational structure are being added to section 6.2.1,
" Offsite and Onsite Organizations."
This eliminates specific position titles from the requirements, thus eliminating the need for a license amendment to change a position title.
The organization charts and descriptions in the Final Safety Analysis Report (FSAR) are used to satisfy most of the general requirements.
The BFN FSAR is updated annually in accordance with 10 CFR 50.71(e).
Section 13.2, "Organization and Responsibility," contains the onsite and offsite position descriptions and the TVA organizational charts.to satisfy general requirement one.
Section 13.2.1.1, "Manager of Nuclear Power," satisfies requirement two.
Section 13.2.2.1, "Site Director," satisfies requirement three.
The technical specifications table 6.2.A, "Minimum Shift Crew Requirements,"
satisfies Generic Letter 88-06 requirement to designate positions that require senior reactor operator and reactor operator licenses.
ENCLOSURE 3
DETERMINATION OF NO SIGNIFICAHT HAZARDS CONSIDERATION BROWHS FERRY NUCLEAR PLANT UHITS 1, 2, AND 3 Descri tion o Amendment The proposed amendment would modify the Browns Ferry Nuclear Plant Technical Specifications, Section 6, in accordance with the guidance of Generic Letter 88-06, "Removal of Organizational Charts from Technical Specification Administrative Control Requirements."
Basis for Pro osed No Si nificant aza ds Consideration Determination NRC has provided standards for determining whether a significant hazards consideration exists as stated in 10 CFR 50.92(c).
A proposed amendment to an operating license involves no significant hazards considerations if operation of the facility in accordance with the proposed amendment would not (1) involve a significant increase in the probability or consequences of an accident previously evaluated, or (2) create the possibility of a new or different kind of accident from an accident previously evaluated, or (3) involve a significant reduction in a margin of safety.
1.
This proposed change is administrative in nature and intended to eliminate the need for NRC approval of a license amendment before implementing an organizational change.
The functions important to safety previously provided by the, organization charts specified in section 6 have been retained.
There are no hardware or procedure changes that could adversely affect the probability of occurrence or the consequences of any accident previously evaluated.
2.
This change does not create the possibility of a new or different kind of accident than that previously evaluated.
The change is administrative and follows the guidance contained in Generic Letter 88-06.
The amendment does not change the operation of the facility.
The functions important to safety will continue to be performed by those individuals who are technically competent to perform these functions.
3.
General organizational requirements will be maintained in the technical specifications.
Other aspects of the organization charts which are important to safety are covered by other specifications.
Thus the removal of the organizational charts from the technical specifications represents no reduction in safety requirements and no reduction in the safety margin.
Determination of Basis for Pro osed No S
nificant Hazards Since the application for amendment involves a proposed change that is encompassed by the criteria for which no significant hazards consideration
- exists, TVA has made a proposed determination that the application involves no significant hazards consideration.
Justification for Chan e (Cont'd)
The title change throughout section 6 from Manager of Nuclear Power to Senior Vice President, Nuclear Power Group is an administrative change.
This change makes the position title consistent with similar positions in similar large utilities.
In summary, the proposed changes to section 6 are administrative in nature; they implement the staff's policy as described in Generic Letter 88-06.
The proposed changes have no affect on nuclear safety.
BFN TECHNICAL SPECIFICATIONS 6 0 ADMINISTRATIVE CONTROLS 6.0 DM S
VE CO ROLS 6.1.1 The Plant Manager shall be responsible for overall unit operation and shall delegate in writing the succession to this responsibility during his absence.
6.1.2 The Shift Operations Supervisor (or during his absence from the Control Room, a designated individual) shall be responsible for the Control Room command function.
A management directive to this effect, signed by the Site Director shall be reissued to all station personnel on an annual basis.
6.2.1 Offsite and Onsite Or anizations An onsite and offsite organization shall be established for unit operation and corporate management.
The onsite and offsite organization shall include the positions for activities affecting the safety of the nuclear power plant.
- a. Lines of authority, responsibility, and communication shall be established and defined from the highest management levels through intermediate levels to and including all operating organization positions.
These relationships shall be documented and updated, as appropriate, in the form of organizational
- charts, functional descriptions of departmental responsibilities and relationships, and gob descriptions for key personnel positions, or in, equivalent forms of documentation.
These requirements shall be documented in the FSAR and will be updated in accordance with 10 CFR 50.71(e).
BFH Unit 1
6.2.1 (Cont'd)
- b. There shall be an individual executive position (corporate officer) in the offsite organization having corporate responsibility for overall plant nuclear safety.
This individual shall take any measures needed to ensure acceptable performance of the staff in operating, maintaining, and providing technical support in the plant so that continued nuclear safety is assured.
- c. There shall be an individual management position in the onsite organization having responsibility for overall unit safe operation, and this position shall have control over those onsite resources necessary for safe operation and maintenance of the plant.
- d. The individuals who train the operating staff and those who carry out health physics and quality assurance functions may report to the appropriate onsite manager;
- however, they shall have.
sufficient organizational freedom to ensure their independence from operating pressures.
6.2.2 Plant Staff
- a. Shift manning requirements, shall as a minimum, be as described in Table 6.2.A and below.
b.
A licensed senior reactor operator shall be present at the site at all times when there is fuel in the reactor.
- c. A licensed reactor operator shall be in the control room whenever there is fuel in the reactor.
BFN Unit 1 6.0-2
6.2.2 (Cont.)
d.
Two licensed reactor operators shall be in the control room during any cold startups, while shutting down the reactor, and during recovery from unit trip.
In addition, a person holding a senior operator license shall be in the control room for that unit whenever it is in an operational mode other than cold shutdown or refueling.
e.
A Health Physics Technician* shall be present at the facility at all times when there is fuel in the reactor.
f.
A person holding a senior operator license or a senior operator license limited to fuel handling, shall be present during
. alteration of the core to directly supervise the activity and during. this time shall not be assigned other duties.
g.
A site fire brigade of at least five members shall be maintained onsite at all times.*
The fire brigade shall not include the Shift Engineer and the other members of the minimum shift crew necessary for safe shutdown of the unit, nor any personnel required for other essential functions during a fire emergency.
- The Health Physics Technician and fire brigade composition may be less than the minimum requirements for a period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, in order to accommodate unexpected
- absence, provided immediate action is taken to fillthe required positions.
BFN Unit 1 6.0-3
Mini um Shi t C
ew Re u rements Position Units in 0 eratio e of License 0
2d 3
Senior Operatora Senior Operator 1
1 1
1 0
1 2
2 SRO SRO Licensed Operators 3
3 3
Additional Licensed Operators 0
1 2
2 Shift Technical Advisor (STA)
Health Physics Technician 0
1 1
1 1
1 1
1 Assistant Unit Operators (AUO) 4 4
5 5
RO or SRO RO or SRO None None None Note for able 2
a.
A senior operator will be assigned responsibility for overall plant operation at all times there is fuel in any unit.
b.
Except for the senior operator discussed in 'note "a", the shift crew composition may be one less than the minimum requirements of Table 6.2.A for a period of time not to exceed two hours in order to accommodate unexpected absence of on-duty shift crew members provided immediate action is taken to restore the shift crew composition to within the minimum requirements of Table 6.2.A.
This provision does not permit any shift crew position to be unmanned upon shift change due to an oncoming k
shift crewman being late or absent.
c.
One of the Additional Licensed Operators must be assigned to each control room with an operating unit.
d.
The number of required licensed personnel, when the operating units are controlled from a common control room, are two senior operators and four operators.
BFN Unit 1 6.0-4
6.3 PLANT STAFF UALIFICAT 0 S
Qualifications of the Browns Ferry Huclear Plant management and operating staff shall meet the minimum acceptable levels as described in AHSI-H18.1, Selection and Training of Nuclear Power Plant Personnel, dated March 8, 1971.
The qualifications of the Health Physics Supervisor will meet or exceed the minimum acceptable levels as described in Regulatory Guide 1.8, Revision 1, dated September 1975.
The Shift Technical Advisor shall have a bachelor's degree or equivalent in a scientific or engineering discipline with specific training in plant design and transient and accident response and analysis.
6.4 TERAI I G
A retraining and replacement training program for station personnel shall be in accordance with ANSI H18.1, Selection and Training of Nuclear Power Plant Personnel, dated March 8, 1971.
The minimum frequency of the retraining program shall be every two years.
6.5 PLANT REVIEW AHD AUDIT 6.5.1 PLANT OPERATIONS REVIEW COMMITTEE (PORC)
FUNCTION 6.5.1.1 a.
The PORC shall function to advise the Plant Manager in all matters related to nuclear safety.
b.
This advisory function shall be performed by the PORC acting in a formal meeting or by members acting individually without a formal meeting.
Unit 1 6.0-5
COMPOSITION 6.5.1.2 The PORC shall be composed of the:
a.
Chairman:
Plant Manager Alternate Chairman:
Assistant to Plant Manager Alternate Chairman or Member:
Technical Services Superintendent Member:
Unit Superintendents (3)
Member:
Maintenance Superintendent Member:
Quality Assurance Staff Supervisor Member:
Health Physics Supervisor b.
All alternate chairmen and alternate members shall be appointed in writing by the PORC chairman.
MEETING FREQUENCY 6.5.1.3 The PORC shall convene in a formal meeting at least once a
month and as directed by the chairman.
Other PORC meetings may be requested by the chairmen or members as required.
Unit 1 6.0-6
6.5.1.4 For expedited meetings, when it is not practical to convene as a
- group, the chairman or alternate chairman may conduct committee business by polling the members individually (by telephone or in person) or via a serialized review.
QUORUM 6.5.1.5 The quorum necessary for the PORC to act in a formal meeting shall consist of the chairman or alternate chairman and at least five members or their alternates.
Members shall be considered present if they are in telephone communication with the committee.
RESPOHSIBILITIES 6.5.1.6 The PORC shall be responsible for the activities listed below.
The PORC may delegate the performance of reviews, but will maintain cognizance over and responsibility for them, e.g.,
subcommittees.
a.
Review of administrative procedures for the control of the technical and cross-disciplinary review of (1) all procedures required by Specification 6.8.1.1, and changes
- thereto, (2) any other procedures and changes thereto determined by the Plant Manager to affect nuclear safety.
b.
Review of the administrative procedures required by Appendix A of Regulatory Guide 1.33, Revision 2, February 1978 and changes thereto.
c.
Review of emergency operating procedures and changes thereto.
d.
Review implementing procedures of the Radiological Emergency Plan and the Industrial Security Program.
BFN Unit 1 6.0-7
~
~
a~
e.
Review of all proposed changes to the Technical Specifications.
f.
Review of safety evaluation for proposed tests or experiments to be completed under the provisions of 10 CFR 50.59 g.
Review proposed changes to the Radiological Effluent Manual.
h.
Review adequacy of the Process Control Program and Offsite Dose Calculation Manual at least once every 24 months.
i.
Review changes to the radwaste treatment systems.
Review of every unplanned onsite release of radioactive material to, the environs incl'uding the preparation and forwarding of reports covering evaluation, recommendation, and disposition of the corrective action to prevent recurrence to the Director, Nuclear Power and to the Nuclear Safety Review Board.
k.
Review of all safety evaluations for modifications to structures, systems or components that affect nuclear safety to verify that such actions did not constitute an unreviewed safety question as defined in 10 CFR 50.59, or requires a
change to these Technical Specifications.
Unit 1 6.0-8
1.
Review of reportable
- events, unusual
- events, operating anomalies, and abnormal performance of plant equipment.
m.
Investigate reported or suspected incidents involving safety questions or violations of the Technical Specifications.
n.
Review of unit operations to detect potential hazards to nuclear safety.
Items that may be included in this review are NRC inspection reports, QA audit, NSRB audit results, American Nuclear Insurer (ANI) inspection results, and significant corrective action reports (CARs).
o.
Performance of special reviews, investigations, or analysis, and report thereon as requested by the Plant Manager or the Nuclear Safety Review Board.
