po TIME RAN R ARON A T DATE D/G . START LOADED UNLOAD I.OADED UNI.OAD SCH 12-26-79 10 MIN 12-18-79 10 MIN 12-11-79 D 10 MIN 7-25-78 3D . 10.MIN X 5-30-78 3D 10 MIN X 5-23-78 X 10'IN 4-18-78 3B 10 MIN X 3-14-78 3A X 10 MIN X 2-28-78 3C 10 MIN 2-21-78 3B 10 MIN gl-23-78 3B X 10 MXN 1-17-78 3A 10 MXN X 1-4-78 3C X 10 MIN 8-1-78 3A 10 MIN 10-24-78 3A 10 MIN 10-10-'78 3C 10 MIN 9-27-78 3A 10 MIN X 11-27-'79 10 MIN X 11-20-79 A 10 MIN 11-14-79 10 MIN 11-13-79 10 MIN X'0 10-16-79 10 MXN 10-2-79 10 MIN X 8-27-79 A 10 MIN X 8-22-79 10 MIN 8-1-79 10 MIN X 9-25-79 10 MIN 9-18-79 10 MIN X
.9-10-79 10 MXN 9-5-79 MIN. X 11-28-78 3B 10 'MIN 11-14-78 3D 10 MIN 12-12-78 3D 10 MIN 1-23-78 10 MIN X 1-17-78 A 10 MIN X
'12-21-78 10 MIN X
ENCLOSURE 1 MAINTENANCE RECORD OF DIESEL GENERATOR RUNS AT BROWNS FERRY NUCLEAR PLANT
pa 0% TIME DATE D/G START LOADED UNLOAD LOADED UNLOAD SCH 78 10 MIN 2-8-78 X 10 HIN 3-28-78 10 MIN 10 MIN 3-7-78 10 HIN 4-12-78 10 MIN 4-4-78 10 MIN 10 MIN 5-30-78'<<6-78 10 MIN 7-18-78 10 MIN
.8-29-78 A 10 MIN 8>>7-78 10 MIN 8-1-78 10 MIN 9-26-78 10 MIN X.
9<<19-78 10 MIN 9-19-'78 10 MIN X 9-5>>78 10 MIN X 10-31-78 10 MIN X F 10-24-78 A 10 MIN X 10 MIN 11<<28-78 10 MIN
- 8 X 10 MIN X 2-26-78 X 10 MIN 2-12-78 10 MIN X 8-29-79 3A 10 MIN 8-14-,79 3C 10 MIN 8-1-79 3A 10 MIN X 9-4-79 3B 10 MIN 10-30-.79 3B 10 HIN X 10-16-79 3D 10 MIN 10-2-79 3B 10 HIN 1-30-79 10 MIN 1-30-79 3C 10 MIN 2-27-79 10 MIN'0
'X 2-20-79 MIN
I 5
~ ~
5-i o)
MMI 6 00 0 ht TIME RAN DATE D/G START LOADED UNLOAD LOADED UNLOAD SCH 3-29-79 10 MIN 3-20-79 10 MIN 3-5-79 X 10 MIN X 4-24-7 10 MIN X 4-18-79 10 MIN 4-3-79 10 MIN 5-22-79 10 MIN 5-15-79 10 MIN 5-9-79 A 10 MIN 6-26-79 10 MIN 6-19-79 10 MIN 6-5-79 A 10 MIN 7-17-79 10 MIN 7-25-79 10 MIN 7-10-79 10 MIN X 7-5-79 10 MIN 9-30-80 10 MIN 9-30-80 10 MIN 25-80 10 MIN 9-17-80 10 MIN 9-10-80 10 MIN 10-30-80 C 10 MIN X 10-28-80 B 10 MIN 10-22-80 10 MIN 11-25-80 10 MIN 11-18-80 10 MIN 11-11-80 D 10 MIN 12-28-80 10 MIN 12-16-80 10 MIN 12-14-80 10 MIN 12-9-80 10 MIN 12-2-80 10 MIN X 12-1-80 10 MIN 1-28-79 3B 10 MIN 12-12-78 3D 10 MIN 2<<27-'79 3C 10 MIN
MMI 6 pe TIME RAN DATE D/G START LOADF.D UNLOAD LOADF.D UNLOAD SCH 2-20-79 3B X 10 MIN X 2-5-79 3D 10 MIN 3-20-79 3B 10 MIN X 3-13-79 3A 10 MIN X 4-11-79 3A 10 MIN 4-3-79 3D 10 MIN X 5-22-79 3C 10 MIN X 5-16-79 3B 10 MIN 6-19-79 3C 10 MIN X 7-11-79 3D 10 MIN 7-10-79 3B 10 MIN 7-5-79 3A 10 MIN 1-22-80 3B 10 MIN 1-15-'80 3A 10 MIN 80 3D 10 MIN X 1-2-80 3C 10 MIN 2-27-80 3C 10 MIN 2-20-80 3B 10 MIN 2-5-80 3D 10 MIN 2-1>>80 3B 10 MIN 3-11-80 3A 10 MIN X 4-27-80 3D X 10 MIN 4-16-80 3B 10 MIN 4-9-80 3A 10 MIN 5-27-80 3D 10 MIN X 5-13-80 3B 10 MIN 5-7-80 3A 10, MIN 6-18-80 3D 10 MIN X 6-17-80 3C 10 MIN 6-10"80 3D 10 MIN 7-29-80 3A X 10 MIN 7-23-80 3D X 10 MIN 9-18-79 X 10 MIN X 9-10-79 10 MIN 10 MIN 9-5>>79'1-3.4-79 10 MIN
~
)
MMI 6 pe TTME RAN REASON T 7 DATE D/G START LOADED UNLOAD LOADED UNLOAD SCH 11-13-79 10 MIN 10-16-79 10 MIN 10-2-79 10 MIN 10 MIN 11-27<<79 10 MIN 11-20-79 A 10 MIN 12-26-79 10 MIN X 12-18-79 A 10 MIN 12-11-79 10 MIN 1-30-80 10 MIN 1-22-80 10 MIN 1-15-80 . A 10 MIN 2-27-80 10 MIN 2-20-80 10 MIN 2-12<<.80 10 MIN 2-5-80 10 MIN X 2-1-80 10 MIN 3-25-80 10 MIN 3-11-80 10 MIN 4-29-80 10 MIN 4-23-80 10 MIN 4-16-80 10 MIN 4-8-80 10 MIN 5-27-80 10 MIN 5-20-80 10 MIN 5-6-80 10 MIN 6-17-80 10 MIN 6-10-,80 10 MIN 7-29-80 10 MIN 7-23-80 10 MIN 7-15-80 10 MIN 7-1-80 10 MIN X 8-26-80 A 10 MIN 8-21>>80 10 MIN 8-13-80 10 MIN X
~ ~,
8'-6'-80. 10 MIN
0". T1ME RAN R ASOV DATE D/G START LOADED UNLOAD LOADED UNLOAD SCH 3-30-77 X 10 MIN 3-3-77 X 10 MIN 3-7-77 X 10 MXN 4-4-7 10 MXN X 4-5-77 10 MIN X 5-31-77 X 10 MIN X 5-24-77 10 MIN 5-10-77 A 10 MIN 5-3-77 10 MIN 5-3-77 10 MXN X 6-31<<77 10 MIN 6-28-'7 10 MIN X 7-10-77 X 10 MIN X 7-7-77 X 10 MXN 8-30-,77 10 MIN 8<<7-77 10 MXN 9-27-77 X 10 MIN 9-10<<77 10 MIN X 9-6-77 10 MXN 10-25-77 A 10 MIN X 10-10-77 10 MIN 10-4-77 10 MIN 11-28-77 10 MXN 12-27-77 10 MXN X 12-19-77 A 10 MIN X 12-6-77 10 MIN 2-1-76 3D 10 MXN 1-2-76 3D 10 MIN X 7-14-76 3B 10 MIN 8-31-76 3A 10 MIN X 9-28-76 3A 10 MIN 9-20-76 3D 10 MIN 9-13>>76 3C 10 MIN 9-5-76 3B 10 MIN 10-4-76 3B 10 MIN 11-23>>76 3A 10 MIN
