Forwards Summary of 840530 Meeting W/Tva,Alabama Power Co, Florida Power Corp,Florida Power & Light & Georgia Power Co Re Selected Emergency Preparedness Issues
ML18026B190
Person / Time
Site: Browns Ferry, Sequoyah, 05000000
Issue date: 06/08/1984
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
References
840608, NUDOCS 8408300402
Download: ML18026B190 (9)


Text

Official Record Copy

JUN 0 8 1984 Tennessee Yalley Authority ATTN:

Mr. H.

G. Parris

,Manager of Power and Engineering 500A Chestnut Street Tower II Chattanooga, TN 37401 Gentlemen:

SUBJECT:

MEETING ON EXERCISE SCENARIOS AND RELATED ISSUES This refers to the meeting conducted in the Region II Office on May 30, 1984.

The meeting related to Federal Field Exercise -experience, current regulatory requirements in the emergency planning area and scenario development issues.

The subjects discussed at this meeting are described in the enclosed Meeting Summary.

This meeting was beneficial and has provided for a better understanding of the areas discussed.

We appreciate the opportunity for this information exchange, and we hope such a dialogue will continue.

In accordance with Section 2.790 of NRC's "Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a

copy of this letter and enclosure will be placed. in the NRC' Public Document Room.

Should you have any questions concerning this matter, we will be pleased to discuss them.

Sincerely, James P. O'Reilly Regional Administrator

Enclosure:

Meeting Summary cc w/encl:

(see page 2) 8408300402 840608 PDR ADOCK 05000259 F

PDR

~J

, P g%>> f/,,W h

Tennessee Val 1 ey -Authority cc w/encl:

T.

G. Campbell, Watts Bar Nuclear Plant Site Director J.

W. Anderson, Manager Office, of guality Assurance H.

N. Culver, Chief Nuclear Safety Staff R.

M. Pierce, Watts Bar Nuclear Plant Project Manager D.

L. Williams, Jr.

Supervisor, Licensing Section R.

E. Teamer, Project Engineer G. Wadewitz Project Manager bcc w/encl:

Senior Resident Inspector Document Control Desk State of Tennessee ag Is~a RI JPS ohr 6Q/Se Lewi s 6/

/84

ENCLOSURE MEETING

SUMMARY

Licensee Attendees:

Alabama Power Company Florida Power Corporation Florida Power and Light Company Georgia Power Company Tennessee Valley Authority Other Attendees:

Institute of Nuclear Power Operations

SUBJECT:

EXERCISE SCENARIOS AND RELATED ISSUES On May 30, 1984, representatives from the above mentioned licensees, the Nuclear Regulatory Commission, and the Institute of Nuclear Power Operations met to discuss selected emergency preparedness issues.

The attendance list is attached as the Appendix to this summary.

The meeting was held at the request of the aforementioned licensees.

The meeting was opened by the NRC Region II Regional Administrator.

Mr. O'ei 1 ly discussed the NRC' commitment to emergency preparedness programs and discussed certain aspects of the Federal Field Exercise (FFE).

Potential changes in regulatory guidance resulting from experiences of the FFE were mentioned.

Mr. J.

P.

Stohr, Director, Division of Radiation Safety and Safeguards, NRC Region II, discussed the conduct of the
FFE, lessons
learned, and planned post FFE activities, particularly as they related to scenarios.

NRC emergency preparedness regulatory requirements and guidance were discussed.

The differences between the FEMA and NRC rule on exercise frequency were pointed out.

Emphasis was placed on timely submittal of exemption requests pertaining to the exemption of State and local agencies from annual participation in exercises.

(Guidance on exemption requests is provided in IE Notice 84-05.)

Mr.

R.

P.

MacDonald, Senior Vice-President, Alabama Power

Company, led the discussion on scenario development issues.

Clarification was provided on the meaning of small-scale versus full-scale exercises.

The advantages and di sadvantages of using simulators was discussed.

Problems encountered in developing a

somewhat realistic scenario while trying to provide a sufficient source term supporting full offsite agency participation were also discussed.

t

~

I

APPENDIX MEETING ATTENDEES Name Or anization Title J

P O'ei 1 1 J.

P ~ Stohr E. Jordan D.

M. Collins R.

E. Trojanowski W.

E.

Cl inc

'T.

R. Decker R.

P.

MacDonald K. McCracken K. Neuschafer H. Johnson J. DiLuzio W. Ollinger J.

Hufham E. Sliger B. Marks J.

Forsyth US NRC, RII US NRC, RII US NRC, IE, HQS US NRC, RII US NRC, RII US NRC, RII US NRC, RII Alabama Power Co.

Alabama Power Co.

Florida Power Corp.

Florida Power 8 Light Company Georgia Power Co.

Georgia Power Co.

Tennessee Valley Authority Tennessee Val 1 ey Authority Tennessee Valley Authority INPO Regional Administrator Division Director Division Director Branch Chief Director, Government Affairs Section Chief Emergency Preparedness Team Leader Senior Vice-President Supervisor, Reg.

Compliance Emergency Planning Coordinator Emergency Planning Supervisor Emergency Planning Coordinator Nuclear Engineer Chief Radiological and Emergency Planning Emergency Planning Supervisor Emergency Planner

Manager, Emergency Preparedness

I

~

A

~

~

Tennessee Valley Authority cc w/encl:

T.

G. Campbell, Watts Bar Nuclear Plant Site Director J.

W. Anderson, Manager Office of equality Assurance H.

N. Culver, Chief Nuclear Safety Staff R.

M. Pierce, Watts Bar Nuclear Plant Project Manager D. L. Williams, Jr.

Supervisor, Licensing Section R.

E. Teamer, Project Engineer G. Wadewitz Project Manager bcc w/encl:

Senior Resident Inspector Document Control Desk State of Tennessee RI ston 6/p /84 C

e 6/

/84 6/

/84 6Q /84 Lewi s 6/

/84

rr i

rig 1