Unit 1 6.0-9
AUTHORITY 6.5.1.7 The PORC shall:
a.
Recommend to the Plant'anager in writing, approval, or disapproval of items considered under 6.5.1.6.a through i above.
1.
The recommendation shall be based on a majority vote of the PORC at a formal meeting.
2.
The recommendation shall be based on a unanimous vote of the PORC when the PORC members are acting individually.
3.
Each member or alternate member shall have one vote.
b.
Furnish for consideration a determination in writing with regard to whether or not each item considered under 6.5.1.6.f above constitutes an unreviewed safety question.
c.
Make recommendations to the Plant Manager in writing that action reviewed under 6.5.1.6.k above did not constitute an unreviewed safety question.
d.
Provide written notification within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the Site Director and the Nuclear Safety Review Board of disagreements between the PORC and the Plant Manager.
However, the Plant Manager shall have responsibility for resolution of such disagreements pursuant to Specification 6.1.
Unit 1 6.0-10
RECORDS 6.5.1.8 The PORC shall maintain written minutes of each PORC meeting including expedited meetings that, as a minimum, document the result of all PORC activities performed under the responsibility and authority provisions of these technical specifications.
Copies shall be provided to the Site Director and the Nuclear Safety Review Board.
6.5.2 NUCLEAR SAFETY REVIEW BOARD (NSRB)
FUNCTION 6.5.2.1 The NSRB shall function to provide independent review and audit cognizance of designated activities in the areas of:
a.
Nuclear power plant operations b.
Nuclear engineering c.
Chemistry and radiochemistry d.
Metallurgy e.
Instrumentation and control f.
Radiological safety g.
Mechanical and electrical engineering, and h.
Quality assurance practices COMPOSITION 6.5.2.2 The NSRB shall be composed of at least five members, including the Chairman.
Members of the NSRB may be from the Nuclear Power Group or other TVA organizations, or external to TVA.
Unit 1 6.0-11
QUALIFICATIONS 6.5.2.3 The Chairman,
- members, alternate members of the NSRB shall be appointed in writing by the Senior Vice President, Huclear Power Group and shall have an academic degree in engineering or a physical science field, or the equivalent; and in addition, shall have a minimum of 5 years technical experience in one or more areas given in 6.5.2.1.
Ho more than two alternates shall participate as voting members in NSRB activities at, any one time.
COHSULTAHTS 6.5.2.4 Consultants shall be utilized to provide expert advice as determined by the HSRB.
MEETIHG FREQUENCY 6.5.2.5 The NSRB shall meet at least once per six months.
QUORUM 6.5.2.6 The minimum quorum of the NSRB necessary for the performance of the NSRB review and audit functions of these technical specifications shall consist of more than half of the NSRB membership or at least five members, whichever is greater.
The quorum shall include the Chairman or his appointed alternate and the HSRB members including appointed alternate members meeting the requirements of 6.5.2.3.
No more than a minority of the quorum shall have line responsibility for operation of the unit.
BFN Unit 1 6.0-12
~
~
4 REVIEW 6.5.2.7 The NSRB shall review:
a.
The safety evaluations for:
(1) changes to procedures, equipment or systems, and (2) tests or experiments completed under the provision of Section 50.59, 10 CFR, to verify that such actions did not constitute an unreviewed safety question.
b.
Proposed changes to procedures, equipment or systems which involve an unreviewed safety question as defined in Section 50.59, 10 CFR.
c.
Proposed tests or experiments which involve an unreviewed safety question as defined in Section 50.59, 10 CFR.
d.
Proposed changes to Technical Specifications or this Operating License.
e.
Violations of Codes, regulations,
- orders, Technical Specifications, license requirements, or of internal procedures or instructions having nuclear safety significance.
f.
Significant operating abnormalities or deviations from normal and expected performance of plant equipment that affect nuclear safety.
g.
All Reportable Events h.
All recognized indications of an unanticipated deficiency in some aspect of design or operation of structures,
- systems, or components that could affect nuclear safety; and i.
Reports and meeting minutes of the PORC.
BFN Unit 1 6.0-13
AUDITS 6.5.2.8 Audits of unit activities shall be performed under the cognizance of the NSRB.
These audits shall encompass:
a.
The conformance of plant operation to provisions contained within the Technical Specifications and applicable license conditions at least once per 12 months.
b.
The performance, training and qualifications of the entire plant staff at least once per 12 months.
c.
The results of actions taken to correct deficiencies occurring in site equipment, structures, systems or method of operation that affect nuclear safety at least once per 6
months.
d.
The performance of activities required by the Operational Quality Assurance Program to meet the criteria of Appendix B, 10 CFR Part 50, at least once per 24 months.
e.
The Site Radiological Emergency Plan and implementing procedures at least once every 12 months.
f.
The Plant Physical Security Plan and implementing procedures at least once every 12 months.
g.
Any other area of site operation considered appropriate by the NSRB or the Senior Vice President, Nuclear Power Group.
h.
The fire protection programmatic controls including the implementing procedures at least once per 24 months.
BFN Unit 1 6.0-14
i.
An independent fire protection and loss prevention program inspection and audit shall be performed annually utilizing either qualified offsite license personnel or an outside fire protection firm.
j.
An inspection and audit of the fire protection and loss prevention program shall be performed by an outside qualified fire consultant at intervals no greater than 3
years.
k.
The Radiological Environmental Monitoring program and the results thereof at least once per 12 months.
1.
The performance of activities required by the Quality Assurance Program to meet the criteria of Regulatory Guide 4.15, December 1977, or Regulatory Guide 1.21, Rev. 1, 1974, and Regulatory Guide 4.1, 1975, at least once every 12 months.
m.
The performance of activities required by the Safeguards Contingency Plan to meet the criteria of 10 CFR 73.40(d) at least once every 12 months.
n.
The Offsite Dose Calculation Manual and implementing procedures at least once per 24 months.
o.
The Process Control Program and implementing procedures for solidification of wet radioactive wastes at least once per 24 months.
p.
The Radiological Effluent Manual and implementing procedures at least once per 12 months.
Unit 1 6.0-15
AUTHORITY 6.5.2.9 The NSRB shall report to and advise the Senior Vice President, Nuclear Power Group on those areas of responsibility specified in Specifications 6.5.2.7 and 6.5.2.8.
RECORDS 6.5.2.10 Reports of activities shall be prepared,
- approved, and distributed as indicated below:
a.
Minutes of each NSRB meeting shall be prepared, approved and forwarded to the Senior Vice President, Nuclear Power Group within 14 days following each meeting.
b.
Reports of reviews encompassed by Section 6.5.2.7
- above, shall be prepared, approved and forwarded to the Senior Vice President, Nuclear Power Group within 14 days following completion of the review.
c.
Audit reports encompassed by Specification 6.5.2.8
- above, shall be forwarded to the Senior Vice President, Nuclear Power Group and to the management positions responsible for the areas audited within 30 days after completion of the audit.
Unit 1 6.0-16
6.5.3 TECHHICAL REVIEW AHD APPROVAL OF PROCEDURES ACTIVITIES 6.5.3.1 Procedures required by'Technical Specification 6.8.1.1 and other procedures which affect plant nuclear safety, and changes (other than editorial or typographical changes) thereto, shall be prepared, reviewed and approved.
Each procedure or procedure change shall be reviewed by an individual other than the preparer.
The reviewer may be from the same organization or from a different organization.
Procedures other than Site Director Standard Practices will be approved by the responsible Section Supervisor, or applicable Plant Superintendent.
6.5.3.2 Proposed changes or modifications to plant nuclear safety-related structures, systems and components shall be reviewed as designated by the Plant Manager.
Each such modification shall be reviewed by an individual/group other than the individual/group which designed the modification, but who may be from the same organization as the individual/group which designed the modification.
Proposed modifications to plant nuclear safety-related structures, systems and components shall be approved by the Plant Manager, prior to implementation.
Unit 1 6.0-17
6.5.3.3 Individuals responsible for reviews performed in accordance with 6.5.3.1 shall be members of the site supervisory staff previously designated by the Plant Manager.
Each such review shall include a determination of whether or not additional, cross-disciplinary, review is necessary.
If deemed necessary, such review shall be performed by review personnel of the appropriate discipline.
6.5.3.4 The Plant Manager shall approve all administrative procedures requiring PORC review prior to implementation.
6.6 REPORTABLE EVENT AC IO 6.6.1 The following actions shall be. taken for REPORTABLE EVENTS:
a.
The Commission shall be notified and a report submitted pursuant to the requirements of Section 50.73 to 10 CFR Part 50'nd b.
Each REPORTABLE EVENT shall be reviewed by the PORC and the results of this review shall be submitted to the NSRB and the Site Director.
BFN Unit 1 6.0-18
6.7 SAFETY LIM T VIOLAT 0 6.7.1 The following actions shall be taken in the event a Safety Limit is violated:
a.
The NRC Operations Center shall be notified by telephone as soon as possible and in all cases within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
The Senior Vice President, Nuclear Power Group and the NSRB shall be notified within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
b.
A Safety Limit Violation Report shall be prepared.
The report shall be reviewed by the PORC.
This report shall describe (1) applicable circumstances preceding the violation, (2) effects of the violation upon facility components,
- systems, or structures, and (3) corrective action taken to prevent recurrence.
c.
The Safety Limit Violation Report shall be submitted to the Commission, the NSRB and the Manager of Nuclear Power within 14 days of the violation.
d.
Critical operation of the unit shall not be resumed until authorized by the Commission.
Unit 1 6.0-19
6.8 PROCEDURES STRUCTXONS AND PROGRAMS 6.8.1 PROCEDURES 6.8.1.1 Written procedures shall be established, implemented and maintained covering the activities referenced below:
a.
The applicable procedures recommended in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978.
b.
Limitations on the amount of overtime worked by individuals performing safety-related functions in accordance with NRC Policy statement on working hours (Generic Letter No. 82-12).
c.
Surveillance and test activities of safety-related equipment.
d.
Security plan implementation.
e.
Emergency plan implementation.
f.
Fire Protection Program implementation.
g.
Radiological Effluent Manual implementing procedures.
h.
Process Control Program (PCP).
i.
Offsite Dose Calculation Manual.
Administrative procedures which control technical and cross-disciplinary review.
6.8.1.2 Each administrative procedure required by Section 6.8.l.l.a. shall be reviewed by PORC and all other procedures required by Section 6.8.1.l.a. shall be reviewed in accordance with Section 6.5.3.
BFH Unit 1 6.0-20
6.8.1.3 Temporary changes to procedures of Specification 6.8.1.1 may be made provided:
a.
The intent of the original procedure is not altered; b.
The change is approved by two members of the plant management staff, at least one of whom holds a Senior Operator License on the unit affected; c.
The change is documented, reviewed by the PORC and approved by 'the Plant Manager within 14 days of implementation, for changes in administrative procedures requiring PORC review.
d.
The change is documented, reviewed per Specification 6.5.3, and approved by the responsible group section supervisor within 14 days of implementation, for changes to procedures other than administrative procedures.
DRILLS 6.8.2 Drills on actions to be taken under emergency conditions involving release of radioactivity are specified in the Radiological Emergency Plan and shall be conducted annually.
Annual drills shall also be conducted on the actions to be taken following failures of safety-related systems or components.
RADIATION CONTROL PROCEDURES 6.8.3 Radiation Control Procedures shall be maintained and made available to all station personnel.
These procedures shall show permissible radiation exposure and shall be consistent BFN Unit 1 6.0-21
4 with the requirements of 10 CFR 20.
This radiation protection program shall be organized to meet the requirements of 10 CFR 20 except in lieu of the "control device" or "alarm signal" required by paragraph 20.203 (c) of 10 CFR 20.
6.8.3.1 Each high radiation area in which the intensity of radiation is greater than 100 mrem/hr but less than or equal to 1000 mrem/hr shall be barricaded and conspicuously posted as a high radiation area and entrance thereto shall be controlled by requiring issuance of a Radiological Work Permit.*
Any individual or group of individuals permitted to enter such areas shall be provided with or accompanied by one or more of the following:
a.