TIME RAN DATE D/G START LOADL'D UNLOAD LOAI)ED UNLOAD SCU 11-2-76 3B 10 MIN 12-7-76 3C 10 MIN 1-20-76 10 MIN X 6 10 MIN X 3-21-76 X 10 MIN X 3<<5-76 D 10 MIN 3-2-76 X 10 MIN X 5-19-76 X 10 MIN 5-3-76 10 MIN X 5-5-76 10 MIN 5<<5-76 10 MIN 6-27-76 10 MIN 6-15-76 10 MIN 6-'7-76 A 10 MIN 7-7-76 10 MIN 8-30-76 10 MIN 8-24-76 3D 10 MIN X X 10 MIN 10 MIN 10 MIN 76 10 MIN X 10 MIN X 10 MIN X X 10 MIN 10 MIN X 11-16-76 10 MIN X 11-2-76 10 HIN 12-21-76 A 10 MIN X 12-14-76 10 HIN 12-7-76 10 HIN
TTME RAil R SON DATE D/G START LOADED UNLOAD I.OADI'.D UNI.OAD SCH 80 3A 2 HR 15 MIN X 3B 2 HR 15 MIN 3C X 2 HR 15 MIN 2 HR 15 MIN 80 3A X 2 HR 15 MIN X 3B 2 HR 15 MIN 3C X 2 HR 15 MIN 3D X 2 HR 15 MIN 9-26-79 3A 2 HR 15 MIN 3B X 2 HR 15 MIN X 3C 2 HR 15 MIN 3D 2 HR 15 MIN X 3-29-79 3A 2 HR 15 MIN 3B 2 HR 15 MIN 3C 2 HR 15 MIN 3D 2 HR 15 MIN 9-24-78 3A 1 HR 15 MIN 3B 1 HR 15 MIN 3C X 1 HR 15 MIN 3D 1 HR 15 MIN 3-24=78 3A 1 HR 15 MIN 3B 1 HR 15 MIN 3C 1 HR 15 MIN 3D 1 HR 15 MIN 3-29-77 3A X 1 HR 15 MIN 3B 1 HR 15 MIN X 3C 1 HR 15 MIN 3D 1 HR 15 MIN X 10-8-77 3A 1 HR 15 MIN 3B 1 HR 15 MIN 3C 1 HR 15 MIN X 3D 1 HR 15 MIN 6-15-76 3A 1 HR 15 MIN 3B 1 HR 15 MIN 3C 1 HR 15 MIN X 3D 1 HR 15 MIN X
>t SI 4'9.A.4.B TIME RhN DATE D/G START LOADED UNLOAD LOADED UNLOAD SCH 9<<30-.76 3A 1 HR 15 MIN 3B 1 HR 15 MIN 3C 1 HR 15 MIN 3D 1 HR 15 MIN 3-28-80 2 HR 15 MIN 2 HR 15 MIN 2 HR 15 MIN 15 MIN 11<<21-80 2 HR 15 MIN 2 HR 15 MIN X 2 HR 15 MIN 10-.3-79 2 HR 15 MIN 2 HR 15 MIN 2 HR 15 MIN 2 HR 15 MIN 3>>28-79 A 2 HR 15 MIN 2 HR 15 MIN 2 HR 15 MIN 4-4-78 1 HR 15 MIN 1 HR 15 MIN 1 HR 15 MIN X 1 HR 15 MIN 10-5-78 1 HR 15 MIN 1 HR 15 MIN X X 1 HR 15 MIN 1 HR 15 MIN 10-12-77 1 HR 15 MIN 1 HR 15 MIN X X 1 HR 15 MIN X 1 HR 15 MIN 4-1-77 ~
1 HR 15 MIN 1 HR 15 MIN X 1 HR 15 MIN 1 HR 15 MIN
po TIME RAN RAONSR DATE D/G START LOADED UNLOAD LOADED UNLOAD scn 2- 6 X 1 HR 15 MIN X B 1 HR 15 MIN 1 HR 15 MIN 1 HR 15 MIN 6 1 HR 15 MIN X B 15 MIN C 1 HR 15 MIN 1 HR 15 MIN X
1 i ~ eg EMI 3 po O TIME RAN I'NLOAD DATE D/G START LOADED LOADED UNLOAD SCH 1-6-76 X 15 MIN B 1 HR 15 MIN 1 HR 15 "MIN B X 1 HR 15 MIN X 3A 1 HR 15 MIN X 3B 1 HR 15 MIN 3C 1 HR 15 MIN 3D 1 HR 15 MIN X 11-1-78 1 HR 15 MIN B 1 HR 15 MIN 15 MIN 1 HR 15 MIN 3A 1 HR 15 MIN 3B 1 HR 15 MIN 3C 1 HR 15 MIN X 3D 1 HR 15 MIN X 7-19-79 1 HR 15 MIN 1 HR 15 MIN 1 HR 15 MIN 1 HR 15 MIN X 3A 1 HR 15 MIN X 3B 1 HR 15 MIN X 3C 1 HR 15 MIN 3D 1 HR 15 MIN
SI TIME RAN DATE D/G START LOADED UNLOAD LOADED UNLOAD SCH 4-24-78 3C X 4-18-78 38 25 MI 4-11-78 3A X 5-23-78 3C 5-30-78 3D X 5-16-78 38 25 M 5-9-78 3A X 5-3-78 3D X 25 MIN
'6-20-78 3C 6-13-78 38 X 6-6-78 3A 8-29-78 25 MIN 8-23-78 25 MIN 8-15-.78 25 MIN 8-7-78 B 25 MIN X 9<<26-78 A 25 MIN 9-19-78 25 MIN 9-12-,78 25 MIN X 9-5-.78 8 25 MIN X 1-2<<80 25 MIN 1-8-80 25 MIN 1-15-80 25 MIN 1-22-80 25 MIN X 1-30-80 25 MIN 2-5-80 25 MIN 2-12-80 25 MIN X 2-20-80 25 MIN 2-27-80 C 25 MIN X 3-4-80 25 MIN 3-11-80 25 MIN X 3-19-80 8 25 MIN 3-25-80 25 MIN X 4-1-80 25 MIN 4-8-80 25 MIN 4-16-,80 25 MIN
SI 4.9.A.1.A TIME RAN R.A ON S AR DATE D/G START LOADED UNLOAD LOADED UNLOAD SCH 4-21-80 25 HIN 4-29-80 D 25 MIN
..5-.6-80 A 25 HIN X 5-14-80 X 25 MIN X 5-20-80 25 HIN X 5-27-80 25 MIN 6-3-80 25 MIN X 6-10-80 25 MIN 6-17-80 25 MIN 9-30-80 3B X 25 MIN 9-24-80 3A 25 MIN X 9-16-80 3D X 25 MIN 9-9-'80 3C 25 MIN X 6-25,-80 25 MIN 7-29>>80 X 25 MIN 7-23-80 25 MIN X 7-15-80 25 MIN 7-9-80 X 25 MIN 7-1-80 25 MIN 8-6-80 B X 25 MIN 8<<26-80 25 MIN 8-21-80 25 MIN 8-12-80 25 MIN 1-30-80 3C X 25 MIN 1-22-80 3B X 25 MIN 1-15-80 3A 25 HIN 1-8-80 2S MIN 2-27-80 3C 25 MIN 2-20-80 3B X 25 MIN 2-15-80 3A X 25 MIN 2-5-80 3D 25 HIN 3-27-80 3A X 25 MIN 3-26-80 3C 25 HIN 3-19-80 3B 25 MIN 3-11-80 3A 25 MIN 3-4-80 3D 25 HIN
SI A A TIME R OV ST R DATE D/G START LOADED UNLOAD LOADED UNLOAD SCH 4-29-80 3D X 3C 25 MIN 6-23-80'-16-80 3B 25 MIN X 4-1 80 3D 25 MIN 4-29-80 3A X 25 MIN 5-27-80 3D X 25 MIN 5-20<<80 3C X 25 MIN 5-13-80 3B 25 MIN X 5-7-80 3A 25 MIN 6-10-80 3B 25 MIN X 6-3-80 3A X 25 MIN 6-'3-80 3C 25 MIN 6-25-80 3D 25 MIN 6>>18-80 3D 25 MIN 6-17-80 3C 25 MIN
