Advises That ASME Code Cases N-234 & N-235 Have Been Approved for Use in Reactor Pressure Vessel Preservice Insp Program
ML18026A302
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 06/28/1980
From: Youngblood B
Office of Nuclear Reactor Regulation
To: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
References
NUDOCS 8007180339
Download: ML18026A302 (23)


Text

@g* gpss"g,',)(",i.t II-0 ISTR IBUTION:

JUH

~ ~ 1-80 Docket Hos.

SO-387 and Mr. Norman M. Curtis Vice President - Engineering 8 Construction Pennsylvania Power A Light Company, 2 North Ninth Street Allentown, Pennsylvania 18101

Dear i~fr. Curtis:

NRC PDR LPOR LDacket File LB~1 Rdg TERA DEisenhut RPurple BJYoungblood MRushbrook RHVollmer OFRoss RMattson JPKnfght'LTedesco'Noonan PCheck LRubenstein ASchwencer JMiller RStark SPawlicki QC,c

SUBJECT:

SUSgUEHANNA STEAM ELECTRIC STATION UNIT flOS. 152 -

REQUEST TO USE ASME CODE CASES In your 1etter to 0.

O. Parr, dated March 13, 1980, you oroposed to use ASME Code Cases H-234, "Time Between Ultrasonic Calibration Checks" and iN-235, "Ultrasonic Calibration Checks for Section V" in the reactor pressure vessel preservice fnspectfon program.

Code Cases H-234 and IH-235 were evaluated by the NRC staff and have been approved for use in the Susquehanna or service inspection program.

Sincerely, ccs:

See next page UI(iI=ii'-:~ "-i= jZD BY B

J Youngblood Chfef Licensing Branch No.

1 Division of Licensing OFFICE SURNAME DATE P 06/26/GO 06/ -=~

/00 OL:LBTl~(.

OL:LB1'.1 RStark:km MRushbrook-~

8JYounob 1 ood 06/ i /80 NRC FORM 3i8 (9 761 NRCM 0340

~ U.S. GOVERNMENT PRINTING OFFICE:.l979 389.369

r

Hr. Norman W. Curtis cc:

Mr. Earle M. Head Project Engineering Manager Pennsylvania Power

& Light Company 2 North Ninth Street Al 1 entown, Pennsyl vani a 18101 Jay Si lberg, Esq.

Shaw, Pittman, Potts Trowbridge 1800 M Street, N.

W.

Washington, 0.

C.

20036 Hr. William E. Barberich, Nuclear Licensing Group Supervisor Pennsylvania Power

& Light Company 2 North Ninth Street Al 1 entown, Pennsyl vani a 18101 Edward M. Nagel, Esquire General Counsel and Secretary Pennsylvania Power

& Light Company 2 North Ninth Street Al 1 entown, Pennsyl vani a 18101 Bryan Snapp, Esq.

Pennsyl vania Power

& Light Company 901 Hamilton Street Al 1 ento',

Pennsyl vani a 18101 Robert H.

Ga I 1 o Resident Inspector P, 0.

Box 52 Shickshinny, Pennsyl vani a 18655 Susquehanna Environmental Advocates clo Gerald Schultz, Esq.

500 South River Street Wilkes-Barre, PA 18702 John L. Anderson Oak Ridge National Laboratory Union Carbide Corporation Bldg. 3500, P. 0.

Box X

Oak Ridge,. Tennessee 37830 Mr. Robert J.

Shovl in Project Hanager Pennsylvania Power and Light Co, 2 North Ninth Street Al lentor, Pennsyl vania 18101 Hatias F. Travieso-Oiaz, Esq.

Shaw, Pittman, Potts Trowbridge 1800 H Street, N.

W, Washington,

0. C.

20036 Or. Judith H. Johnsrud Co-Oirector

,Environmental Coalition on Nuclear Power 433 Orlando Avenue State College, PA 16801 Hr. Thomas H. Gerusky, Oi rector Bureau of Radiation Protection Department of Environmental Resources Commonwealth of Pennsylvania P. 0.