A radiation monitoring device which continuously indicates the radiation dose rate in the area.
b.
A radiation monitoring device which continuously integrates the radiation dose rate in the area and alarms when a preset integrated dose is received.
Entry monitoring device may be male after into such areas with this the dose rate level in the area has been established and personnel have been made knowledgeable of them.
I c.
An individual qualified in radiation protection procedures who is equipped with a radiation dose rate monitoring device.
This individual shall be responsible for providing positive control over the activities within the area and shall perform periodic radiation surveillance at the frequency specified by the facility Health Physicist in the Radiological Work Permit.
6.8.3.2 Each high radiation area in which the intensity of radiation is greater than 1,000 mrem/hr shall be subject to the provisions of (1) above; and, in addition, access to the source and/or area BFN Unit 1 4.0-22
shall be secured by lock(s).
The key(s) shall be under the administrative control of the shift engineer.
In the case of a high radiation area established for a period of 30 days or less, direct surveillance to prevent unauthorized entry may be substituted for permanent access control.
- Health Physics personnel, or personnel escorted by Health Physics personnel, in accordance with approved emergency procedures, shall be exempt from the RWP issuance requirement during the performance of their assigned radiation protection
- duties, provided they comply with approved radiation protection procedures for entry into high radiation areas.
QUALITY ASSURANCE PROCEDURES EFFLUENT AND ENVXRONMENTAL MONITORING 6.8.4 Quality Assurance procedures shall be established, implemented, and maintained for effluent and environmental monitoring, using the guidance in Regulatory Guide 1.21, Rev. 1, June 1974 and Regulatory Guide 4.1, Rev. 1, April 1975 or Regulatory Guide 4.15, Dec.
1977.
Unit 1 6.0-23
0
6.9 REPORTING RE UIREMENTS ROUTINE REPORTS 6.9.1 In addition to the applicable reporting requirements of Title 10, Code of Federal Regulations, the following identified reports shall be submitted, to the Director of the Regional Office of NRC, unless otherwise noted.
- 6. 9.1. 1 STARTUP REPORT a.
A summary report of plant startup and power escalation testing shall be submitted following (1) receipt of an operating license, (2) amendment to the license involving a planned increase in power level, (3) installation of fuel that has a different design or has been manufactured by a different fuel supplier, and (4) modifications that may have significantly altered the nuclear, thermal, or hydraulic performance of the plant.
The report shall address each of the tests identified in the FSAR and shall include a
description. of the measured values of the operating conditions or characteristics obtained during the test program and a comparison of these values with design predictions and specifications.
Any corrective actions that were required to obtain satisfactory operation shall also be described.
Any additional specific details required in license conditions based on other commitments shall be included in this report.
BFN Unit 1 6.0-24
~'
b.
Startup reports shall be submitted within (1) 90 days following completion of the startup test program, (2) 90 days following resumption or commencement of commercial power operation, or (3) 9 months following initial criticality, whichever is earliest.
If the Startup Report does not cover all three events'i.e., initial criticality, completion of startup test program, and resumption or commencement of commercial power operation),
supplementary reports shall be submitted at least every three months until all three events have been completed.
6.9.1.2 ANNUAL OPERATING REPORT*
a.
A.tabulation on an annual basis of the number of station, utility and other personnel (including contractors) receiving exposures greater than 100 mrem/yr and their associated man rem exposure according to work and job functions, **e.g., reactor operations and surveillance, inservice inspection, routine maintenance, special maintenance (describe maintenance),
waste processing, and refueling.
The dose assignment to various duty functions may be estimates based on pocket dosimeter, TLD, or film badge measurements.
Small exposures totaling less than 20%
of the individual total dose need not be accounted for.
In the aggregate, at least 80A of the total whole body dose received from external sources shall be assigned to specific major work functions.
b.
Any mainsteam relief valve that opens in response to reaching its setpoint or due to operator action to control reactor pressure shall be reported.
- A single submittal may be made for a multiple unit station.
- This tabulation supplements the requirements of 20.407 of 10 CFR Part 20.
BFN Unit 1 6.0-25
6.9.1.3 MONTHLY OPERATING REPORT Routine reports of operating statistics and shutdown experience shall be submitted on a monthly basis to the Office of.
Inspection and Enforcement; U.S. Huclear Regulatory Commission, Washington, D.C. 20555, with a copy to the Regional Office, to be submitted no later than the fifteenth of each month following the calendar month covered by the report.
A narrative summary of operating experience shall be submitted in the above schedule.
6.9.1.4 REPORTABLE EVENTS Reportable
- events, including corrective actions and measures to prevent re-occurrence, shall be reported to the HRC in accordance with Section 50.73 to 10 CFR 50.
6.9.1.5 RADIOACTIVE EFFLUENT RELEASE REPORT Deleted (See REM section F-2) 6.9.1.6 SOURCE TESTS Results of required leak tests performed on sources if the tests reveal the presence of 0.005 microcurie or more of removable contamination.
Unit 1
~ 6.0-26
6.9.2 SPECIAL REPORTS Reports on the following areas shall be submitted in writing to the Director of Regional Office of Inspection and Enforcement:
1.
Fatigue Usage 6.10.1.q Annual Operating Report 2.
Relief Valve Tailpipe 3.2.F Within 30 days after inoper-ability of thermocouple and acoustic monitor on one valve.
3.
Seismic Instrumentation Inoperability 3.2.J.3 Within 10 days after 30 days of inoperability.
4.
Meteorological Monitoring 3.2.I.2 Instrumentation Inoperability Within 10 days after 7 days of inoperability.
5.
Primary Containment Integrated Leak Rate Testing 4.7.A.2 Within 90 days of completion of each test.
6.
Data shall be retrieved from all seismic instruments actuated during a seismic event and analyzed to determine the magnitude of the vibratory ground motion.
A Special BFN Unit 1 6.0-27
Report shall be submitted within 10 days after the event describing the magnitude, frequency spectrum, and resultant effect upon plant features important to safety.
7.
Secondary Containment Leak Rate Testing*
4.7.C.
Mithin 90 days of completion of each test.
- Each integrated leak rate test of the secondary containment shall be the subject of a summary techni.cal report.
This report should include data on the wind speed, wind direction, outside and inside temperatures during the test, concurrent reactor building pressure, and emergency ventilation flow rate.
The report shall also include analyses and interpretations of those data which demonstrate compliance with the specified leak rate limits.
Unit 1 6.0-28
P
~ '
6.10 STATIO OPERATING RECORDS AND RETENTIO 6.10.1 Records and/or logs shall be kept in a manner convenient for review as indicated below:
a.
All normal plant operation including such items as power level, fuel exposure, and shutdowns b.
Principal maintenance activities c.
Reportable Events d.
- Checks, inspections,
- tests, and calibrations of components and systems, including such diverse items as source leakage e.
Reviews of changes made to the procedures or equipment or reviews of tests and experiments to comply with 10 CFR 50.59 f.
Radioactive shipments g.
Test results in units of microcuries for leak tests performed pursuant to Specification 3.8.D BFN Unit 1 6.0-29
h.
Record of annual physical inventory verifying accountability of sources on record i.
Gaseous and liquid radioactive waste released to the environs Offsite environmental monitoring surveys k.
Fuel inventories and transfers 1.
Plant radiation and contamination surveys m.
Radiation exposures for all plant personnel n.
- Updated, corrected, and as-built drawings of the plant o.
Reactor coolant system inservice inspection p.
Minutes of meetings of the NSRB q.
Design fatigue usage evaluation Monitoring and recording requirements below will be met for various portions of the reactor coolant pressure boundary (RCPB) for which detailed fatigue usage evaluation per the ASME Boiler and Pressure Vessel Code"Section III was performed for the conditions defined in the design specification.
In this plant, the applicable codes require fatigue usage evaluation for the reactor pressure vessel only.
The locations to be monitored shall be:
1.
The feedwater nozzles 2.
The shell at or near the waterline 3.
The flange studs Unit 1 6.0-30
~1<
~
~
Transients that occur during plant operations will be reviewed and a cumulative fatigue usage factor determined.
For transients which are more severe than the transients evaluated in the stress
- report, code fatigue usage calculations will be made and tabulated separately.
In the annual operating report, the fatigue usage factor determined for the transients defined above shall be added and a cumulative fatigue-usage factor to date shall be reported.
When the cumulative usage factor reaches a value of 1.0, an inservice inspection shall be included for the specific location at the next scheduled inspection (3-1/3-year interval) period and 3-1/3-year intervals thereafter, and a subsequent evaluation performed in accordance with the rules of ASME Section XI Code if any flaw indications are detected.
The results of the evaluation shall be submitted in a Special Report for review by the Commission.
6.10.2 Except where covered by applicable regulations, items a through h above shall be retained for a period of at least 5 years and item i through q shall be retained for the life of the plant.
A complete inventory of radioactive materials in possession shall be maintained current at all times.
1.
See paragraph N-415.2, ASME Section III, 1965 Edition.
Unit 1 6.0-31
6.11 PROCESS CONTROL PROGRAM C
- 1. The PCP shall be approved by the Commission prior to implementation.
2.
Changes to the PCP shall be submitted to the Commission in the semi-annual Radioactive Effluent Release Report for the period in which the change(s) was made.
This submittal shall contain:
a.
Sufficiently detailed information to totally support the change.
b.
A determination that the change did not change the overall conformance of the solidified product to existing criteria.
6.12 OFFSITE DOSE CALCULATIONALMANUAL ODCM
- 1. The ODCM shall be approved by the Commission prior to implementation.
2.
Changes to the ODCM shall be submitted to the Commission in the semi-annual Radioactive Effluent Release Report for the period in which the change(s) was made.
This submittal shall contain:
a.
Sufficiently detailed information to totally support the change.
3.
Changes to the ODCM shall become effective upon review and acceptance by PORC.
Unit 1
- 6. 0-32
~
~
- 6. 13 RADIOLOGICAL FFLUENT MANUAL REM
- 1. The REM shall be approved by the Commission prior to implementation.
2.
Changes to the REM shall be reviewed by PORC prior to implementation.
3.
Changes to the REM shall be approved by the Commission prior to implementation.
Unit 1 6.0-33
II 4
0 BFN TECHNICAL SPECIFICATIONS 6.0 ADMINISTRATIVE CONTROLS 6.0 ADMINISTRAT VE CO ROLS 6.1.1 The Plane Manager shall be responsible for overall unit operation and shall delegate in writing the succession to this responsibility during his absence.
6.1.2 The Shift Operations Supervisor (or during his absence from the Control Room, a designated individual) shall be responsible for the Control Room command function.
A management directive to this effect, signed by the Site Director shall be reissued to all station personnel on an annual basis.
6.2.1 Of s te and Onsite Or anizations An onsite and offsite organization shall be established for unit operation and corporate management.
The onsite and offsite organization shall include the positions for activities affecting the safety of the nuclear power plant.
- a. Lines of authority, responsibility, and communication shall be established and defined from the highest management levels through intermediate levels to and including all operating organization positions.
These relationships shall be documented and updated, as appropriate, in the form of organizational
- charts, functional descriptions of departmental responsibilities and relationships, and job descriptions for key personnel positions, or in equivalent forms of documentation.
These requirements shall be documented in the FSAR and will be updated in accordance with 10 CFR 50.71(e).
BFN Unit 2
6.2.1 (Cont'd)
- b. There shall be an individual executive position (corporate officer) in the offsite organization having corporate responsibility for overal'1 plant nuclear safety.
This individual shall take any measures needed to ensure acceptable performance of the staff in operating, maintaining, and providing technical support in the plant so that continued nuclear safety is assured.
- c. There shall be an individual management position in the onsite organization having responsibility for overall unit safe operation, and this position shall have control over those onsite resources necessary for safe operation and maintenance of the plant.
- d. The individuals who train the operating staff and those who carry out health physics and quality assurance functions may report to the appropriate onsite manager;
- however, they shall have sufficient organizational freedom to ensure their independence from operating pressures.