'B 10>>2-79 25 MIN 10-9-79 3C 25 MIN 10-16-79 3D 25 MIN 10-23-79 3A 25 MIN 9-4-79 3B 25 MIN 9-10-79 3C X 25 MIN 9-19-79 3D X 25 MIN 9-26>>79 3A 25'MIN 8-1>>79 3A 25 MIN 8-7<<79 3B 25 MIN 8-'14-79 3C -X 25 MIN 8-21-79 3D 25 MIN 8-29-79 3A 25 MIN 7-3-79 3A 25 MIN 7-10-79 3B 25 MIN 7-11-79 3D 25 MIN 7-19-79 3C 25 MIN X 7-25-79 3D 25 MIN X 6-5-'79 3A 25 MIN X 6-12-79 3B 25 MIN
SI 4.9.A.l.A TIME RAN RF 03 DATE D/G START LOADED UNLOAD LOADED UNLOAD SCH 6-14-79 3C 25 MIN 6-19-79 3C 25 MXN X 6-26-79 X 25 MIN X 6-26-79 25 MIN 6-19-79 25 MIN 6-12-79 25 HIN X 6-5-79 X 25 MIN 7-25-79 25 MIN X 7-17-79 25 MIN 7-10-79 B 25 MIN X 7-3-79 X 25 MIN 8-29-79 25 MIN X 8-22-79 25 MIN 8-14-79 25 HIN 8-7-79 25 MIN 8-1-79 A 25 MIN X 9-25-79 X 25 MIN 9-18-79 25 HIN 9-10-79 C 25 MIN 9-4-79 B 25 MIN X 10-30-79 25 MIN 10-23-79 25 HXN X 10-16-79 D 25 MIN 10-13-79 B 25 MIN 10>>10-79 A 25 MIN 11-21-79 D 25 MXN 11-20-79 25 MIN X 11-14-79 25 MIN 11-13-79 X 25 MXN 11<<6-79 . X 25 HXN 12-26-79 B 25 MIN 12-18-79 25 MIN 12-11-79 25 MIN 12-4-79 25 HIN 11-21-79 3C 25 MIN 11-21-79 3A 25 MXN
SI 4.9.A. 1.A TIME RAN RE 0 S ART DATE D/G START LOADED UNLOAD LOADED UNLOAD . SCH 11-13-79 3D 25 MIN 11-6-79 3C 25 MIN 11-27-79 X 25 MIN 11-27-79 3B X 25 MIN X 12-26-79 3B 25 MIN 1'2-18-79 3A 25 MIN 12-12<<79 3D 25 MIN 12-5-79 3C X 25 MIN 1-30-78 3C 25 MIN X 1-23-78 3B 25 MIN X 1-17-78 3A 25 MIN 1-13-78 3B 25 MIN 2-7-78 3D X 25 MIN X 2-27-78 3C 25 MIN X 2-21-78 3B 25 MIN 2-14-78 3A X 25 MIN 3-27-78 3C 25 MIN
,3-21-78 3B 25 MIN 3-14-.78 3A 25 MIN 3-8-78 3D 25 MIN X 1-3-79 25 MIN 1-23-79 25 MIN 1-16-79 X 25 MIN X 1-11-79 D 25 MIN 2-13-.79 A 25 MIN 2-6-79 D 25 MIN 2-20-79 25 MIN 2-27-79 25 MIN 3-5>>79 25 MIN
,3-28-79 25 MIN X 3-20-79 B 25 MIN 3-13-79 25 MIN X 5-30-79 25 MIN X 5-22-79 X 25 MIN X 5-15-79 B 25 MIN X 5-9-79 A 25 MIN
SI 4.9.A.1.A TIME RAN R.ASON S RT DATE D/G START LOADED UNLOAD LOADED UNLOAD SCH UXR 5-2-79 X 25 MIN .X 4-24-79 25 MIN 4-17-79 B 25 MIN 4-11-79 A 25 MIN 4-3-79 25 MIN 10-3-78 B 25 MIN X 10-10-78 25 MIN X 10-17-78 25 MIN X 10-31-78 B 25 MIN 10-24-78 A 25 MIN X 10-18-78 A X 2S MIN 10-20-78 B 2S MIN 11-28-78 B 25 MIN 11-21-78 25 MIN 11-16-78 D 25 MIN 11"9-78 25 MIN 12-12-78 25 MIN X 12-19-78 2S HIN 12-26-78 25 MIN 1-10-78 25 MIN X 1-4<<78 C 25 MIN 1-17-78 A 25 MIN X 1-30-78 25 MIN 1-23-78 25 MIN 2-27-78 25 HIN X 2-21-78 B 25 HIN 2-14-78 A 25 MIN 2-7-78 25 MIN 3-28-78 C 25 MIN 3-20-78 B 25 MIN 3-14-78 25 MIN 3-7-78 25 HIN X 5-2-.78 25 MIN 4-25-78 25 MIN X 4-18-78 B 25 MIN X 4-12-78 A 25 MIN
SI A TIME RAN R ONS R DATE D/G START LOADED UNLOAD LOADED UNLOAD SCH 4-4-78 D 5-30-78 X ~
5-23-; 78 X 5-16>> 8
'5-9-78 X 6-27-78 6-20 78 6-14-78 6-6-78 A X 7-25-78 X 7-18-78 X 7-11-78 25 MIN X 7-4-78 25 MIN X 6-27-78 3D 25 MIN 7-25 78 3D 25 MIN 7-18-78 3C 25 MIN 7-11'-.78 3D 25 MIN 7-4"78 3A 25 MIN 8-29.-78 3A 25 MIN 8-23-78 3D 25 MIN 8-17-78 3C 25 MIN X 8-7-78 3B 25 MIN 8-1<<78 3A 25 MIN
~ 9-27-78 3A 25 MIN 9-19-78 3D 25 MIN 9-12-78 3C X 25 MIN X 9-5-78 3B 25 MIN 10-24-78 3A 25 MIN X 10-17-78 3D 25 MIN 10<<10-78 25 MIN 10-3-78 3B 25 MIN '
1-30-79 X 25 MIN 1-23-79 3B 25 MIN 1-16-79 3A 25 MIN X 1-12-, 79 3B 25 MIN X 2-27-79 3C 25 MIN
.A TIME DATE D/G START ADED UNLOAD LOADED UNLOAD SCH
- 0- 9 3B X 25 MIN 2-13-79 3A ' 25 MIN 2-6-79 3D 25 MIN 3-27-79 3C 25 MIN 3-20-79 3B X 25 MIN 3-13-79 3A 25 MIN 3-5-79 3D 25 MIN 4-25-79 3C 25 MIN 4-17-79 3B 25 MIN 4-11-79 3A 25 MIN 4-3-79 3D 25 MIN 5-30-79 3D 25 MIN 5-22-79 3C X 25 MIN 5-16-79 3B 25 MIN X 5-2-'79 3D X' 25 MIN 5-8-79 3A 25 MIN 11-21-78 3A 25 MIN 11<<14-78 3D 25 MIN 11-7-78 3C 25 HIN 11-1-78 3B 25 MIN 11-28-78 3B 25 MIN 12-26-78 3B 25 MIN X 12-19-78 3A 25 MIN 12-12-78 25 MIN X 12-5-78 3C 25 MIN 10-28-80 3B 25 MIN X 10-22-80 3A, 25 MIN 10-14-80 3D 25 MIN X 10-7-80 3C 25 MIN 10-2-80 3A 25 MIN 11-25-80 3B X 25 MIN 11-18>>80 3A 25 HIN X U.-11-80 3D 25 MIN 11-5-80 3C 25 MIN X 12-14-80 3D 25 MIN 12-22-80 3A 25 MIN
~ ~
~ g
~ ~
p I SI 4.9.A.1.A TIME RAN 01SAT DATE D/G START LOADI D UNLOAD I.OADl:D UNI.OAD SCil 12-11-80 3D 25 MIN 12-2-80 3C. 25 MIN 9-30-80 25 MIN 9-25-80 X 25 MIN 9-16-80 25 MIN 9-9-80 C 25 MIN 9-2-80 25 MIN 10-28-80 B 25 MIN 10-22-80 25 MIN 10-15-80 25 MIN X
, 10-7-80 25 MIN 11-25-80 25 MIN.