Box 2063 Harrisburg, PA 17120 hs. Colleen Marsh Box 538A, RQ44 Mountain Top, PA 18707 Hrs. Irene Lemanowicz, Chairperson The Citizens Against Nuclear Oangers P. 0.

Box 377 R041

Berwick, PA 18503

(~ll /EQUI/

~4 0

Cy

~i Clo C

. Cy

/yi7 o~'p.

++*++

UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 June 26, 1980 g/N 9

~Is'

~ ~

TO ALL APPLICANTS FOR CONSTRUCTION. PERMITS AND OPERATING LICENSES

SUBJECT:

FURTHER COMMISSION GUIDANCE FOR POWER REACTOR OPERATING LICENSES On June 16, 1980, the Nuclear Regulatory'ommi,ssion issued its policy statement'egarding the requirements to be met for current operating license applications.

The requirements are derived from the NRC's Action Plan (NUREG-0660) and are found in NUREG-0694, "TMI-Related Requirements for New Operating Licenses".

They are deemed to be necessary and sufficient for responding to the TMI-2

accident, and current operating license applications should be measured against the NRC regulations as augmented by these requirements.

A copy of this policy statement is enclosed.

Copies of NUREG-0694 are being produced and wi 11 be provided to you under separate cover in the near future.

incerely,

Enclosure:

Policy Statement re G.

'senhu irect r Division of Licensing CC:

Service List

r 4ir l

Pk

r.

'L U

ST NUCLEAR REGULATORY COMMISSION

'J FURTHER COMMISSION GUIDANCE FOR POWER REACTOR OPERATING LICENSES STATEMENT OF"POLICY *"

ll pOC;: TED USNRr JUN 161980

~

Of;:ice of tire Secretary 8""~eii,"." G Service 8;en."h Q>

4 I.

BACKGROUND After the March 1979 accident at Three Mile Island, Unit 2, the Commission directed its technical review resources to assuring the safety of operating power reactors rather than to the issuance of new licenses.

Furthermore, the Commission.decided that power reactor.licensing should not continue. until the assessment of the TMI accident had been substantially completed and comprehensive improvements in both the operation and regulation of nuclear power plants had been set in motion.

At a meeting on May 30, 1979, the Nuclear Regulatory Commission decided to issue policy guidance addressing general principles j\\

for reaching licensing decisions and to provide specific guidance for near-term operating license cases.

In November

1979, the 1/

Nuclear Regulatory Commission issued the policy guidance in the 2/

form of an amendment to 10 CFR Part 2 of its regulations, describing the approach to be taken by the Commission regarding h

licensing of powei reactors.

In particular, the Commission noted that it would "be providing case-by-case guidance on changes in regulatory. policies."

The Commission has now acted on three operating licenses, has given extensive consideration to issues arising as a result of the Three Mile Island accident, and is able to provide general guidance.

  • All footnotes for this statement of policy appear. at end of text,

,fIl 2

t Following the accident at Three Mile Island 2, the President established a Commission to make recommendations regarding changes necessary to improve nuclear safety.

In May 1979, the I

Nuclear Regulatory Commission established a Lessons Learned Task Force", to determine what actions were required for new operatingt 4lic'en'ses and chartered a Special Inquiry Group to examine all facets of the accident and its causes.

These groups have'public.shh'd their.'eports.4/

r The Lessons Learned Task Force led to NUREG-0578, "TMI-2 Lessons Learned Task Force Status Report and Short-Term Recommendations" and NUREG-'0585, "TMI-2 Lessons Learned Task Force Final Report.,"

The Commission addressed these reports in meetings on September 6,

September 14, October 14, and October 16, 1979. 'ollowing C

rtrelease of the report of the Presidential, Commission, the Coqmission 4

provided a preliminary set of responses to the recommendations in E

I

'that report.

This response provided broad policy directions for development of an NRC Action Plan, work on which was begun in It November 1979.