6.2.2 Plant Staff
- a. Shift manning requirements, shall as a minimum, be as described in Table 6.2.A and below.
b.
A licensed senior reactor operator shall be present at the site at all times when there is fuel in the reactor.
c.
A licensed reactor operator shall be in the control room whenever there is fuel in the reactor.
BFH Unit 2 6.0-2
6.2.2 (Cont.)
d.
Two licensed reactor operators shall be in the control room during any cold startups, while shutting down the reactor, and during recovery from unit trip.
In addition, a person holding a senior operator license shall be in the control room for that unit whenever it is in an operational mode other than cold shutdown or refueling.
e.
A Health Physics Technician+ shall be present at the facility a~
all times when there is fuel in the reactor.
f.
A person holding a senior operator license or a senior operator license limited to fuel handling, shall be present during alteration of the core to directly supervise the activity and during this time shall not be assigned other duties.
g.
A site fire brigade of at least five members shall be maintained onsite at all times.*
The fire brigade shall not include the Shift Engineer and the other members of the minimum shift crew necessary for safe shutdown of the unit, nor any personnel required for other essential functions during a fire emergency.
- The Health Physics Technician and fire brigade composition may be less than the minimum requirements for a period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, in order to accommodate unexpected
- absence, provided immediate action is taken to fillthe required positions.
Unit 2 6.0-3
~
~
r nim Sh ft Crew Re uirementsb
~Pos tio Units 0 eratio e of License Senior Operator Senior Operator Licensed Operators Additional Licensed Operatorsc Assistant Unit Operators (AUO)
Health Physics Technician 2
1 1
1 1.
0 1
2 2
3 3
3 3
0 1
2 2
4 4
5 5
0 1
1 1
1 1
1 1
SRO SRO RO or SRO RO or SRO Hone None Hone Note for Tab e
2 a.
.A senior operator will be assigned responsibility for overall plant operation at all times there is fuel in any. unit.
b.
. Except for the senior operator discussed in note "a", the shift crew composition may be one less than the minimum requirements of Table 6.2.A for a period of time not to exceed two hours in order to accommodate unexpected absence of on-duty shift crew members provided immediate action is taken to restore the shift crew composition to within the minimum requirements of Table 6.2.A.
This provision does not permit any shift crew position to be unmanned upon shift change due to an oncoming shift crewman being late or absent.
c.
One of the Additional Licensed Operators must be assigned to each control room with an operating unit.
d.
The number of required licensed personnel, when the operating units are controlled from a common control room, are two senior operators and four operators.
Unit 2 6.0-4
6.3 LA S AFF UA IFIC TIO S
Qualifications of the Browns Ferry Nuclear Plant management and operating staff shall meet the minimum acceptable levels as described in ANSI-H18.1, Selection and Training of Huclear Power Plant Personnel, dated March 8, 1971.
The qualifications of the Health Physics Supervisor will meet or exceed the minimum acceptable levels as described in Regulatory Guide 1.8, Revision 1, dated September 1975.
The Shift Technical Advisor shall have a bachelor's degree or equivalent in a scientific or engineering discipline with specific training in plant design and transient and accident response and analysis.
6.4
~TRAIHI G A retraining and replacement training program for station personnel shall be in accordance with AHSI H18.1, Selection and Training of Nuclear Power Plant Personnel, dated March 8, 1971.
The minimum frequency of the retraining program shall be every two years.
6.5 PLA REVIEW A AUDIT 6.5.1 PLANT OPERATIONS REVIEW COMMITTEE (PORC)
FUHCTION 6.5.1.1 a.
The PORC shall function to advise the Plant Manager in all matters related to nuclear safety.
b.
This advisory function shall be performed by the PORC acting in a formal meeting or by members acting individually without a formal meeting.
BFN Unit 2 6.0-5
COMPOSITION 6.5.1.2 The PORC shall be composed of the:
a.
Chairman:
Plant Manager Alternate Chairman:
Assistant to Plant Manager Alternate Chairman or Member:
Technical Services Superintendent Member:
Unit Superintendents (3)
Member:
Maintenance Superintendent Member:
Quality Assurance Staff Supervisor Member:
Health Physics Supervisor b.
All alternate chairmen and alternate members shall be appointed. in writing by the PORC chairman.
MEETING FREQUENCY 6.5.1.3 The PORC shall convene in a formal meeting at least once a
month and as directed by the chairman.
Other PORC meetings may be requested by the chairmen or members as required.
Unit 2 6.0-6
6.5.1.4 For expedited meetings, when it is not practical to convene as a
group, the chairman or alternate chairman may conduct committee business by polling the members individually (by telephone or in person) or via a serialized review.
QUORUM 6.5.1.5 The quorum necessary for the PORC to act in a formal meeting shall consist of the chairman or alternate chairman and at least five members or their alternates.
Members shall be considered present if they are in telephone communication with the committee.
RESPOHSIBILITIES 6.5.1.6 The PORC shall be responsible for the activities listed below.
The PORC may delegate the performance of reviews, but will maintain cognizance over and responsibility for them, e.g.,
subcommittees.
a.
Review of administrative procedures for the control of the technical and cross-disciplinary review of (1) all procedures required by Specification 6.8.1.1, and changes
- thereto, (2) any other procedures and changes thereto determined by the Plant Manager to affect nuclear safety.
b.
Review of the administrative procedures required by Appendix A of Regulatory Guide 1.33, Revision 2, February 1978 and changes thereto.
c.
Review of emergency operating procedures and changes thereto.
d.
Review implementing procedures of the Radiological Emergency Plan and the Industrial Security Program.
BFN Unit 2 6.0-7
e.
Review of all proposed changes to the Technical Specifications.
f.
Review of safety evaluation for proposed tests or experiments to be completed under the provisions of 10 CFR 50.59 g.
Review proposed changes to the Radiological Effluent Manual.
h.
Review adequacy of the Process Control Program and Offsite Dose Calculation Manual at least once every 24 months.
i.
Review changes to the radwaste treatment systems.
Review of every unplanned onsite release of radioactive material to the environs including the preparation and forwarding of reports covering evaluation, recommendation, and disposition of the corrective action to prevent recurrence to the Director, Nuclear Power and to the Nuclear Safety Review Board.
k.
Review of all safety evaluations for modifications to structures, systems or components that affect nuclear safety to verify that such actions did not constitute an unreviewed safety question as defined in 10 CFR 50.59, or requires a
change to these Technical Specifications.
Unit 2 6.0-8
1.
Review of reportable
- events, unusual events, operating anomalies, and abnormal performance of plant equipment.
m.
Investigate reported or suspected incidents involving safety questions or violations of the Technical Specifications.
n.
Review of unit operations to detect potential hazards to nuclear safety.
Items that may be included in this review are NRC inspection reports, QA audit, NSRB audit results, American Nuclear Insurer (ANI) inspection results, and significant corrective action reports (CARs).
o.
Performance of special reviews, investigations, or analysis, and report thereon as requested by the Plant Manager or the Nuclear Safety Review Board.
BFN Unit 2 6.0-9
AUTHORITY 6.5.1.7 The PORC shall:
a.
Recommend to the Plant Manager in writing, approval, or disapproval of items considered under 6.5.1.6.a through i above.
1.
The recommendation shall be based on a majority vote of the PORC at a formal meeting.
2.
The recommendation shall be based on a unanimous vote of the PORC when the PORC members are acting individually.
3.
Each member or alternate member shall have one vote.
b.
Furnish for consideration a determination in writing with regard to whether or not each item considered under 6.5.1.6.f above constitutes an unreviewed safety question.
c.
Make recommendations to the Plant Manager in writing that action reviewed under 6.5.1.6.k above did not constitute an unreviewed safety question.
d.
Provide written notification within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the Site Director and the Nuclear Safety Review Board of disagreements between the PORC and the Plant Manager.
- However, the Plant Manager shall have responsibility for resolution of such disagreements pursuant to Specification 6.1.
BFN Unit 2 6.0-10
RECORDS 6.5.1.8 The PORC shall maintain written minutes of each PORC meeting including expedited meetings that, as a minimum, document the result of all PORC activities performed under the responsibility and authority provisions of these technical specifications.
Copies shall be provided to the Site Director and the Nuclear Safety Review Board.
6.5.2 HUCLEAR SAFETY REVIEW BOARD (HSRB)
FUHCTIOH 6.5.2.1 The HSRB shall function to provide independent review and audit cognizance of designated activities in the areas of:
a.
Huclear power plant operations b.
Nuclear engineering c.
Chemistry and radiochemistry d.
Metallurgy e.
Instrumentation and control f.
Radiological safety g.
Mechanical and electrical engineering, and h.
Quality assurance practices COMPOSITION 6.5.2.2 The NSRB shall be composed of at least five members, including the Chairman.
Members of the NSRB may be from the Nuclear Power Group or other TVA organizations, or external to TVA.
Unit 2 6.0-11
QUALIFICATIONS 6.5.2.3 The Chairman,
- members, alternate members of the HSRB shall be appointed in writing by the Senior Vice President, Nuclear Power Group and shall have an academic degree in engineering or a physical science field, or the equivalent; and in addition, shall have a minimum of 5 years technical experience in one or more areas given in 6.5.2.1.
Ho more than two alternates shall participate as voting members in NSRB activities at any one time.
CONSULTANTS 6.5.2.4 Consultants shall be utilized to provide expert advice as determined by the HSRB.
MEETIHG FREQUENCY 6.5.2.5 The HSRB shall meet at least once per six months.
QUORUM 6.5.2.6 The minimum quorum of the HSRB necessary for the performance of the NSRB review and audit functions of these technical specifications shall consist of more than half of the NSRB membership or at least five members, whichever is greater.
The quorum shall include the Chairman or his appointed alternate and the NSRB members including appointed alternate members meeting the requirements of 6.5.2.3.
No more than a minority of the quorum shall have line responsibility for operation of the unit.
Unit 2 6.0-12
A r
REVIEW 6.5.2.7 The NSRB shall review:
a.
The safety evaluations for:
(1} changes to procedures, equipment or systems, and (2) tests or experiments completed under the provision of Section 50.59, 10 CFR, to verify that such actions did not constitute an unreviewed safety question.
b.
Proposed changes to procedures, equipment or systems which involve an unreviewed safety question as defined in Section 50.59, 10 CFR.
c.
Proposed tests or experiments which involve an unreviewed safety question as defined in Section 50.59, 10 CFR.
d.
Proposed changes to Technical Specifications or this Operating License.
e.
Violations of Codes, regulations,
- orders, Technical Specifications, license requirements, or of internal procedures or instructions having nuclear safety significance.
f.
Significant, operating abnormalities or deviations from normal and expected performance of plant equipment that affect nuclear safety.
g.
All Reportable Events h.
All recognized indications of an unanticipated deficiency in some aspect of design or operation of structures,
- systems, or components that could affect nuclear safety; and i.
Reports and meeting minutes of the PORC.
Unit 2 6.0-13
4
~
c'
~
AUDITS 6.5.2.8 Audits of unit activities shall be performed under the cognizance of the NSRB.
These audits shall encompass:
a.
The conformance of plant operation to provisions contained within the Technical Specifications and applicable license conditions at least once per 12 months.
b.
The performance, training and qualifications of the entire plant staff at least once per 12 months.
c.
The results of actions taken to correct deficiencies occurring in site equipment, structures, systems or method of operation that affect nuclear safety at least once per 6
months.
d.
The performance of activities required by the Operational Quality Assurance Program to meet the criteria of Appendix B,
10 CFR Part 50, at least once per 24 months.
e.
The Site Radiological Emergency Plan and implementing procedures at least once every 12 months.
f.
The Plant Physical Security Plan and implementing procedures at least once every 12 months.
g.
Any other area of site operation considered appropriate by the NSRB or the Senior Vice President, Nuclear Power Group.
h.
The fire protection programmatic controls including the implementing 'procedures at least once per 24 months.
BFN Unit 2 6.0-14
i.
An independent fire protection and loss prevention program inspection and audit shall be performed annually utilizing either qualified offsite license personnel or an outside fire protection firm.