11-19-80 25 MIN
'11-11-80 D 25 MIN 11-4-80 25 MIN X 12-31-80. X 25 MIN 12-23-80 B 25 MIN X 12-16-80 25 MIN 12-14-80 25 MIN 12-9-80 25 MIN 12-2-80 25 MIN X 7-29-80 3A 25 MIN 7-23-80 3D 25 MIN 7-16-80 3C 25 MIN 8-8-80 3A 25 MIN 8-6-80 3B 25 MIN X
'-26-80 3A X 25 MIN 8-21-80 3D 25 MIN 8-12-80 3C 25 MIN
~yah I a,
~
SI 4.9.A.4'.A 0
0 0% TIME RAN DATE D/G START LOADED UNLOAD LOADED UNLOAD SCH 11-1-76 15 MIN 15 MIN 15 MIN 15 MIN 3A 15 MIN 3B 15 MIN X 3C X 15 MIN 3D 15 MIN 10-26-80 15 MIN 15 MIN 15 MIN X 15 MIN 3A X 15 MIN 3B 15 MIN X 3C 15 MIN 3D 15 MIN 6-5-80 A 15 MIN X 15 MIN 15 MIN D 15 MIN 3A 15 MIN 3B 15 MIN 3C 15 MIN 3D 15 MIN 4-27-79 A 15 MIN 15 MIN 15 MIN 'X 15 HIN 3A 15 MIN 3B 15 MIN 3C 15 MIN 3D 15 MIN
.SI 4.9.A.4.A Oe TIME RAN DATE, D/G START LOADED UNLOAD LOADED UNLOAD SCH 4-27-79 . A 15 MIN B 15 MIN 15 MIN X 15 MIN 3A 15 MIN , X 3B 15 MIN 3C 15 MIN 3D X 15 MIN 10-24-79 15 MIN X 15 MIN X 15 MIN 15 MIN X 3A 15 MIN 3B 15 MIN 3C 15 MIN 3D 15 MIN 4-28-78 ,X 15 MIN 15 MIN 15 MIN X 15 MIN 3A 15 MIN 3B 15 MIN X-3C 15 MIN 3D 15 MIN 11-2-78 15 MIN X 15 MIN X X 15 MIN X 15 MIN X 3A 15 MIN 3B 15 MIN 3C 15 MIN 3D 15 MIN e" ~ ~
4 T1MI'. 1(AN Rt 'Og ~~ ~ ~
DATE D/G START LOADED UNLOAD LOADED UNLOAD SCIi
-76 15 HIN 15 MIN X X 15 HIN X 15 MIN 3A 15 MIN X 3B 15 HIN X 3C X 15 MIN .
3D X 15 MIN X 6-2-76 A 15 MIN X X 15 MIN X MIN X' 15 MlN
'A 15 MIN 3B 15 MIN X 3C 15 MIN 3D X 15 MIN 5-7-77 15 MIN 15 MIN 15 MIN 15 MIN 3A 15 MIN X 3B 15 MIN 3C 15 MIN 3D 15 MIN 10-31-77 15 MIN B 15 MIN 15 MIN 15 MIN 3A 15 MIN 3B 15 MIN X 3C 15 MIN 3D 15 MIN
a . * " 'SI 4.9.A.Z.A po TIME RAN DATE D/G START LOADED UNLOAD LOADED UNLOAD 'CH 7-30-77 10 MIN 5 MIN" X 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN 1-25-77 10 MIN ,5 MIN X 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN 7-30-77 10 MIN 5 HIN X 10 MIN 5 MIN X 10 MIN 5 HIN X 10 MIN 5 MIN 2-22-78 3A X 10 MIN 5 MIN 3B 10 MIN 5 MIN 3C 10 MIN 5 MIN 3D 10 MIN 5 MIN 2-14-77 3A 10 MIN 5 MIN 3B 10 MIN 5 MIN 3C 10 MIN 5 MIN 3D 10 MIN 5 MIN 2-15-77 3A 10 MIN 5 MIN 3B 10 MIN 5 MIN 3C 10 MIN 5 MIN 3D 10 MIN 5 MIN 8-16-77 3A 10 MIN 5 MIN 3B 10 MIN 5 MIN 3C 10 MIN 5 MIN X 10 MIN 5 MIN 8-17-77. 3A 10 MIN 5 MIN X 3B 10 MIN 5 HIN 3C 10 MIN 5 MIN 3D 10 MIN 5 MIN X 6-13-76 3A 10 MIN 5 MIN X 3B 10 MIN 5 MIN 3C 10 MIN 5 MIN X 3D 10 MIN 5 MIN X
~,
4
00 TIME RF.. ON S A DATE D/G START LOADED UNLOAD LOADF.D UNLOAD SCH 6-13-76 3A 10 HIN 5 MIN 3B 10 MIN 5 MIN 3C 10 MIN 5 MIN 3D 10 MIN 5 MIN 8-21-76 3A 10 MIN 5 MIN 3B 10 MIN 5 MIN 3C 10 MIN 5 MIN 3D 10 MIN 5 MIN 8-21-78 3A 10 MIN 5 MIN 3B .2 10 MIN 5 MIN 3C 10 MIN 5 MIN 3D 10 MIN 5 MIN 2-22-80 A 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN .5 MIN 2-22-80 10 MXN 5 MIN X 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 HIN 7-22-80 10 HIN 5 MIN 3B 10 MIN 5 MIN 3C 10 MIN 5 MIN 3D 10 MIN 5 MIN 7-22-80 3A 10 MIN 5 MIN 3B 10 MIN 5 MIN 3C X 10 MIN 5 MIN 3D 10 HIN 5 MIN 2-22-80 3A 10 MIN 5 MIN 3B 10 MIN 5 MIN 3C 10 MIN 5 MIN 3D 10 MIN 5 MIN 2-22<<80 3A 10 MIN 5 MIN 3B X 10 HIN 5 MIN 3C 10 MIN 5 MIN 3D 10 MIN 5 MIN
t 0
~
SI 4'.9.A.3.A TIME RAN R. 0 DATE D/G START LOADED UNLOAD LOADED UNLOAD SCH 7-22-80 A 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN X 10 MIN 5 MIN 7-22-80 10 MIN 5 MIN 10 MIN 5 MIN X 10 MIN 5 MIN 10 MIN 5 MIN 8-10-79 3A 10 MIN 5 MIN 3B 10 MIN 5 MIN 3C 10 MIN 5 MIN 3D 10 MIN 5 MIN 8-10-79 3A 10 MIN 5 MIN 3B 10 MIN 5 MIN 3C 10 MIN 5 MIN 3D 10 MIN 5 MIN 7-24-79 A 10 MIN 5 MIN 10 MIN 5 MIN X 10 MIN 5 MIN X X 10 MIN 5 MIN X 7-24-79 A 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN X 10 MIN 5 MIN 2-5-80 X 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN 2-5-80 A X 10 MIN MIN Xi 10 MIN 5 MIN X 10 MIN 5 MIN X 10 MIN 5 MIN 1-22-79 A X 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN X
,X 10 MIN 5 MIN
~ ")
)
'i4 0% TIME RAN REASON DATE D/G ~
START LOADED UNLOAD LOADED UNLOAD SCH 1-22-79 10 MIN 5 MIN B 10 HIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN 8-3-78 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN 8-3-78 10 MIN 5 MIN X 10 MIN 5 MIN 10 HIN 5 MIN 10 MIN 5 MIN 2-13-79 10 MIN 5 MIN 3B 10 MIN 5 MIN X 3C 10 MIN 5 MIN 3D 10 MIN 5 MIN 2-13-79 3A 2 10 MIN 5 MIN 3B 10 MIN 5 MIN 10 HIN 5 HIN 3D 10 HIN 5 HIN 8-18-79 3A 10 HIN 3B X 10 HIN 5 MIN 3C 10 MIN 5 MIN X 3D 10 MIN 5 MIN 8-11-78 3A 10 MIN 5 MIN 3B 10 MIN 5 MIN 3C 10 HIN 5 MIN 3D -X 10 MIN 5 MIN X 1-31-78 2 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 HIN 1-31-'78 10 MIN 5 MIN 10 MIN 5 HIN 10 MIN 5 MIN 10 MIN 5 MIN
