Confirms Discussion W/O Thompson on 810402 Re Railroad Embankment North of Spray Pond.Daily Monitoring Logs Maintained by Bechtel Subcontractor Engineers Indicate That Tech Specs Were Met by Subcontractor
ML18030A246
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 04/02/1981
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To: Youngblood B
Office of Nuclear Reactor Regulation
References
PLA-701, NUDOCS 8104060618
Download: ML18030A246 (2)


Text

A W%

l RKGUI.AT INFORMATION DISTR IBUTIO STEM (RIOS)

ACCESSION hlBR+ 8104060618 OOC ~ DATEt 81/04/02'OTAR I2EO g NO FACIL'.50 387 Susquehanna Stcam Electr ic Stations Unit ir Pennsylva 50~388 Susquehanna Steam E'Iectr ic Stations Unit 2'i Pennsylva AUTH",NAME AUTHOR AFFILIATION CURTISrN,WE Pennsylvania Power 8, Light Co ~

REC IP ~ NAME RKC IP IKNT AFFILIATION YOUNGBLOODrB~ J ~

Licensing, Branch 1

DOCKET' 050 50003 8

SUBJECT!'onfirms discussion w/0 Thompson on 810402 re ra{lroad embankment nor th of spray pond,Daily monitoring logs maintained by Bechtel subcontractor engineers indicate. that.

Tech Specs were met by subcontr actor.

OISTRIBUTION COOEt BOOIS COPIES RECEIVES:LTR ENCL g SIZEi J TITLE: PSAR/FSAR AMDTS and Related Cor'respondence NOTES)Send I8E 3 copies FSAR 8 all amends'end I8E 3 copies FSAR 8 all amends.

05000387 05000388 RECIPIENT ID COOK/NAME ACTION!

A/O LICENSNG RUSHBROOKrM, INTERNALS ACCID EYAL BR26 CHEM ENG BR 08 CORK PKRF BR 10.

KMKRG PREP 22',

GKOSCIENCKS l4 HYO/GEO BR 15 I8K 06-LIC QUAL BR MECH ENG BR 18 NRC POR 02'P LIC BR PROC/TST REV 20

'O S

S BR22' FILE 01 RUC G BR25 COPIES LTTR ENC 1

1 1

1 1

1 1

2 3.

1 1

1 1

1 1

1 1

REC IPIKNT IO COOK/NAME YOUNGBLOODPB STARKrR ~

04 AUX SYS BR 07 CONT'YS BR 09 EFF TR SYS BR12 EQUIP QUAL BR13 HUM FACT ENG BR I8C SYS BR 16 LIC GUID BR MATI. ENG BR 17 MPA OELO POwER SYS BR lo QA BR 21 REAC SYS BR 23 SIT ANAL BR 24

'YS INTKRAC BR COPIES I.TTR ENCL 1

1 1

1 1

3 1

1 1

1 1

1 1

0 0

1 1

1 1

1 1

1 1

EXTERNALS ACRS NSIC 27 05 LPOR 03 C

TOTAL NUMBER OF COPIES REOUIREO:

LTTR

TWO NORTH NINTH STREET, ALLENTOWN, PA. 18

'I 01 PHONE. t215) 770-5151 L )~>>r /j~

NORMAN W. CURTIS Vice President-Engineering 8 Construction-Nuclear 770-8381 April 2, 1981 Mr. B.J.

Youngblood Licensing Branch 1

U.S. Nuclear Regulatory Commission Washington, D AC.

20555 Susquehanna Steam Electric Station Docket Nos.

50-387 and 50-388 Railroad Embankment-North of Spray Pond ER100450 File 841-2 PLA-701

Dear Mr. Youngblood:

This memorandum confirms our discussion with Mr. Owen Thompson, April 2, 1981 on the above subject.

The subcontractor who performed this work was administered by Bechtel'ower Corporation subcontract engineers.

These engineers verified that proper materials and compacting equipment were used by the subcontractor, The Bechtel subcontractor engineers maintained daily monitoring logs which indicate that the technical specifications were met.

Finally, Bechtel provided. to PP8L a written statement that the subcontractor had completed the work in accordance with all subcontract terms and conditions.

Yery truly yours, bcc:

W. E.

B.A.

C.T.

R.3.

N.W. Curtis Barberich Snapp Coddington Shovlin N.W. Curtis Yice President-Engineering and construction-Nuclear cc:

R.M. Stark goo~

(/o SXO gp 6 0 g~p PENNSYLVANIA POWER 8

LIGHT COMPANY