During the development of the Action Plan, the r

4 Special Inquiry Group Report was received, which had the "benefit, 4

II of review by panels. of outside consultants representing a cross, section of technical and public views.

This "report provided I

F "additional recommendations.

-6/

'The Action Plan-was developed toI,prove.de a comprehensive and integrated plan for the actions judged appropriate by the Nuclear',4 f

, "t,

Regulatory Commission to correct or improve the regulation and operation of nuclear facilities based on the experience from the accident at TMI-2 and the official studies and investigations of the accident.

In developing the Action Plan, the various recom>>

mendations and.possible actions of all the principal investigations were assessed,and either rejected, adopted or modified.

A detailed summary of the development and,review process for the Action Plan is provided in NVREG-0694, "TMI-Related Requirements For New Operating Licenses."

Actions to improve the safety of nuclear power plants now operating were judged to be necessary immediately after the accident and could not be delayed until the Action Plan was developed, although k

they were subsequently included in the Action Plan.

Such actions came from the Bulletins and Orders issued immediately after the

accident, the first report of the Lessons-Learned Task Force issued in July 1979, the recommendations of the Emergency Preparedness Task Force, and the NRC staff and Commission.

Before these immediate actions were applied to operating plants, they were approved by the Commission.

Many of the required immediate actions have already been taken by 'censees and most are scheduled to be complete by the end of 1980.

On February 7,

1980, based on its review of initial drafts of the Action Plan, the Commission approved a listing of near-term operating license (NTOL) requirements, as being necessary but not necessarily sufficient TMI-related requirements, for granting new

operating licenses.'ince

then, the fuel load requiremen'ts on the NTOL list have ing licenses.,

with low power testing, been used by the Commission in granting operat-limited authorizations for fuel loading and

'f I

for Sequoyah,

Salem, and North Anna.

On May',15, 1980, a'fter review of the last version of the Action

/

Plan, the Commission approved a list of "Requir'ements For New II t,) ~

Op'erat'ing Licenses",

now contained in NUREG-0694, wh'ich 'thestaff r'ecommended for imposition on cuxrent opera't!ing license'-appl'i'cant's'.,

That list was recast from the previous

'NTOL list and s'e'ts forth'four type's of TMI-'rel'ated requirements and actions for n'w operat-ing licenses:

(1) those required to be completed by a license appl'icant 'prior to recezving a fuel-loading and low-powei testing

license, (2) those required, to be completed by a license'pplicant

,I to'pe'rate at appreciable power levels up to full power,

('3) those' the NRCil'1 take prior to issuing a fuel-loadin'g andow-power.

t'esti'ngor full-power 'operating

license, and (4) those requir'ed'o V

K be" completed by a licensee prior to "a specifi'ed date.

The Commissi'on'lso appr'ove'd'he staff's recommendation that the remaining items from the TMI 'r'eviews should be implemented or consi;dered'v'er timeo further'nhance s'a'fety.

In'. appro'ving. the', schedules for developing in requirements, the Commission's primary.

safe'ty significance of the issues and the I

an'd implementing changes' cons'iderations were the'mmediacy of the'eed

for corrective actions.

As discussed

above, many actions were taken to improve safety immediately or soon after the accident.

These actions were generally considered to be interim improvements.

In scheduling the remaining improvements, the -availability of both NRC and industry -resources was considered, as well as the safety, sig-nificance of the actions.

Thus, the Action Plan approved by the Commission presents a sequence of actions that will result in a gradually increasing. improvement in safety as individual actions are completed and the initial immediate actions are replaced or supplemented by longer term improvements.

1 II.

COMMISSION DECISION Based upon its extensive review and consideration of the issues arising as a result of the Three Mile Island accident, the Com>>

mission has concluded that the above-mentioned list of TMI-related requirements for new operating licenses found"in NUREG-0694 is necessary and sufficient for responding to the TMI-2 accident.

The Commission has decided that current operating license appli-cations should be measured against the regulations, as augmented by these requirements.