I a ~ A SI 4.9.A. .D Pd TIME RAN R ON T DATE D/G START LOADED UNLOAD LOADED UNLOAD SCH 12-27-'76 3A X 90 MIN 10 MIN 12-28-76 3A 90 MIN 10 MIN 6-14-77 3D 90 MIN 10 MIN 4-19-77 3B 90 MIN 10 MIN 7-28-77 3B 90 MIN 10 MIN 6-14-77 3D 90 MIN. 10 MIN X 1-11-78 3A .90 MIN 10 MIN 12-15-77 90 MIN 10 MIN 11>>4-77 90 MIN 10 MIN X 10-9-77 90 MIN 10 MIN 10-8-77 A 90 MIN 10 MIN 11-6-77 90 MIN 10 MIN X 7.-6-78 3D X 90 MIN 10 MIN 6-22-78 3D 90 MIN 10 MIN 7-11-79 3D 90 MIN 10 MIN 6-14-79 3C X 90 MIN 10 MIN X 1-11-79 3B 90 MIN 10 MIN 11-15-78 90 MIN 10 MIN 10-20-78 90 MIN 10 MIN 11-21-79 X 90 MIN 10 MIN 11-20-79 90 MIN 10 MIN 10-13-79 90 MIN 10 MIN
'0 10-10-79 A 90 MIN MIN 4-12-79 90 MIN 10 MIN 6-18-80 3D 90 MIN 10 MIN 2-20-80 3B 90 MIN 10 MIN 1-21-80 3A 90 MIN 10 MIN 12~13-80 90 MIN 10 MIN 10-30-80 90 MIN 10 MIN 10-4-80 X 90 MIN 10 MIN 10-3-80 90 MIN 10 MIN 3D X 90 MIN 10 MIN 6-17-80 3D X 90 MIN 10 MIN
0 SI 4.9+A+1.B 100% 0% TIME RAN R A 03 TAR DATE D/C START LOADED UNLOAD LOADED UNLOAD SCH 12-5-79 3A 15 HIN 5 HIN 3B X 3C 15 3D X 15 MIN 3D 15 MIN 5 MIN X 3-7-80 B 15 MIN X 15 MIN 5 MIN 15 MIN 5 MIN 1-17-79 15 HIN 5 MIN B X 15 MIN 5 MIN 15 MIN 5 MIN 15 MIN 5 MIN 11-17-78 3A 15 MIN 5 MIN X 3B 15 MIN 5 M 3C'D X 15 MIN 5 MIN 12-16-'7 15 MIN B 15 MIN 5 HIN 1 MI 15 HIN 5 HIN 5-31-76 15 MIN 5 MIN X B X 15 MIN 5 MI 15 MIN 5 MIN 15 MIN 5 MIN I
4-15-76 3A X 3B 15 MIN 3C X 15 MIN HIN 3D 6-3-76 3D 15 MIN MIN
SI 4.9.A.l. Su lement A TIME RAN DATE D/G LOADED UNLOAD LOADED UNLOAD SCH 2-16-78 3A 15 MIN, 3B 15 MIN 3C 15 MIN 3D 15 MIN 1-12-78 3C 15 MIN 3D 15 MIN 11-4-78 3A 15 MIN 3B 15 MIN 3C 15 MIN 3-31-78 C'TART 3D 3A 15 MIN 15 MIN 3C 15 MIN 3D 15 MIN 4-30-78 3A 15 MIN 3B 15 MIN 3C 15 MIN 3D 15 MIN 5-30-78 3A 15 MIN 3B 15 MIN 15 MIN 3D 15 MIN 6-22-78 3A 15 MIN 3B 15 MIN 3C 15 MIN 15 MIN 10-14-78 15 MIN 15 MIN X 15 MIN 15 MIN 7-28-78 A 15 MIN 15 MIN 15 MIN 15 MIN 10-21-78 15 MIN 15 MIN 15 MIN
~ I fr r ~
SI 4.9.A. S TIME RAN DATE D/G START LOADED UNLOAD LOADED UNLOAD SCH 2-12-78 A X ~
1 M N 15 MIN 5-2-78 15 MIN B 15 MIN 15 MIN 5>>22-78 15 MIN B 15 MIN 15 MIN D 15 MIN 5-23-78 3A X 15 MIN 3B 15 MIN 3C X 15 MIN
'0 5-23-78 3D 15 MIN 15 MIN 15 MIN B
15 MIN D 15 MIN 6-27-78 15 MIN B 15 MIN 15 MIN 15 MIN 6-30-78 3A 15 MIN 3B 15 MIN 3D 15 MIN 7-30-78 3A -X 15 MIN 3B 15 MIN 3C 15 MIN 3D 15 MIN 8-22-78 3A 15 MIN 3B 15 MIN 3C 15 MIN 15 MIN
SI 4.9.A.1. Su lement A TIME RAN R OV DATE D/G. START LOADED UNLOAD LOADED UNLOAD SCH 10-14-78 3A 15 MIN 3B 15 MIN 3C 15 MIN 3D 15 MIN 1-16-79 3A 15 MIN 3B 15 MIN 3C 15 MIN 3D X 15MN 6-14-79 3A 15 MIN 3B X 15 MIN 3D 1 M 7-11-79 3A X 15 MIN 3B 15 MIN 3C 15 MIN 8-4-79 3A 15 MIN 3B X 15 MIN 3C 15 MIN 3D X 15 MIN 11-25-79 3A 15 MIN X 3B 15 MIN 3C 15 MIN 3D 15 HlN 12-26-79 3A 15 MIN 3B 15 MIN 3C 15 MIN 3D 15 MIN 12-26-79 15 MIN 15 MIN 11-27-79 A 15 MIN 15 MIN 12-7-79 X 15 MIN 15 MIN 15 MIN 15 MIN
SI 4.9.A.l. Su lement A TIME RAN DATE D/0 START LOADED UNLOAD LOADED UNLOAD SCH 11-7-79 X 15 MIN 15 MIN 15 MIN 15 MIN 9-27-79 15 MIN 15 MIN 15 MIN X 15 MIN 10-9-79 15 MIN 15 HIN 15 MIN 15 MIN 8-4-79 15 MIN 15 MIN X 15 MIN 15 MIN 7-10-79 15 MIN 15 MIN 15 MIN 15 MIN 6-1-79 15 MIN 15 MIN 15 MIN 15 MIN 4-16-79 15 MIN X 15 MIN
-X 15 MIN 15 MIN 1-25-79 15 MIN B 15 HIN 35 MIN 15 HIN 12-29-78 15 MIN X 15 MIN 15 MIN
SI A TIME RAN R ON DATE D/G START LOADED UNLOAD LOADED UNLOAD SCH 11-2-78 15 MIN B 15 MIN C 15 MIN 15 MIN X 1-8-80 A X 15 MIN B 15 MIN X 15 MIN 1-8-80 A 15 MIN 15 MIN 15 MIN 1-30-80 B 15 MIN X 15 MIN X 15 MIN 1-31-80 A 15 MIN B 15 MIN 15 MIN 15 MIN 2-1-80 A 15 MIN 15 MIN 15 MIN 2-2-80 A 15 MIN 15 MIN 15 MIN 2-5>>80 15 MIN 15 MIN X 2-6-80 A 15 MIN X 15 MIN X B 15 MIN 15 MIN 15 MIN 2-7-80 15 MIN 15 MIN 15 MIN 15 MIN
SI 4.9.A.1. Supplement TIME RAN R A 'AN, ART DATE D/G START LOADED UNLOAD LOADED UNLOAD SCH 2-8-80 15 MIN B 15 MIN X 15 MIN 15 MIN 2-9-80 15 MIN B X 15 MIN 15 MIN X 15 MIN 2-12-80 15 MIN
.B 15 MIN B 15 MIN X 15 MIN X 15 MIN 15 MIN 2-16-80 A 15 MIN B 15 MIN 15 MIN X 15 MIN 3-1-80 15,MIN B 15 MIN 15 MIN 15 MIN 3-2-80 15 MIN B 15 MIN 15 MIN 15 MIN 3-10-80 A X 15 MIN B 15 MIN X 15 MIN X 15 MIN 3-12-80 15 MIN B 15 MIN X 15 MIN .X 15 MIN
SI 4.9.A.1. SU lement A TIME RAN DATE D/G START LOADED UNLOAD LOADED UNLOAD SCH 3-18-80 X 15 MIN B 15 MIN 15 MIN X
D X 15 HIN 4-11-80 A X 15 HIN B 15 MIN X