An inspection and audit of the fire protection and loss prevention program shall be performed by an outside qualified fire consultant at intervals no greater than 3
years.
k.
The Radiological Environmental Monitoring program and the results thereof at least once per 12 months.
1.
The performance of activities required by the Quality Assurance Program to meet the criteria of Regulatory Guide 4.15, December 1977, or Regulatory Guide 1.21, Rev. 1, 1974, and Regulatory Guide 4.1, 1975, at least once every 12 months.
m.
The performance of activities required by the Safeguards Contingency Plan to meet the criteria of 10 CFR 73.40(d) at least once every 12 months.
n.
The Offsite Dose Calculation Manual and implementing procedures at least once per 24 months.
o.
The Process Control Program and implementing procedures for solidification of wet radioactive wastes at least once per 24 months.
p.
The Radiological Effluent Manual and implementing procedures at least once per 12 months.
Unit 2 6.0-15
AUTHORITY 6.5.2.9 The NSRB shall report to and advise the Senior Vice President, Nuclear Power Group on those areas of responsibility specified in Specifications 6.5.2.7 and 6.5.2.8.
RECORDS 6.5.2.10 Reports of activities shall be prepared,,
- approved, and distributed as indicated below:
a.
Minutes of each NSRB meeting shall be prepared, approved and forwarded to the Senior Vice President, Nuclear Power Group within 14 days following each meeting.
b.
Reports of reviews encompassed by Section 6.5.2.7 above,'hall be prepared, approved and forwarded to the Senior Vice President, Nuclear Power Group within 14 days following completion of the review.
c.
Audit reports encompassed by Specification 6.5.2.8
- above, shall be forwarded to the Senior Vice President, Nuclear Power Group and to the management positions responsible for the areas audited within 30 days after completion of the audit.
Unit 2 6.0-16
6.5.3 TECHNICAL REVIEW AND APPROVAL OF PROCEDURES ACTIVITIES 6.5.3.1 Procedures required by Technical Specification 6.8.1.1 and other procedures which affect plant nuclear safety, and changes (other than editorial or typographical changes) thereto, shall be prepared, reviewed and approved.
Each procedure or procedure change shall be reviewed by an individual other than the preparer.
The reviewer may be from the same organization or from a different organization.
Procedures other than Site Director Standard Practices will be approved by the responsible Section Supervisor, or applicable Plant Superintendent.
6.5.3.2 Proposed changes or modifications to plant nuclear safety-related structures, systems and components shall be reviewed as designated by the Plant Manager.
Each such modification shall be reviewed by an individual/group other than the individual/group which designed the modification, but who may be from the same organization as the individual/group which designed the modification.
Proposed modifications to plant nuclear safety-related structures, systems and components shall be approved by the Plant Manager, prior to implementation.
Unit 2 6.0-17
6.5.3.3 Individuals responsible for reviews performed in accordance with 6.5.3.1 shall be members of the site supervisory staff previously designated by the Plant Manager.
Each such review shall include a determination of whether or not additional, cross-disciplinary, review is necessary.
If deemed necessary, such review shall be performed by review personnel of the appropriate discipline.
6.5.3.4 The Plant Manager shall approve all administrative procedures requiring PORC review prior to implementation.
6.6 REPORTABLE EVENT ACTIO 6.6.1 The following actions shall be taken for REPORTABLE EVENTS:
a.
The Commission shall be notified and a report submitted pursuant to the requirements of Section 50.73 to 10 CFR Part 50, and b.
Each REPORTABLE EVENT shall be reviewed by the PORC and the results of this review shall be submitted to the NSRB and the Site Director.
Unit 2
- 6. 0-18
6.7 SAFET LIMIT VIOLA IO 6.7.1 The following actions shall be taken in the event a Safety Limit is violated:
a.
The NRC Operations Center shall be notified by telephone as soon as possible and in all cases within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
The Senior Vice President, Nuclear Power Group and the NSRB shall be notified within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
b.
A Safety Limit Violation Report shall be prepared.
The report shall be reviewed by the PORC.
This report shall describe (1) applicable circumstances preceding the violation, (2) effects of the violation upon facility components,
- systems, or structures, and (3) corrective action taken to prevent recurrence.
c.
The Safety Limit Violation Report shall be submitted to the Commission, the NSRB and the Manager of Nuclear Power within 14 days of the violation.
d.
Critical operation of the unit shall not be resumed until authorized by the Commission.
Unit 2 6.0-19
6.8 PROCEDURES INS RUC 0
S AND P OGRAMS 6.8.1 PROCEDURES 6.8.1.1 Written procedures shall be established, implemented and.
maintained covering the activities referenced below:
a.
The applicable procedures recommended in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978.
b.
Limitations on the amount of overtime worked by individuals performing safety-related functions in accordance with NRC Policy statement on working hours (Generic Letter Ho. 82-12).
c.
Surveillance and test activities of safety-related equipment.
d.
Security plan implementation.
e.
Emergency plan implementation.
f.
Fire Protection Program implementation.
g.
Radiological Effluent Manual implementing procedures.
h.
Process Control Program (PCP).
i.
Offsite Dose Calculation Manual.
Administrative procedures which control technical and cross-disciplinary review.
6.8.1.2 Each administrative procedure required by Section 6.8.1.1.a.
shall be reviewed by PORC and all other procedures required by Section 6.8.l.l.a. shall be reviewed in accordance with Section 6.5.3.
BFN Unit 2 6.0-20
'6.8.1.3 Temporary changes to procedures of Specification 6.8.1.1 may be made provided:
a.
The intent of the original procedure is not altered; b.
The change is approved by two members of the plant management staff, at least one of whom holds a Senior Operator License on the unit affected; c.
The change is documented, reviewed by the PORC and approved by the Plant Manager within 14 days of implementation, for changes in administrative procedures requiring PORC review.
d.
The change is documented, reviewed per Specification 6.5.3,.and approved by the responsible group section supervisor within 14 days of implementation, for changes to procedures other than administrative procedures.
DRILLS 6.8.2 Drills on actions to be taken under emergency conditions involving release of radioactivity are specified in the Radiological Emergency Plan and shall be conducted annually.
Annual drills shall also be conducted on the actions to be taken following failures of safety-related systems or components.
RADIATION CONTROL PROCEDURES 6.8.3 Radiation Control Procedures shall be maintained and made available to all station personnel.
These procedures shall show permissible radiation exposure and shall be consistent Unit 2 6.0-21
with the requirements of 10 CFR 20.
This radiation protection program shall be organized to meet the requirements of 10 CFR 20 except in lieu of the "control device" or "alarm signal" required by paragraph 20.203 (c) of 10 CFR 20.
6.8.3.1 Each high radiation area in which the intensity of radiation is greater than 100 mrem/hr but less than or equal to 1000 mrem/hr shall be barricaded and conspicuously posted as a high radiation area and entrance thereto shall be controlled by requiring issuance of a Radiological Work Permit.*
Any individual or group of individuals permitted to enter such areas shall be provided with or accompanied by one or more of the following:
a.
A radiation monitoring device which continuously indicates the radiation dose rate in the area.
b.
A radiation, monitoring device which continuously integrates the radiation dose rate in the area and alarms when a preset integrated dose is received.
Entry into such areas with this monitoring device may be made after the dose rate level in the area has been established and personnel have been made knowledgeable of them.
c.
An individual qualified in radiation protection procedures who is equipped with a radiation dose rate monitoring device.
This individual shall be responsible for providing positive control over the activities within the area and shall perform periodic radiation surveillance at the frequency specified by the facility Health Physicist in the Radiological Work Permit.
6.8.3.2 Each high radiation area in which the intensity of radiation is greater than 1,000 mrem/hr shall be subject to the provisions of (1) above; and, in addition, access to the source and/or area Unit 2 4.0-22
shall be secured by lock(s).
The key(s) shall be under the administrative control of the shift engineer.
In the case of a high radiation area established for a period of 30 days or less, direct surveillance to prevent unauthorized entry may be substituted for permanent access control.
- Health Physics personnel, or personnel escorted by Health Physics personnel, in accordance with approved emergency procedures, shall be exempt from the RWP issuance requirement during the performance of their assigned radiation protection
- duties, provided they comply with approved radiation protection procedures for entry into high radiation areas.
QUALITY ASSURANCE PROCEDURES EFFLUENT AND ENVIRONMENTAL MONITORING 6.8.4 Quality Assurance procedures shall be established, implemented, and maintained for effluent and environmental monitoring, using the guidance in Regulatory Guide 1.21, Rev. 1, June 1974 and Regulatory Guide 4.1, Rev. 1, April 1975 or Regulatory Guide 4.15, Dec.
1977.
BFN Unit 2 6.0-23
~
~
E
6.9 REPORTING RE UIREMENTS ROUTINE REPORTS 6.9.1 In addition to the applicable reporting requirements of Title 10, Code of Federal Regulations, the following identified reports shall be submitted to the Director of the Regional Office of NRC, unless otherwise noted.
6.9.1.1 STARTUP REPORT a.
A summary report of plant startup and power escalation testing shall be submitted following (1) receipt of an operating license, (2) amendment to the license involving a planned increase in power level, (3) installation of fuel that has a different design or has been manufactured by a different fuel supplier, and (4) modifications that may have significantly altered the nuclear, thermal, or hydraulic performance of the plant.
The report shall address each of the tests identified in the FSAR and shall include a description of the measured values of the operating conditions or characteristics obtained during the test program and a comparison of these values with design predictions and specifications.
Any corrective actions that were required to obtain satisfactory operation shall also be described.
Any additional specific details required in license conditions based on other commitments shall be included in this report.
Unit 2 6.0-24
~
~
b.
Startup reports shall be submitted within (1) 90 days following completion of the startup test program, (2) 90 days following resumption or commencement of commercial power operation, or (3) 9 months following initial criticality, whichever is earliest.
If the Startup Report does not cover all three events (i.e., initial criticality, completion of startup test program, and resumption or commencement of commercial power operation),
supplementary reports shall be submitted at least every three months until all three events have been completed.
6.9.1.2 ANNUAL OPERATING REPORT*
a.
A tabulation on an annual basis of the number of station, utility and other personnel (including contractors) receiving exposures greater than 100 mrem/yr and their associated man rem exposure according to work and job functions, **e.g., reactor operations and surveillance, inservice i'nspection, routine maintenance, special maintenance (describe maintenance),
waste processing, and refueling.
The dose assignment to various duty functions may be estimates based on pocket dosimeter, TLD, or film badge measurements.
Small exposures totaling less than 20%
of the individual total dose need not be accounted for.
In the aggregate, at least SOS of the total whole body dose received from external sources shall be assigned to specific major work functions.
b.
Any mainsteam relief valve that opens in response to reaching its setpoint or due to operator action to control reactor pressure shall be reported.
- A single submittal may be made for a multiple unit station.
- This tabulation supplements the requirements of 20.407 of 10 CFR Part 20.
BFN Unit 2 6.0-25
6.9.1.3 MONTHLY OPERATING REPORT Routine reports of operating statistics and shutdown experience shall be submitted on a monthly basis to the Office of Inspection and Enforcement, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555, with a copy to the Regional Office, to be submitted no later than the fifteenth of each month following the calendar month covered by the report.
A narrative summary of operating experience shall be submitted in the above schedule.
6.9.1.4 REPORTABLE EVENTS Reportable
- events, including corrective actions and measures to prevent re-occurrence, shall be reported to the NRC in accordance with Section 50.73 to 10 CFR 50.
6.9.1.5 RADIOACTIVE EFFLUENT RELEASE REPORT Deleted (See REM section F-2) 6.9.1.6 SOURCE TESTS Results of required leak tests performed on sources if the tests reveal the presence of 0.005 microcurie or more of removable contamination.
Unit 2 6.0-26
6.9.2 SPECIAL REPORTS Reports on the following areas shall be submitted in writing to the Director of Regional Office of Inspection and Enforcement:
1.