In general, the remaining items of the s/

P t

Action Plan should be addressed through the normal process for development and adoption of new requirements rather than through immediate imposition on pending applications.

IXI.,LITIGATIONOF TMI-2 ISSUES XN (OPERATING LICENSE PROCEEDINGS In the November 1979 policy statement, the Commission provided th' follpwing guidance for the conduct of adjudicatory proceedings:

Xn reaching their decisions, the Boards should interpret existing regulations and regulatory policies with due

~'consideration to the implications for those regulations

,and policies of the Three Mile Island Accident.

In this

<<regard, it should be understood that as a result, of analyses still underway, the Commission may change its present regulations and regulatory policies in important aspects and thus compliance with existing regulations may turn out to no longer warrant, approval of a license, application.

The Commission is now able to give the Boards more guidance.

The Commissk.on believes the TMI-related operating license require-ments list as derived from the process described above must b'e the principal basis for consideration of TMI'related issues in the adjudicatory process.

There are several reasons for this.

First,

.this represents

'a major effort by the staff and Commissioners to address an almost overwhelming number of issues in a coherent and coordinated fashion.

Xt is extremely doubtful this process can be reproduced in k.ndividual proceedings.

Second, the NRC does not have the resources to litigate the entire Action Plan in each proceeding, nor does it believe it would be a responsible decision to do so.

Third, many of the decisions involve policy rather than factual or legal decisk.ons.

Most of these are more appropriately

addressed by the Commission itself on a generic basis than by an individual licensing board in a particular case.

Consequently, the Commission has chosen to adopt the following policy regarding litigation of TNI-related issues in operating license proceedings.

The TMI-related "Requirements For New Operating Licenses" adopted herein can, in terms of their relationship to existing Commission regulations, be put in two categories:

(l) those that interpret, refine or quantify the general language of existing regulations, and (2) those that supplement the existing regulations by imposing requirements inaddition to specific ones already contained therein.

Insofar as the first category -- refinement of existing regulations is concerned, the parties may challenge the new requirements as unnecessary on the one hand or insufficient on the other.

The Atomic Safety and Licensing and Appeal Boards'resent authority to raise issues sua

~s onte under 10 CFR 2.760a extends to this first, category.

Insofar as the second category -- supplementation of existing regulations, is concerned, boards are to apply the new require-ments unless they are challenged, but they may be litigated only to a limited extent.

Specifically, the boards may entertain con-tentions asserting that the supplementation is. unnecessary (in full or in part) and they may entertain contentions that one or more of the supplementary requirements are not being complied

withi they. may not entertain contentions asserting thai. additional supplementation is required.

The boards'uthority to raise'issues'ua

~sonte shall he suhject to the same limitations.

Past adjudi-catory decisions of the Commission have been clear that generally finding of compliance with the regulations entitles one to the requested permit or license insofar as the requirements of the Atomic Energy Act are concerned.

Accordingly, absent some 9/

special showing,no party has in the past been entitled to 10/

litigate matters going beyond NRC regulations before boards;.

The Commission guidance on litigation of this second'ategory of requirements will thus serve to expand the scope of permissible contentions to include issues as to the necessity for or compliance with certain TMI-related requirements that are supplementary to existing regulations.

In order to focus litigation of TMI-.related issues, the Commission i

instructs its staff to utilize, to the maximum extent practicable, the, Commi..sion',s, existing summary disposition procedures in respond-ing. to TMI-related contentions.

The Commission believes that where the time for filing contentions has expired in,a given case, no new TMI-related contentions should be accepted absent a showing of good cause and balancing of the factors in 10 CFR 2.714(a) (1).

The Commission expects strict adherence to its regulations in this regard.

Also, present standards governing the reopening of hearing:records to consider new evidence on TMI-related issues should be strictly adhered to.

Thus, for example, where initial decisions have been

issued, the record should not be reopened to take evidence on. some TMI-related issue unless the party seeking reopening shows that there is significant new evidence, not included in the record, that materially affects the decision.