X 15 MIN 4-12-80 A X 15 MIN B X X 15 HIN D 15 MIN 6-28-80 A 15 HIN B 15 MIN 15 MIN 15 MIN 6-25-80 15 MIN B 15 MIN 15 HIN 15 MIN 6-24-80 15 MIN B X 15 MIN X 15 MIN D 15 MIN 6-23-80 A 15 MIN B 15 MIN 15 MIN 15 MIN 6-22-80 15 MIN 15 MIN 15 HIN D - X 15 MIN 6-21-80 X 15 HIN B 15 MIN 15 MIN 15 MIN
If SI 4.9.A.1. Su e TIME RAN R h ON S AR DATE D/G START LOADED UNLOAD LOADED UNLOAD SCH 6-20-80 A 15 HIN 15 MIN X 15 MIN 15 MIN X 6-6-80 B 15 MIN X 15 MIN 5-12-80 15 MIN 15 MIN 15 MIN X D 15 HIN 5-1-80 15 MIN 15 MIN B 15 MIN 15 MIN D 15 MIN X 4-16-80 15 HIN X 15 MIN X C 15 MIN D 15 MIN X 4-15-80 15 MIN B 15 MIN 15 MIN X 15 HIN 4-14-80 15 MIN B 15 MIN X 15 MIN X 15 MIN 4-13-80 A 15 MIN X i B 15 MIN C 15 HIN 15 MIN
I 0
ENCLOSURE 2 MODIFICATIONS OF DIESEL GENERATORS AT BROWNS FERRY NUCLEAR PLANT 1976 1980
0 Item Descri tion "82-1 Modify diesel generator air start air compressor discharge piping to allow for easy maintenance (Complete) 82-2 Canceled 82-3 Install blowoff valves in air supply lines on diesel generator units (Complete) 82-4 Mimic buslight change panel 9-8 (Complete) 82-5 Diesel generator air start system modification work along with item 82-6 (Complete) 82-6 Modify generator air start supply piping work with item 82-5 (Complete) 82-7 Canceled 82-8 Remove nameplates on diesel generator main control board panels 5 and 8 82-9 Add manual start switch to fuel oil transfer pump No. 1 (Complete) 82-10 Install cables and change circuits for long-term diesel generator use (Complete) 82-)'1 Revise diesel generator battery ventilation system (Complete) 82-12 Install 100-ampere fuses in diesel generator field circuit 82-13 Add rembvable panels between A, B, C, and D air intake and exhaust plenums, el 583.50, diesel generator building 82-14 Rewire diesel generator protective relaying circuitry to enable diesel generator loss of field trip (NFL D-B), etc.
82-15 Replace NVR relay with VSR relay on temporary basis (Canceled) 82-16 Install drain cocks in bottoms of standby diesel generator engine tanks (day tanks) providing drains from the lowest points 82-17 Interlock synchronizing switches so that only one may energize synchronizing circuit stop time (Canceled)
Replace stiff, 300 MCM battery cables with flexible 1/10 cables Diesel generators A, B, C, and D Install isolation valve on air line to air start motors approximately 66 inches above diesel catwalk on south side of diesel engine Replace existing speed sensing panels with solid-state speed sensing panels on all eight diesel generators Diesel generator building (HVAC) Install physical barriers in ductwork Install new gear-type vibration dampers in place of existing ones (emergency diesel engine)
Add second lube oil circulation pump to ensure constant circulation, etc. Modify piping; add a dc oil pump, etc.
Emergency diesel engines When new heavy-duty drive gear turbochargers are installed, install new redesigned turbospring drive gears
vnkt 2 Item Descri tion 82-1 Inspect wiring at HS-82-1, panel 9-8 (Complete) 82-3 Revise load scheduling logic on core spray pumps (Complete) 82-4 Canceled 82-6 Reroute cables (Complete) 82-7 Canceled 82-8 Remove nameplates Diesel generator main control board, panels 5 and 8 (Complete) 82-9 Canceled 82-10 Canceled
, 82-11 Replace existing speed sensing panels with solid-state speed sensing panels on all eight diesel generators 82-12 Add a second lube oil circulation pump; modify piping; add a dc oil pump, etc.
Unit 3 Item Descri tion 82-23 Units 1 and 2 diesel generator 480-V load shedding annunciation cleanup (See 0-82-4) 82-25 Install H6 valves in diesel generator building cooling system (Complete) 82-26 Purchase and install moisture traps in unit 3 (Complete) 82-27 Purchase of pressure reducing valves (Complete) 82-28 Diesel generator building dampers (Complete) 82-29 Revise diesel generator battery ventilation system (Complete) 82-30 Provide additional synchronizing scope or move equipment for easy visibility 82-31 Install shim to prevent coil assembly of potential transformer from moving on laminated iron core 82-32 Replace spring-loaded primary pontential transformer fingers with shoe-type assembly 82-33 Add thermostat controlled fan and damper in mechanical equipment rooms A and B, el 595 82-34 Install 100-ampere fuses in diesel generator field circuits 82-35 Rewire diesel generator protective relaying circuitry to enable diesel generator loss of field trip (NFLD-B), etc.
