ENCLOSURE
1
I
Valley Authority
Browns Ferry l, 2,
and
3
Oocket
Nos:
50-259,
260
and
296
License
Nos:
OPR-33,
52,
and 68
The
following violation
was
identified
during
an
inspection
conducted
on
July 27 - August 19,
1985.
The Severity
Level
was
assigned
in accordance
with
the
NRC Enforcement Policy ( 10 CFR Part 2, Appendix C)
~
Technical Specification 6.3.A. 1
requires that detailed written procedures,
including
applicable
checkoff lists,
shall
be
prepared,
approved,
and
adhered
to for normal
startup,
operation
and
shutdown
of all
systems
and
components
involving nuclear safety of the facility.
Contrary to the
above,
this requirement
was
not met for the following two
examples:
a.
Operating
Instruction
OI-65,
Standby
Gas
Treatment
(SBGT)
System
Operation
did not
address
that
the
charcoal
bed
heaters
had to
be
manually reset after the
SBGT sy'tem
was
secured.
Although Licensee
Event
Report
259/85-29
implies this
was
not previously
known,
Final
Safety
Analysis
Report
Figure
5.3-9
note
six describes
the
manual
reset.
b.
On July 30,
1985, Surveillance Instruction
SI 4.7. B-l,
SBGT Operability
Test was being
used which did not contain
a change
dated July 7,
1985,
that
required
the
charcoal
bed
heaters
to
be
reset
after
system
shutdown.
A review of completed
SI 4.7.B-1 procedures
since
the change
was
implemented
found three
out of
10 did not contain
the
change.
Operations
personnel
are instructed
by Operations
Section
Instruction
Letter
to
compare
page-by-page
procedures
used
against
a
controlled copy of the procedure
to insure revisions
are incorporated.
This is
a Severity
Level
IV Violation (Supplement I) applicable to all three
units.
Pursuant
to
10
CFR %.201,
you are
required
to submit to this office within 30
days of the date of this Notice,
a written statement
or explanation
in reply,
including:
( 1) admission
or denial
of the alleged violations;
(2) the
reasons
for the violations if admitted;
(3) the corrective
steps
which
have
been
taken
and
the results, achieved;
(4) corrective
steps
which will be
taken
to avoid
further violations;
and (5) the date
when full compliance will be achieved.
8509i60139
850'W4
- DOCK 05000259'
Valley Authority
Browns Ferry 1, 2,
and
3
Docket Nos;
50-259,
260 and
296
2
License
Nos:
52,
and
68
Security
or
safeguards
information
should
be
submitted
as
an
enclosure
to
facilitate withholding it from public disclosure
as required
by
or 10 CFR 73.21.
I
SEP 0 4 1985