Fatigue Usage 6.10.1.q Annual Operating Report 2.
Relief Valve Tailpipe 3.2.F Within 30 days after inoper-ability of thermocouple and acoustic monitor on one valve.
3.
Seismic Instrumentation Inoperability 3.2.J.3 Within 10 days after 30 days of inoperability.
4.
Meteorological Monitoring 3.2.I.2 Instrumentation Inoperability Within 10 days after 7 days of inoperability.
5.
Primary Containment Integrated Leak Rate Testing 4.7.A.2 Within 90 days of completion of each test.
6.
Data shall be retrieved from all seismic instruments actuated during a seismic event and analyzed to determine the magnitude of the vibratory ground motion.
A Special Unit 2 6.0-27
Report shall be submitted within 10 days after the event describing the magnitude, frequency spectrum, and resultant effect upon plant features important to safety.
7.
Secondary Containment Leak Rate Testing*
4.7.C.
Within 90 days of completion of each test.
- Each integrated leak rate test of the secondary containment shall be the subject of a summary technical report.
This report should include data on the wind speed, wind direction, outside and inside temperatures during the test, concurrent reactor building pressure, and emergency ventilation flow rate.
The report shall also include analyses and interpretations of those data which demonstrate compliance with the specified leak rate limits.
BFN Unit 2 6.0-28
6.10 STATION 0 ERATXNG RECORDS AND RE IO 6.10.1 Records and/or logs shall be kept in a manner convenient for review as indicated below:
a.
All normal plant operation including such items as power level, fuel exposure, and shutdowns b.
Principal maintenance activities c.
Reportable Events d.
- Checks, inspections,
- tests, and calibrations of components and systems, including such diverse items as source leakage e.
Reviews of chan'ges made to the procedures or equipment or reviews of tests and experiments to comply with 10 CFR 50.59 f.
Radioactive shipments g.
Test results in units of microcuries for leak tests performed pursuant to Specification 3.8.D BFN Unit 2 6.0-29
h.
Record of annual physical inventory verifying accountability of sources on record i.
Gaseous and liquid radioactive waste released to the environs j.
Offsite environmental monitoring surveys k.
Fuel inventories and transfers 1.
Plant radiation and contamination surveys m.
Radiation exposures for all plant personnel n.
- Updated, corrected, and as-built drawings of the plant o.
Reactor coolant system inservice inspection p.
Minutes of meetings of the NSRB q.
Design fatigue usage evaluation Monitoring and recording requirements below will be met for various portions of the reactor coolant pressure boundary (RCPB) for which detailed fatigue usage evaluation per the ASME Boiler'nd Pressure Vessel Code Section III was performed for the conditions defined in the design specification.
In this plant, the applicable codes require fatigue usage evaluation for the reactor pressure vessel only.
The locations to be monitored shall be:
1.
The feedwater nozzles 2.
The shell at or near the waterline 3.
The flange studs Unit 2 6.0-30
Transients that. occur during plant operations will be reviewed and a cumulative fatigue usage factor determined.
For transients which are more severe than the transients evaluated in the stress
- report, code fatigue usage calculations will be made and tabulated separately.
In the annual operating report, the fatigue usage factor determined for the transients defined above shall be added and a cumulative fatigue usage factor to date shall be reported.
When the cumulative usage factor reaches a value of 1.0, an inservice inspection shall be included for the specific location at the next scheduled inspection (3-1/3-year interval) period and 3-1/3-year intervals thereafter, and a subsequent evaluation performed in accordance with the rules of ASME Section XI Code if any flaw indications are detected.
The results of the evaluation shall be submitted in a Special Report for review by the Commission.
6.10.2 Except where covered by applicable regulations, items a through h above shall be retained for a period of at least 5 years and item i through q shall be retained for the life of the plant.
A complete inventory of radioactive materials in possession shall be maintained current at all times.
1.
See paragraph H-415.2, ASME Section III, 1965 Edition.
Unit 2 6.0-31
- 1. The PCP shall be approved by the Commission prior to implementation.
2.
Changes to the PCP shall be submitted to the Commission in the semi-annual Radioactive Effluent Release Report for the period in which the change(s) was made.
This submittal shall contain:
a.
Sufficiently detailed information to totally support the change.
b.
A determination that the change did not change the overall conformance of the solidified product to existing criteria.
6.12 OFFS TE DOSE CA CULA IO MA AL ODCM
- 1. The ODCM shall be approved by the Commission prior to implementation.
2.
Changes to the ODCM shall be submitted to the Commission in the semi-annual Radioactive Effluent Release Report for the period in which the change(s) was made.
This submittal shall contain:
a.
Sufficiently detailed information to totally support the change.
3.
Changes to the ODCM shall become effective upon review and acceptance by PORC.
Unit 2 6.0-32
~
6.13 RADXOLOG CAL EFFLUE NA AL RE
- 1. The REM shall be approved by the Commission prior to implementation.
2.
Changes to the REM shall be reviewed by PORC prior to implementation.
- 3. Changes to the REM shall be approved by the Commission prior to implementation.
BFN Unit 2 6.0-33
~
BFH TECHNICAL SPECIFICATIONS 6.0 ADMIHISTRATIVE CONTROLS 6.0 ADMINISTRATIVE CO ROLS 6.1.1 The Plant Manager shall be responsible for overall unit operation and shall delegate in writing the succession to this responsibility during his absence.
6.1.2 The Shift Operations Supervisor (or during his absence from the Control Room, a designated individual) shall be responsible for the Control Room command function.
A management directive to this effect, signed by the Site Director shall be reissued to all station personnel on an annual basis.
6.2.1 Offs te and Onsite 0
anizations An onsite and offsite organization shall be established for unit operation and corporate management.
The onsite and offsite organization shall include the positions for activities affecting the safety of the nuclear power plant.
- a. Lines of authority, responsibility, and communication shall be established and defined from the highest management levels through intermediate levels to and including all operating organization positions.
These relationships shall be documented and updated, as appropriate, in the form of organizational
- charts, functional descriptions of departmental responsibilities and relationships, and gob descriptions for Key personnel positions, or in equivalent forms of documentation.
These requirements shall be documented in the FSAR and will be updated in accordance with 10 CFR 50.71(e).
BFH Unit 3
6.2.1 (Cont'd)
- b. There shall be an individual executive position (corporate officer) in the offsite organization having corporate responsibility for overall plant nuclear safety.
This individual shall take any measures needed to ensure acceptable performance of the staff in operating, maintaining, and providing technical support in the plant so that continued nuclear safety is assured.
- c. There shall be an individual management position in the onsite organization having responsibility for overall unit safe operation, and this position shall have control over those onsite resources necessary for safe operation and maintenance of the plant.
- d. The individuals who train the operating staff and those who carry out health physics and quality assurance functions may report to the appropriate onsite manager;
- however, they shall have sufficient organizational freedom to ensure their independence from operating pressures.
6.2.2 Plant Staff
- a. Shift manning requirements, shall as a minimum, be as described in Table 6.2.A and below.
b.
A licensed senior reactor operator shall be present at the site at all times when there is fuel in the reactor.
c.
A licensed reactor operator shall be in the control room whenever there is fuel in the reactor.
BFN Unit 3 6.0-2
6.2.2 (Cont.)
d.
Two licensed reactor operators shall be in the control room during any cold startups, while shutting down the reactor, and during recovery from unit trip.
In addition, a person holding a senior operator license shall be in the control room for that unit whenever it is in an operational mode other than cold shutdown or refueling.
e.
A Health Physics Technician>> shall be present at the facility at all times when there is fuel in the reactor.
f.
A person holding a senior operator license or a senior operator license limited to fuel handling, shall be present during alteration of the core to directly supervise the activity and during this time shall not be assigned other duties.
g.
A site fire brigade of at least five members shall be maintained onsite at all times.*
The fire brigade shall not include the Shift Engineer and the other members of the minimum shift crew necessary for safe shutdown of the unit, nor any personnel required for other essential functions during a fire emergency.
- The Health Physics Technician and fire brigade composition may be less than the minimum requirements for a period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, in order to accommodate unexpected
- absence, provided immediate action is taken to fillthe required positions.
Unit 3 6.0-3
~
y Minimum Shi t Crew Re ui ementsb Position Units 0 e atio e of License Senior Operatora Senior Operator Licensed Operators Additional Licensed Operatorsc Assistant Unit Operators (AUO)
Health Physics Technician 9
1 2d 1
1 1
1 0
1 2
2 3
3 3
3 0
1 2
2 4
4 5
5 0
1 1
1 1
1 1
1 SRO SRO RO or SRO RO or SRO None Hone Hone ote for Tab e
2 a.
A senior operator will be assigned responsibility for overall plant operation at all times there is fuel in any unit.
b.
Except for the senior operator discussed in note "a", the shift crew composition may be one less than the minimum requirements of Table 6.2.A for a period of time not to exceed two hours in order to accommodate unexpected absence of on-duty shift crew members provided immediate action is taken to restore the shift crew composition to within the minimum requirements of Table 6.2.A.
This provision does not permit any shift crew position to be unmanned upon shift change due to an oncoming shift crewman being late or absent.
c.
One of the Additional Licensed Operators must be assigned to each control room with an operating unit.
d.
The number of required licensed personnel, when the operating units are controlled from a common control room, are two senior operators and four operators.
BFN Unit 3 6.0-4
6.3 PLANT S AFF UALIFICATIONS Qualifications of the Browns Ferry Huclear Plant management and operating staff shall meet the minimum acceptable levels as described in ANSI H18.1, Selection and Training of Nuclear Power Plant Personnel, dated March 8, 1971.
The qualifications of the Health Physics Supervisor will meet or exceed the minimum acceptable levels as described in Regulatory Guide 1.8, Revision 1, dated September 1975.
The Shift Technical Advisor shall have a bachelor's degree or equivalent in a scientific or engineering discipline with specific training in plant design and transient and accident response and analysis.
6.4 TERAI IHG A retraining and replacement training program for station personnel shall be in accordance with AHSI N18.1, Selection and Training of Nuclear Power Plant Personnel, dated March 8, 1971.
The minimum frequency of the retraining program shall be every two years.
6.5 PLA REVIEW A AUDIT 6.5.1 PLANT OPERATIONS REVIEW COMMITTEE (PORC)
FUNCTION 6.5.1.1 a.
The PORC shall function to advise the Plant Manager in all matters related to nuclear safety.
b.
This advisory function shall be performed by the PORC acting in a formal meeting or by members acting individually without a formal meeting.
Unit 3 6.0-5
COMPOSITION 6.5.1.2 The PORC shall be composed of the:
a.
Chairman:
Plant Manager Alternate Chairman:
Assistant to Plant Manager Alternate Chairman or Member:
Technical Services Superintendent Member:
Unit Superintendents (3)
Member:
Maintenance Superintendent Member:
Quality Assurance Staff Supervisor Member:
Health Physics Supervisor b.
All alternate chairmen and alternate members shall be appointed in writing by. the PORC chairman.
MEETING FREQUENCY 6.5.1.3 The PORC shall convene in a formal meeting at least once a
month and as directed by the chairman.
Other PORC meetings may be requested by the chairmen or members as required.
BFN Unit 3 6.0-6
6.5.1.4 For expedited meetings, when it is not practical to convene as a
- group, the chairman or alternate chairman may conduct committee business by polling the members individually (by telephone or in person) or via a serialized review.
QUORUM 6.5.1.5 The quorum necessary for the PORC to act in a formal meeting shall consist of the chairman or alternate chairman and at least five members or their alternates.
Members shall be considered present if they are in telephone communication with the committee.
RESPONSIBILITIES 6.5.1.6 The PORC shall be responsible for the activities listed below.
The PORC may delegate the performance of reviews, but will maintain cognizance over and responsibility for them, e.g.,
subcommittees.
a.
Review of administrative procedures for the control of the technical and cross-disciplinary review of (1) all procedures required by Specification 6.8.1.1, and changes
- thereto, (2) any other procedures and changes thereto determined by the Plant Manager to affect nuclear safety.
b.