82-36 Replace Exide batteries and racks with'SD batteries and racks like units 1 and 2 (Complete) 82-37 Install drain cocks in the bottoms of standby diesel generator engine tanks (day tanks) providing drains from the lowest points 82-38 Interlock synchronizing switches so only one may energize synchronizing circuit at any one time (Canceled)
~,
Change the valve of RE2 (speed sensing panels 1 and 2) (Canceled)
Install isolation valve on each air line to the two air start motors Changed structural member M6X22.5 to M6X20 and other minor changes. Drawing 44N271-Ol (Complete)
Install blowoff valve 5 in bottom of strainer (by Bruce) located in air supply line on diesel unit (Complete)
Field to purchase replacement reservoir with sight glass for No. 10-003-073, 45 quick fill cap No. 418-001-012 and filler hand (Complete)
Add 4 diesel generator and associated switchgear motor control batteries, water chillers, centers, annunciators, cooling water (Complete)
TS-82-3D water immersion heater control switch inoperative (Complete)
Install cables and change circuits if necessary to allow paralleling of diesel generators A and 3EA, B to 3EB, C and B, 3EC, D to 3ED for long-term diesel generator use (Complete)
Replace burned cable from unit 3 panels 9-32 and 9-33 for PASA and CASA logic to unit 1 diesel (Complete)
Repair fire damaged cables between unit 3 and units 1 and 2 diesel generators (Complete)
Install the following: Four l-l/2 inch flex coupling hoses; eight 3/4 inch coupling for relief valves; Four l-l/2 inch gate valves; 1/2 inch 600 WBE and moisture traps (Complete)
Complete BF on test (Complete)
f~
82-41 Replace existing speed sensing panels with solid-state speed sensing panels on all eight diesel generators 82-42 Diesel generator (lube oil system) - Addition of second oil pump, modify piping, add dc oil pump 82-43 Provide physical barrier for diesel generator building HVAC ductwork 82-44 Emergency diesel engine When present dampers are removed, replace with new gear-type vibration dampers 82-45 When new heavy-duty drive gear turbochargers are installed, remove existing turbo spring drive gears and install new redesigned turbospring drive gears DJMS:DJL 1/8/81
ENCLOSURE 3 LXCENSEE EVENT REPORTS BROWNS PERRY NUCLEAR PLANT 1976 1980
BFNP LICENSEE EVENT REPORT SYSTEM 082 BY DATE AND UNIT 9/1/81 ITEH NO. REILARKS/STATUS 76 LER 7'1047W FM 73/12/19 EA 73/12/28 B093 EVENT - D/G A could not start IU1R pump 2A and C/A - Tested D/G; replaced 001 082 RELAYX 73/12/28 EH pump motor tripped on overcurrent. voltage regulator.
CAUSE - D/G voltage regulator failed. 0.1. - None.
73 LER 73050W EH 73/12/28 XZ 74(01/03 Z999 EVENT - D/G "C" failed tn start during sched. C/A - Correc ed terminal 001 082 ZZZZZZ 74/01/03 EM maint. test. connection and checked all CAUSF. - Loose termina1 connection in start other similar connections.
circuit No. 1. 0.1. - None.
67 LER 74004W EM 74/01/16 ED 74/01/25 1075 EVENT - Start system failure on standby diesel C/A - Replaced lover starter;
- 001 082 CKTBRK 74/01/25 EH generator. found rust and lack of lub in CAUSE - Left bank starters failed to develop failed starter air line.
torque to start engine. O.I. - Test 0/G air start system
<<ill be increased from 0/4 to 2/4.
124 LER 74013W EM 74/02/25 BB 74/03(07 I075 EVENT - Start system left. bank failure on standby C/A - Replaced starters; blovout 001 082 CKTBRK 74/03/07 EH diesel engine "A'. air line, cleaned filter.
CAUSE - Rust from air supply system found on O.I. - None.
disassembly of starter.
107 LER 74019W OPS 74/03/21 AA 74/03/29 2999 EVENT - Removed A D/G from service with proving C/A - Test per T.S.
001 082 ZZZZZZ 74/03/29 OPS operability of other 3 D/G; core spray & LPCI requirements review by per T.S. requirement. SE's and A SE's.
CAUSE " SE knew SI test on all D/G proved O.I. - None.
satisf. within past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> & consider other sys. operable & no addition test. needed.
109 LER 74021W RESULTS 74/04/03 BB 74/04/12 I075 EVENT - Start system right bank failure of C/A - Replaced both right bank 001 082 CKKBRK 78/08/04 RES standby D/G D. starters, cleaned air line CAUSE - Disassembly of failed starters revealed strainer; adjusted/line rust from air supply piping & inadequate lubrica- lubricator.
tion. O.I. - None.
ITEII ND ASSD SECT DATE EUPIIT C/C REPT IIATE VENDORS/RESP/CAUSE ~SUS/ECT DPSCRII'TIDE REMARKS/STATUS 316 LER 75008W LJ 75/05/21 EB 7'R/05/30 1075 EVENT - Diesel generator A inop during S.I. C/A - Motors replaced; solenoid 001 082 MECFUN 78/09/20 EDJ CAUSE - Air starting motors dirty and rusty. valve seats, air-line strainers cleaned. Test satis.
0.1. - Design changes issued and vill be implemented vhen
~
materials are avail. Completed 165 LER 76001W EM 76/01/14 EE 76/OJ/23 W290 EVENT - Diesel generator '0" failed the monthly C/A - D/G "B" put, in service 8 001 082 CKTBRK 76/01/23 E."1 SI test. tied 4-KV SD. BD. "C" to supply CAUSE - Hydraulic actuator of the diesel govr pwr. RHR PMP on south EECW healier.
didn't respond properly to the signals from the Oil added to actuator 8 adjustI d.
electrical governor. O.I. - None.
204 LER 76023 MM 76/11/03 EB 76/11/24 h'290 EVENT - Diesel gen. erratic speed found during SI. C/A - Oil changed - test satisi.
001 08PZ MECFUN 78/08/23 MM CAlJSE - Dirty oil Woodvard Governor mlodel O.I. - Governor oil changed EG-Bio actuator. periodically - SDJI-o.
206 LER 76025 EM 76/ll/22 EA 76/1 /08 S345 EVENT - Diesel Gen. B start circuit breaker C/A - Breaker vas replaced.
001 082 CKTBRK 76/12/08 EM inoperable during maint. test. O.I. - None.
CAUSE - Broken stud holder on A connector of breaker no. L25V909.
136 LER 78022 EM 78/07/09 XZ 78/07/31 I017 EVENT - Field breaker for diesel generator IC C/A - Louvers were straightened.
001 082 BLOWERZ 78/07/31 EM tripped on Units 1 & 2 while in hot standby Other louvers were checked 8 due to thermal heating. repaired.
CAUSE - Protect,ive louvers had been bent into O.I. - None.
the fan blade while removing scaffolding.
477 LER 80001 MM 80/01/07 EB 80/01/18 X999 EVENT - With U-3 in cold shutdown while performing C/A - A special instr. was written 001 082 MECFUN 80/01/18 MM test, speed control on 3A diesel gen was lost. to inspect all other diesel gen.
VENDOR CAUSE - Coupling which connects speed pick-up to All couplings were inspected on all gen shaft had broken. O.I. - None
ITEM NO. ASSG SECT DATE EVENT C/C REPT DATE VENDORS/RESP/CAUSE SUBJECT/DESCRIPTION RKHARKS/STATUS 767 LER 81019 HH 81/05/06 EX 81/06/01 I075 EVENT- During refuel outage & D/G start EMI-3 test, C/A - Air starting motors replaced.
001 082 HOTORX 81/08/05 HM the "C" engine left bank air start motors ~ould not 0.1. - Recurrence control to monitor develop min. speed. (T.S. 3.9.B.2) motors & eval present preventive CAUSE- Stxcky vanes (dirty motors). maint. Air start mtrs will be rebuilt 0/Y; inspect, clean,
& lubricate 2/Y.
768 LER 81020 W 81/05/06 EF 81/05/29 I075 FVENT - Dur refuel & D/G start EMI-3 test C/A - Rplcd mtr.
001 082 HOTORX 81/08/05 81/06/26 HH (T.S.3.9.8.2), "D" engine left bank air start O.I. - Recurr. control prog mtrs would not dev min. speed. to mon. mtrs perform. &
CAUSE - Broken motor's vane due to normal wear. preventative natant 'val
~ingersoll-Rand motor size 150 BHP, Hdl D89RH46.) Air start mtrs will be rebuilt 0/Y; inspect, clean, & lubricate 2/Y 785 LER 81035 81/06/20 EF 81/07/15 I075 EVENT - Dur RO/EHI-3 D/G start. test, left. bank C/A - Air start mtr rplcd.