Separate and dissenting views of Commissioners Gilinsky and Bradford are attached.*

amue Secretary o

he Commission Dated at Washington, D.C.

the 16th day of June, 1980.

Section 201 of the Energy Reorganization

Act, 42 U.S.C.

g 5841 provides that action of the Commission, shall be determined by a "majority vote of the members present."

Commissioner Bradford was not present at this Affirmation

session, but had previously indicated his.intention to dissent.

Had Commissioner Bradford been present at the meeting he would have dissented.

Accordingly, the formal vote of the Commission was 3-1 in favor of the decision.

FOOTNOTES 1/

"Staff Requirements Discussion of Options Regarding Deferral of Licenses,"

memorandum from Samuel J. Chilk, Secretary to Lee V. Gossick, Executive Director for Operations, May 31, 1979.

2/

"Suspension of 10 CFR 2.764 and Statement of Policy on Conduct of Adjudicatory Proceedings,"

44 FR 65050 (November 9, 1979).

3/

"Lessons Learned from TMI-2 Accident," Roger Mattson to NRR

staff, May 31, 1979.

4/

Report of the President's Commission on The Accident at Three Mile Island, "The Need for Change:

The Legacy of TMI,"

October 1979; U.S. Nuclear Regulatory Commission, "TMI-2 Lessons Learned Task Force Status Report and Short-Term Recommendations,"

NUREG-0578, July 1979; U.S. Nuclear Regulatory Commission, "TMI-2 Lessons Learned Task Force Status Report,"

NUREG-0585, August 1979; U.S. Nuclear Regulatory Commission Special Inquiry Group, "Three Mile Island:

A Report to the Commissioners and to the Public," January 1980.

5/

U.S. Nuclear Regulatory Commission, "NRC Views and Analysis of the Recommendations of the President's Commission on the Accident at Three Mile Island,"

NUREG-.0632, November 1979.

6/

U.S. Nuclear Regulatory Commission, "NRC Action.

Plans Developed as a Result of the TMI-2 Accident," NUREG-0660.

7/

U.S. Nuclear Regulatory Commission, "TMI-Related Requirements for New Operating Licenses,"

NUREG-0694, June 1980.

8/

Consideration of applications for an operating license should include the entire list of requirements unless an applicant specifically requests an operating license with limited authorization (e.g., fuel loading and low-power testing).

9/

Maine Yankee Atomic Power Com an (Maine Yankee Nuclear Power Plant, Unit 2), ALAB-161, 6

AEC 1003 (1973), affirmedg CLI-74-2, 7

AEC 2 (1974), a.firmed, Citizens for Safe Power v.

HRC, 524 F.2d 1291 (D.C. Cir. 1975).

10/

See 10 CFR 5 2.758.

L i

I'

COMMISSIONER GILINSKY'S SEPARATE VIEWS REGARDING.THE COMMISSION'S POLICY STATEMENT COMMISSION GUIDANCE FOR POWER REACTOR OPERATING LICENSES I regard the Action Plan as a directive to the staff from the Commission acting in its supervisory capacity and expect that it will be given appropriate deference by the adjudicatory boards.

However, in view of the fact that the Action Plan and the NTOL list are not regulations, and are not the result of a public proceeding, they cannot be given the weight of rules.

Nor does the fact that the Commission spent a great deal of time developing the Action Plan change the situation.

There were many items to deal with and the Commission did not spend much time on each of them and very littl'e on some.

Moreover, as Commissioner Bradford has pointed out, the industry has had extensive opportunities to comment on the Action Plan and to obtain changes, which in almost all cases have resulted in a reduction of the requirements initially proposed by the staff.

To now limit litigation to the issues of whether these requirements have been satisfied or are excessive, and to exclude discussion of whether they go far enough, is a manifestly unfair and unwise policy.

DISSENTING VIEWS OF COMMISSIONER BRADFORD To curtail the rights of parties involved in NRC adjudicatory proceedings through the device of a policy statement is, if it is legal at all, a radical act requiring (one would have thought) urgent justification.