Review of the administrative procedures required by Appendix A of Regulatory Guide 1.33, Revision 2, February 1978 and changes thereto.
c.
Review of emergency operating procedures and changes thereto.
d.
Review implementing procedures of the Radiological Emergency Plan and the Industrial Security Program.
Unit 3 6.0-7
e.
Review of all proposed changes to the Technical Specifications.
f.
Review of safety evaluation for proposed tests or experiments to be completed under the provisions of 10 CFR 50.59 g.
Review proposed changes to the Radiological Effluent Manual.
h.
Review adequacy of the Process Control Program and Offsite Dose Calculation Manual at least once every 24 months.
i.
Review changes to the radwaste treatment systems.
Review of every unplanned onsite release of radioactive material to the environs including the preparation and forwarding of reports covering evaluation, recommendation, and disposition of the corrective action to prevent recurrence to the Director, Nuclear Power and to the Nuclear Safety Review Board.
k.
Review of all safety evaluations for modifications to structures, systems or components that affect nuclear safety to verify that such actions did not constitute an unreviewed safety question as defined in 10 CFR 50.59, or requires a
change to these Technical Specifications.
Unit 3 6.0-8
1.
Review of reportable
- events, unusual events, operating anomalies, and abnormal performance of plant equipment.
m.
Investigate reported or suspected incidents involving safety questions or violations of the Technical Specifications.
n.
Review of unit operations to detect potential hazards to nuclear safety.
Items that may be included in this review are NRC inspection reports, QA audit, NSRB audit results, American Nuclear Insurer (ANI) inspection results, and significant corrective action reports (CARs).
o.
Performance of special reviews, investigations, or analysis, and report thereon as requested by the Plant Manager or the Nuclear Safety Review Board.
BFN Unit 3 6.0-9
AUTHORITY 6.5.1.7 The PORC shall:
a.
Recommend to the Plant'anager in writing, approval, or disapproval of items considered under 6.5.1.6.a through i above.
1.
The recommendation shall be based on a majority vote of the PORC at a formal meeting.
2.
The recommendation shall be based on a unanimous vote of the PORC when the PORC members are acting individually.
3.
Each member or alternate member shall have one vote.
b.
Furnish for consideration a determination in writing with regard to whether or not each item considered under 6.5.1.6.f above constitutes an unreviewed safety question.
c.
Make recommendations to the Plant Manager in writing that action reviewed under 6.5.1.6.k above did not constitute an unreviewed safety question.
d.
Provide written notification within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the Site Director and the Huclear Safety Review Board of disagreements between the PORC and the Plant Manager.
However, the Plant Manager shall have responsibility for resolution of such disagreements pursuant to Specification 6.1.
BFN Unit 3 6.0-10
~
~
RECORDS 6.5.1.8 The PORC shall maintain written minutes of each PORC meeting including expedited meetings that, as a minimum, document the result of all PORC activities performed under the responsibility and authority provisions of these technical specifications.
Copies shall be provided to the Site Director and the Huclear Safety Review Board.
6.5.2 NUCLEAR SAFETY REVIEW BOARD (HSRB)
FUHCTIOH 6.5.2.1 The NSRB shall function to provide independent review and audit cognizance of designated activities in the areas of:
a.
Huclear power, plant operations b.
Huclear engineering c.
Chemistry and radiochemistry d.
Metallurgy e.
Instrumentation and control f.
Radiological safety g.
Mechanical and electrical engineering, and h.
Quality assurance practices COMPOSITION 6.5.2.2 The NSRB shall be composed of at least five members, including the Chairman.
Members of the NSRB may be from the Nuclear Power Group or other TVA organizations, or external to TVA.
Unit 3
QUALIFICATIOHS 6.5.2.3 The Chairman,
- members, alternate members of the HSRB shall be appointed in writing by the Senior Vice President, Nuclear Power Group and shall have an academic degree in engineering or a physical science field, or the equivalent; and in addition, shall have a minimum of 5 years technical experience in one or more areas given in 6.5.2.1.
No more than two alternates shall participate as voting members in HSRB activities at any one time.
CONSULTANTS 6.5.2.4 Consultants shall be utilized to provide expert advice as determined by the HSRB.
MEETING FREQUENCY 6.5.2.5 The NSRB shall meet at least once per six months.
QUORUM 6.5.2.6 The minimum quorum of the NSRB necessary for the performance of the HSRB review and audit functions of these technical specifications shall consist of more than half of the NSRB membership or at least five members, whichever is greater.
The quorum shall include the Chairman or his appointed alternate and the HSRB members including appointed alternate members meeting the requirements of 6.5.2.3.
No more than a minority of the quorum shall have line responsibility for operation of the unit.
BFN Unit 3 6.0-12
REVIEW 6.5.2.7 The NSRB shall review:
a.
The safety evaluations for:
(1) changes to procedures, equipment or systems, and (2) tests or experiments completed under the provision of Section 50.59, 10 CFR, to verify that such actions did not constitute an unreviewed safety question.
b.
Proposed changes to procedures, equipment or systems which involve an unreviewed safety question as defined in Section 50.59, 10 CFR.
c.
Proposed tests or experiments which involve an unreviewed safety question as defined in Section 50.59, 10 CFR.
d.
Proposed changes to Technical Specifications or this Operating License.
e.
Violations of Codes, regulations,
- orders, Technical Specifications, license requirements, or of internal procedures or instructions having nuclear safety significance.
f.
Significant operating abnormalities or deviations from normal and expected performance of plant equipment that affect nuclear safety.
g.
All Reportable Events h.
All recognized indications of an unanticipated deficiency in some aspect of design or operation of structures,
- systems, or components that could affect nuclear safety; and i.
Reports and meeting minutes of the PORC.
BFN Unit 3 6.0-13
~,
~
AUDITS 6.5.2.8 Audits of unit activities shall be performed under the cognizance of the NSRB.
These audits shall encompass:
a.
The conformance of plant operation to provisions contained within the Technical Specifications and applicable license conditions at least once per 12 months.
b.
The performance, training and qualifications of the entire plant staff at least once per 12 months.
c.
The results of actions taken to correct deficiencies occurring in site equipment, structures, systems or method of operation that affect nuclear safety at least once per 6
months.
d.
The performance of activities required by the Operational Quality Assurance Program to meet the criteria of Appendix B,
10 CPR Part 50, at least once per 24 months.
e.
The Site Radiological Emergency Plan and implementing procedures at least once every 12 months.
f.
The Plant Physical Security Plan and implementing procedures at least once every 12 months.
g.
Any other area of site operation considered appropriate by the NSRB or the Senior Vice President, Nuclear Power Group.
h.
The fire protection programmatic controls including the implementing procedures at least once per 24 months.
Unit 3 6.0-14
i.
An independent fire protection and loss prevention program inspection and audit shall be performed annually utilizing either qualified offsite license personnel or an outside fire protection firm.
j.
An inspection and audit of the fire protection and loss prevention program shall be performed by an outside qualified fire consultant at intervals no greater than 3
years.
k.
The Radiological Environmental Monitoring program and the results thereof at least once per 12 months.
1.
The performance of activities required by the Quality Assurance Program to meet the criteria of Regulatory Guide 4.15, December 1977, or Regulatory Guide 1.21, Rev. 1, 1974, and Regulatory Guide 4.1, 1975, at least once every 12 months.
m.
The performance of activities required by the Safeguards Contingency Plan to meet the criteria of 10 CFR 73.40(d) at least once every 12 months.
n.
The Offsite Dose Calculation Manual and implementing procedures at least once per 24 months.
o.
The Process Control Program and implementing procedures for solidification of wet radioactive wastes at least once per 24 months.
p.
The Radiological Effluent Manual and implementing procedures at least once per 12 months.
BFN Unit 3 6.0-15
AUTHORITY 6.5.2.9 The NSRB shall report to and advise the Senior Vice President, Nuclear Power Group on those areas of responsibility specified in Specifications 6.5.2.7 and 6.5.2.8.
RECORDS 6.5.2.10 Reports of activities shall be prepared,
- approved, and distributed as indicated below:
a.
Minutes of each NSRB meeting shall be prepared, approved and forwarded to the Senior Vice President, Nuclear Power Group within 14 days following each meeting.
b.
Reports of reviews encompassed by Section 6.5.2.7
- above, shall be prepared, approved and forwarded to the Senior Vice President, Nuclear Power Group within 14 days following completion of the review.
c.
Audit reports encompassed by Specification 6.5.2.8
- above, shall be forwarded to the Senior Vice President, Nuclear Power Group and to the management positions responsible for the areas audited within 30 days after completion of the audit.
BFN Unit 3 6.0-16
6.5.3 TECHHICAL REVIEW AND APPROVAL OF PROCEDURES ACTIVITIES 6.5.3.1 Procedures required by Technical Specification 6.8.1.1 and other procedures which affect plant nuclear safety, and changes (other than editorial or typographical changes) thereto, shall be prepared, reviewed and approved.
Each procedure or procedure change shall be reviewed by an individual other than the preparer.
The reviewer may be from the same organization or from a different organization.
Procedures other than Site Director Standard Practices will be approved by the responsible Section Supervisor, or applicable Plant Superintendent.
6.5.3.2 Proposed changes or modifications to plant nuclear safety-related structures, systems and components shall be reviewed as designated by the Plant Manager.
Each such modification shall be reviewed by an individual/group other than the individual/group which designed the modification, but who may be from the same organization as the individual/group which designed the modification.
Proposed modifications to plant nuclear safety-related structures, systems and components shall be approved by the Plant Manager, prior to implementation.
BFH Unit 3 6.0-17
E
6.5.3.3 Individuals responsible for reviews performed in accordance with 6.5.3.1 shall be members of the site supervisory staff previously designated by the Plant Manager.
Each such review shall include a determination of whether or not additional, cross-disciplinary, review is necessary.
If deemed necessary, such review shall be performed by review personnel of the appropriate discipline.
6.5.3.4 The Plant Manager shall approve all administrative procedures requiring PORC review prior to implementation.
6.6 REPORTABLE EVENT ACT 0 6.6.1 The following actions shall be taken for REPORTABLE EVENTS:
a.
The Commission shall be notified and a report submitted pursuant to the requirements of Section 50.73 to 10 CFR Part 50, and b.
Each REPORTABLE EVENT shall be reviewed by the PORC and the results of this review shall be submitted to the NSRB and the Site Director.
Unit 3 6.0-18
~
C 4
6.7 SAFE Y LIMIT VIOLA IO 6.7.1 The following actions shall be taken in the event a Safety Limit is violated:
a.
The NRC Operations Center shall be notified by telephone as soon as possible and in all cases within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
The Senior Vice President, Nuclear Power Group and the NSRB shall be notified within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
b.
A Safety Limit Violation Report shall be prepared.
The report shall be reviewed by the PORC.
This report shall describe (1) applicable circumstances preceding the violation, (2) effects of the violation upon facility components,
- systems, or structures, and (3) corrective action taken to prevent recurrence.
c.
The Safety Limit Violation Report shall be submitted to the Commission, the NSRB and the Manager of Nuclear Power within 14 days of the violation.
d.
Critical operation of the unit shall not be resumed until authorized by the Commission.
BFN Unit 3 6.0-19
6.8 PROCEDURES NST UCTIO S
ND PROG S
6.8.1 PROCEDURES 6.8.1.1 Written procedures shall be established, implemented and maintained covering the activities referenced below:
a.
The applicable procedures recommended in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978.
b.
Limitations on the amount of overtime worked by individuals performing safety-related functions in accordance with NRC Policy statement on working hours (Generic Letter No. 82-12).
c.
Surveillance and test activities of safety-related equipment.
d.
Security plan implementation.
e.
Emergency plan implementation.
f.
Fire Protection Program implementation.
g.
Radiological Effluent Manual implementing procedures.
h.
Process Control Program (PCP).
i.
Offsite Dose Calculation Manual.
Administrative. procedures which control technical and cross-disciplinary review.