The justifications advanced in this case amount to no more than a bored yawn toward the concerned public.

Specifically, they are:

l)

We have worked very hard,'and what we have done is too complicated to defend; 2)

We are too busy to listen to you, and despite our

$ 400 million annual

budget, we can' afford to hear you; and 3)

Because the plan involves "policy".

l/

common to all cases rather than to a specif ic number of them, the public should not be heard on it at.all.

There are four reasons why the Commission should not be taking this action, even assuming that it has the power to do so.

First, the action embodies precisely the complacency that the Kemeny Commission,, among others, suggested as a strong contributing factor to the accident at Three Mile Island.

Rather than strengthening

.the role of the public in NRC proceedings as advocated by both the Kemeny Commission and the NRC's own Special Inquiry Group Report, this action lessens the public's l/

The statement that the Commission would have "to litigate the entire Action Plan in each proceeding (policy statement, page 6)" is of course false, and it reveals just how little'he Commission understands its own proceedings.

The entire Action Plan is not at issue here - only those items not within the reach of current regulations.

Furthermore, it is inconceivable that each of those items (or even most of them) would be litigated in every proceeding.

If abilit!y to comment on the adequacy of many of the technical qespon'ses to Three Mile Island.

This attitude that the regulatory~

agency, and the industry between them know best ignores a'series of failures in the AEC/NRC licensing history of which Three Mile Island was only the most dramatic example.

It is noteworthy that

~

the staff, which did most of,, the work on which the Commission now I

relies, did not recommend such a policy'tatement.

It, appears that t!hey-may briefly have learned, more than the Commi>>ssion.

I

Second, the action is clearly unfair.

One set of prospective litigpnts - the industry has been extensively involved in the development of the Action Plan.

An industry panel met with the>>

Commission, and the industry has been in constant contact with I

4 the staff and in the providing of written comments throughout the process.

The plan has never'been put out for public comment, and little or no public comment has taken place.

However, as a result of the Commission's actions,'the only group that will be permitted Ito contest the questions at issue here will'e the indust'ry.
Thus, those who have had the" greatest say in shaping the Action Plan. will now be able to challenge 'its requirements
further, while those who, have had no say in shaping it will be foreclosed from challenging the very requirements that they have h'ad no opportunity to comment on.

Third, this action is unnecessary.

For one thing, legitimate processes exist through rulemaking for the Commission-to develop a document of general applicability.

I would not have recommended

~

~

3 it in this case, but such a process would at least have cured the worst of the defects in the Commission action.

Furthermoreg even without a rulemaking, the Action Plan could have been used to shape the staff position in NRC hearings.

As a practical matter, this would have made it a document of considerable influence.'n uncontested cases, it would clearly have governed.

Intervenors in contested cases would have been taking on a very heavy burden in trying to go against a staff position and convince the Commission to change its mind on a document that it had already approved.

However, they would have least had had a

chance to prepare a record and to make the attempt.

Fourth,.the Commission's action does not lend the desired certainty to the process.

For one thing, it is certainly subject to challenge pursuant to Pacific Gas and Electric Com an v.

Federal Power Commission, 506 F.2d 33 (D.C. Cir., 1974).

Should such a challenge prevail, the Commission will have lost far more time than it can possibly be saving through the measures taken here.

For another thing, it makes no sense for the Commission to take this action on the eve of the advent of a

new Chairman, whose appointment is part of the President's response to Three Nile Island.

In order that no party rely unduly on the policy statement at this time, I am hereby giving notice that I intend to seek its reconsideration and revocation upon the arrival of the President's new appointee.

It may of course be that no change will occur f but at least the new appointee will e

a vital policy which he or she must have had a voice in choosing preside over and defend.

UNITED STATES NUCLEAR REOULATORY COMMISSION WASNINOTON, O.C.

SOSSS A

I OFFICIAL SOSINSSS POSTAOE SI FEES PAID U.S. NocNN RASMIAIOIyComwNoon U.A.MAIL