6.8.1.2 Each administrative procedure required by Section 6.8.1.l.a. shall be reviewed by PORC and all other procedures required by Section 6.8.l.l.a. shall be reviewed in accordance with Section 6.5.3.
BFN Unit 3 6.0-20
6.8.1.3 Temporary changes to procedures of Specification 6.8.1.1 may be made provided:
a.
The intent of the original procedure is not altered; b.
The change is approved by two members of the plant management staff, at least one of whom holds a Senior Operator License on the unit affected; c.
The change is documented, reviewed by the PORC and approved by the Plant Manager within 14 days of implementation, for changes in administrative procedures requiring PORC review.
d.
The change is documented, reviewed per Specification 6.5.3, and approved by the responsible group section supervisor within 14 days of implementation, for changes to procedures other than administrative procedures.
DRILLS 6.8.2 Drills on actions to be taken under emergency conditions involving release of radioactivity are specified in the Radiological Emergency Plan and shall be conducted annually.
Annual drills shall also be conducted on the actions to be taken following failures of safety-related systems or components.
RADIATION CONTROL PROCEDURES 6.8.3 Radiation Control Procedures shall be maintained and made available to all station personnel.
These procedures shall show permissible radiation exposure and shall be consistent Unit 3 6.0-21
with the requirements of 10 CFR 20.
This radiation protection program shall be organized to meet the requirements of 10 CFR 20 except in lieu of the "control device" or "alarm signal" required by paragraph 20.203 (c) of 10 CFR 20.
6.8.3.1 Each high radiation area in which the intensity of radiation is greater than 100 mrem/hr but less than or equal to 1000 mrem/hr shall be barricaded and conspicuously posted as a high radiation area and entrance thereto shall be controlled by requiring issuance of a Radiological cwork Permit.*
Any individual or I
group of individuals permitted to enter such areas shall be provided with or accompanied by one or more of the following:
a.
A radiation monitoring device which continuously indicates the radiation dose rate in the area.
b.
A radiation monitoring device which continuously integrates the radiation dose rate in the area and alarms when a preset integrated dose is received.
Entry into such areas with.this monitoring device may be made after the dose rate level in the area has been established and personnel have been made knowledgeable of them.
c.
An individual qualified in radiation protection procedures who is equipped with a radiation dose rate monitoring device.
This individual shall be responsible for providing positive control over the activities within the area and shall perform periodic radiation surveillance at the frequency specified by the facility Health Physicist in the Radiological cwork Permit.
6.8.3.2 Each high radiation area in which the intensity of radiation is greater than 1,000 mrem/hr shall be subject to the provisions of (1) above; and, in addition, access to the source and/or area Unit 3 4.0-22
shall be secured by lock(s).
The key(s) shall be under the administrative control of'he shift engineer.
In the case of a high radiation area established for a period of 30 days or less, direct surveillance to prevent unauthorized entry may be substituted for permanent access control.
- Health Physics personnel, or personnel escorted by Health Physics personnel, in accordance with approved emergency procedures, shall be exempt from the RWP issuance requirement during the performance of their assigned radiation protection
- duties, provided they comply with approved radiation protection procedures for entry into high radiation areas.
QUALITY ASSURANCE PROCEDURES - EFFLUENT AND EHVIRONMENTAL MONITORING 6.8.4 Quality Assurance procedures shall be established, implemented, and maintained for effluent and environmental monitoring, using the guidance in Regulatory Guide 1.21, Rev. 1, Juiie 1974 and Regulatory Guide 4.1, Rev. 1, April 1975 or Regulatory Guide 4.15, Dec.
1977.
BFN Unit 3 6.0-23
6.9 REPOR ING RE UIREME S
ROUTINE REPORTS 6.9.1 In addition to the applicable reporting requirements of Title 10, Code of Federal Regulations, the following identified reports shall be submitted to the Director of the Regional Office of NRC, unless otherwise noted.
6.9.1.1 STARTUP REPORT a.
A summary report of plant startup and power escalation testing shall be submitted following (1) receipt of an operating license, (2) amendment to the license involving a planned increase in power level, (3) installation of fuel that has a different design or has been manufactured by a different fuel supplier, and (4) modifications that may have significantly altered the nuclear, thermal, or hydraulic performance of the plant.
The report shall address each of the tests identified in the FSAR and shall include a
description of the measured values of the operating conditions or characteristics obtained during the test program and a comparison of these values with design predictions and specifications.
Any corrective actions that were required to obtain satisfactory operation shall also be described.
Any additional specific details required in license conditions based on other commitments shall be included in this report.
BFN Unit 3 6.0-24
b.
Startup reports shall be submitted within (1) 90 days following completion of the startup test program, (2) 90 days following resumption or commencement of commercial power operation, or (3) 9 months following initial criticality, whichever is earliest.
If the Startup Report does not cover all three events (i.e., initial criticality, completion of startup test program, and resumption or commencement of commercial power operation),
supplementary reports shall be submitted at least every three months until all three events have been completed.
6.9.1.2 AHHUAL OPERATIHG REPORT*
a.
A tabulation on an annual basis of the number of station, utility and other personnel (including contractors) receiving exposures greater than 100 mrem/yr and their associated man rem exposure according to work and job functions, **e.g., reactor operations and surveillance, inservice inspection, routine maintenance, special maintenance (describe maintenance),
waste processing, and refueling.
The dose assignment to various duty functions may be estimates based on pocket dosimeter, TLD, or film badge measurements.
Small exposures totaling less than 20/
of the individual total dose need not be accounted for.
In the aggregate, at least SOS of the total whole body dose received from external sources shall be assigned to specific major woxk functions.
b.
Any mainsteam relief valve that opens in response to reaching its setpoint or due to operator action to control reactor pressure shall be reported.
- A single submittal may be made for a multiple unit station.
- This tabulation supplements the requirements of 20.407 of 10 CFR Part 20.
Unit 3 6.0-25
6.9.1.3 MONTHLY OPERATING REPORT Routine reports of operating statistics and shutdown experience shall be submitted on a monthly basis to the Office of Inspection and Enforcement,'.S.
Nuclear Regulatory Commission, Washington, D.C. 20555, with a copy to the Regional Office, to be submitted no later than the fifteenth of each month following the calendar month covered by the report.
A narrative summary of operating experience shall be submitted in the above schedule.
6.9.1.4 REPORTABLE EVEHTS Reportable
- events, including corrective actions and measures to prevent re-occurrence, shall be reported to the HRC in accordance with Section 50.73 to 10 CFR 50.
6.9.1.5 RADIOACTIVE EFFLUEHT RELEASE REPORT Deleted (See REM section F-2) 6.9.1.6 SOURCE TESTS Results of required leak tests performed on sources if the tests reveal the presence of 0.005 microcurie or more of removable contamination.
Unit 3 6.0-26
6.9.2 SPECIAL REPORTS Reports on the following areas shall be submitted in writing to the Director of Regional Office of Inspection and Enforcement:
1.
Fatigue Usage 6.10.1.q Annual Operating Report 2.
Relief Valve Tailpipe 3.2.F Within 30 days after inoper-ability of thermocouple and acoustic monitor on one valve.
3.
Seismic Instrumentation Inoperability 3.2.J.3 Within 10 days after 30 days of inoperability.
4.
Meteorological Monitoring 3.2.?.2 Instrumentation Inoperability Within 10 days after 7 days of inoperability.
5.
Primary Containment Integrated Leak Rate Testing 4.7.A.2 Within 90 days of completion of each test.
6.
Data shall be retrieved from all seismic instruments actuated during a seismic event and analyzed to determine the magnitude of the vibratory ground motion.
A Special BFH Unit 3 6.0-27
Report shall be submitted within 10 days after the event describing the magnitude, frequency spectrum, and resultant effect upon plant features important to safety.
7.
Secondary Containment Leak Rate Testing*
4.7.C.
Within 90 days of completion of each test.
- Each integrated leak rate test of the secondary containment shall be the subject of a summary technical report.
This report should-include data on the wind speed, wind direction, outside and inside temperatures during the test, concurrent reactor building pressure, and emergency ventilation flow rate.
The report shall also include analyses and interpretations of those data which demonstrate compliance with the specified leak rate limits.
BFN Unit 3 6.0-28
6.10 STATIO OPERA G RECORDS A
RETE IO 6.10.1 Records and/or logs shall be kept in a manner convenient for review as indicated below:
a.
All normal plant operation including such items as power level, fuel exposure, and shutdowns b.
Principal maintenance activities c.
Reportable Events d.
- Checks, inspections,
- tests, and calibrations of components and systems, including such diverse items as source leakage e.
Reviews of changes made to the procedures or equipment or reviews of tests and experiments to comply with 10 CFR 50.59 f.
Radioactive shipments g.
Test results in units of microcuries for leak tests performed pursuant to Specification 3.8.D BFH Unit 3 6.0-29
I,
~ I'.
Record of annual physical inventory verifying accountability of sources on record i.
Gaseous and liquid radioactive waste released to the environs Offsite environmental monitoring surveys k.
Fuel inventories and transfers 1.
Plant radiation and contamination surveys m.
Radiation exposures for all plant personnel n.
- Updated, corrected, and as-built drawings of the plant o.
Reactor coolant system inservice inspection p.
Minutes of meetings of the NSRB q.
Design fatigue usage evaluation Monitoring and recording requirements below will be met for 1
various portions of the reactor coolant pressure boundary (RCPB) for which detailed fatigue usage evaluation per the ASME Boiler and Pressure Vessel Code Section III was performed for the conditions defined in the design specification.
In this plant, the applicable codes require fatigue usage evaluation for the reactor pressure vessel only.
The locations to be monitored shall be:
1.
The feedwater nozzles 2.
The shell at or near the waterline 3.
The flange studs Unit 3 6.0-30
Transients that occur during plant operations will be reviewed and a cumulative fatigue usage factor determined.
For transients which are more severe than the transients evaluated in the stress
- report, code fatigue usage calculations will be made and tabulated separately.
In the annual operating report, the fatigue usage factor determined for the transients defined above shall be added and a cumulative fatigue usage factor to date shall be reported.
When the cumulative usage factor reaches a value of 1.0, an inservice inspection shall be included for the specific location at the next scheduled inspection (3-1/3-year interval) period and 3-1/3-year intervals thereafter, and a subsequent evaluation performed in accordance with the rules of ASME Section XI Code if any flaw indications are, detected.
The results of the evaluation shall be submitted in a Special Report for review by the Commission.
6.10.2 Except where covered by applicable regulations, items a through h above shall be retained for a period of at least 5 years and item i thr'ough q shall be retained for the life of the plant.
A complete inventory of radioactive materials in possession shall be maintained current at all times.
1.
See paragraph N-415.2, ASME Section III, 1965 Edition.
Unit 3 6.0-31
I J'
6.11 PROCESS CONTROL PROGRAM PCP
- 1. The PCP shall be approved by the Commission prior to implementation.
2.
Changes to the PCP shall be submitted to the Commission in the semi-annual Radioactive Effluent Release Report for the period in which the change(s) was made.
This submittal shall contain:
a.
Sufficiently detailed information to totally support the change.
b.
A determination that the change did not change the overall conformance of the solidified product to existing criteria.
3.
Changes to the PCP shall become effective upon review and acceptance by PORC.
6.12 OFFSITE DOSE CALCULA ION L MANUAL ODCM
- 1. The ODCM shall be approved by the Commission prior to implementation.
- 2. Changes to the ODCM shall be submitted to the Commission in the semi-annual Radioactive Effluent Release Report for the period in which the change(s) was made.
This submittal shall contain:
a.
Sufficiently detailed information to totally support the change.
3.
Changes to the ODCM shall become effective upon review and acceptance by PORC.
Unit 3 6.0-32
- 6. 13 RADIOLOGICAL EFFLUE MAHUAL REM
- 1. The REM shall be approved by the Commission prior to implementation.
2.
Changes to the REM shall be reviewed by PORC prior to implementation.
3.
Changes to the REM shall be approved by the Commission prior to implementation.
BFH Unit 3 6.0-33
r 4e
~>
si 1