001 082 MOTORX 81/08/05 starters of D/G "B" would not dev. min. rotational Recurrence control prog monitor speed (T.S.-3.9.B-2). perform. of mtrs continues to be CAUSE - Normal wear, dirt, & grit in air start eval. Air start mtrs will be rebuilt sys ~ 0/Y; inspect, clean & lub 2/Y.
O.I. - None per Rev. 1 (81/07/31).
ITEM NO. ASSG SFCT DATF. FVENT C/C REPT DATE VENDORS/RESP/CAUSE SUIVECT/DESCRIPTION REMARKS/STATUS 18 IER 76002W EM 76/01/14 EE 76/01/23 W290 EVENT - Diesel generator "D" failed the rsonthly C/A - D/G "B" put in service g 002 082 CKTBRK 76/Ol/23 EH SI test. tied 4-'KV SD. BD. "C" to supply CAUSE - liydraulic actuator of the diesel govr pur RNR. PMP on south EECW header.
didn't respond properly to the signals fron Oil added to actuator g adjusted.
the electrical governor.
r O.I. - None.
ITFH NO. ASSG SECT DATE FVENT C/C RFPT DATE VENDORS/RESP/CAUSE SUB3ECT/DESCRIPTION REMARKS/STATUS 39 LER 76019 lL'l 76/11/26 EB 76/12/14 E160 EVENT - D/G 3D start circuit 1 found inop during C/A - Relay replaced; test satis.
003 082 RE LATEX 76/12/14 HM S.I. O.l. - None.
CAUSE - Relay failure in speed sensing circuit.
60 LER 77020 MH 77/09/19 EX 77/10/04 H]75 EVENT - d.g.3D tripped on overspeed during EHI-3 C/A - Replaced fuse.
003 082 ~KQi 77/10/04 MM CAUSE - Bussmann low peak dual clem. time delay O.I. - iNouc.
fuse opc n.
102 LER 79023 EH 79/12/02 XZ 79/12/31 Z999 EVENT - Diesel generator 3C tripped fol. start of C/A - Freq. gen. voltage output 003 082 ZZZZZZ 79/12/31 EM RHR pump 3B contrary to T.S. 3.9.A, during corrected & speed sensing panels performance of DG cmerg. load acceptance test. calib.
CAUSE - Voltage output of freq. generator too high O.I. - None.
resulting in the DG tying in at lover speed & volt..
Higher output. due to component drift.
112 LER 80008 MH 80/04/02 XZ 80/05/01 W290 EVENT - With unit at 100$ power, DG/3B governor C/A - Sump flushed & ref!1 ed with 003 082 MECFUN 81/08/05 MM actuator would not respond properly during new oil,
& SI run successfully.
operability SI 4.9.A.l, Supplement A. O.I. Sample & change oil annually.
CAUSE - Unknown, suspected oil contamination. HHI-6 specifies sample & change oil 0/Y.
124 LER 80020 EM 80/06/09 EB 80/07/03 H263 EVENT - 3B Diesel Generator Aux. Oil Pump Motor C/A - Hotor replaced. Bearings 003 082 HECFUN 80/07/03 EH tripped twice (T.S. 3.9.8.2) during normal are replaced every two years.
operation. O.I. - None CAUSE - Due to failure of Model 6203Z sealed bearings.
150 LER 80040 MH 80/10/10 EF 80/11/07 V125 EVENT - During 99$ power, 3EB Diesel Gen. lube oil C/A - Replaced Viking pump, 5 gpm, 003 082 PUMPXX 80/11/07 MM pump was inoperable (T.S.3.9.B.2). Hdl. GV503A.
CAUSE - The double-row ball bearing locked. O.I. - None Attributed to normal end of life.
176 LER 81004 EM 81/01/10 EX 81/02/03 E147 EVENT - During refuel & acceptance load testing, C/A - Potentiometers for VS relays 003 082 INSTRU D/G 3A & bkr. 1836 tripped fm D/G on SSPI & SSP2 cal., & F/T.
overspeed (T.S. 3.9.C.l). EMI 72.1 for VS 'relay cal compl CAUSE - VS relays on speed sensing panel 2 3/20/81 & sched every 6 mos.
energized at less than 870 RPH. DCR 2242 replaces existing pnls w/reliable solid state pnls.
O.I. - None
i'I ITEH NO. ASSG SECT DATE FVENT C/C REPT DATE VENDOR//RESP/CAUSE SUBJECT/DESCRIPTION RE!BRKS/STATUS 180 LER 81009 E'i 81/02/03 XZ 81/02/27 Z999 EVENT - While perform S.I. 4.9.A.1 suppl. A (unit C/A - D/G successfully tested 003 082 ZZZZZZ 81/02/27 at 100$, power), D/G 3C inop (Ref: TS-3.9.B.2). operability several times. S.I.
failed shutdown within normal time frame. Failed program & bimonthly start testing restart on 2 of 3 at. tempts. should identify any starting problems.
CAUSE - EH investigation reveals no cause to 0.1. - None prevent, restart.
199 LER 81023 >Li 81/05/10 DZ 81/06/04 1075 EVENT - Dur 97/, pwr while perfmg EHI-3 D/G C/A - Repld Ingersoll-Rand air 003 082 HOTORX start test, left bank air started mtrs on D/G start mtrs, Mdl D89Rii46.
"C" would not dev minimum speed (T.S. 3.9-8.2) 0.1. - Recurrence control prog CAUSE - Sticking vanes on di.rty air start mtrs. to monitor performance of mtrs continues to be eval.
Clean, inspect & lub all D/G ai r start mtrs & rebuild 0/Y is in work.
207 LER 81033 EH 81/07/06 EB 81/07/30 S345 EVENT - During 99$ po~er & EHI-3 start test, D/G C/A - Relay was timed & tested all 003 082 RELAYX 81/08/03 3C redundant start relay SFD1 time delay exceeded right.
4.4 seconds (T.S. 3.9.B.2). O.I. - None CAUSE - Pneu. time delay relay drifted out of tolerance.
0 ENCLOSURE 4 INSTRUMENT MAINTENANCE
SUMMARY
BROWNS FERRY NUCLEAR PLANT 1976 1980
BRNS FERRY NUCLEAR PLANT INSXRlIMENT MAINTENANCE SUKIARY Effect on Safe Action Taken Date System Component Nature of Operation of Cause of Results of To Preclude
)>
12/14/77 Diesel LI-3EC and 3ED Maintenance one lugged a5r port False indicat5on None generator i
2/13/79 Standby 3D air compressor Calibrate one Setpoint drift Air compressor shut None diesel pressure switches I off 3 PSI low generator I
2/26/79 >
Standby 3A diesel Replace tNone 'Leaking gauge Diesel fuel in gauge None
~
diesel < generator fuel generator pressure gauge
ENCLOSURE 5 MECHANICAL MAINTENANCE
SUMMARY
BROWNS FERRY NUCLEAR PLANT 1976 1980
BROWNS FERRY NUCLEAR PLANT MECHANICAL MAliNTEiNANCE SUE LORY Effect on Safe Action Taken Date System Component Nature of Operation of Cause of Results of 1/2/76 Diesel 1C diesel Installed head None Gasket blew Air leak at cylinder Installed head gasket generator No. 1 air compres- gasket head sor head gasket l
7/1/76 Diesel Air compressor Replaced head None Blown head gasket Air leak on cylinder Replaced head gasket generator on 3D diesel gasket head 7/6/76 Diesel Coolers oil 3A Cleaned None Hud in coolers High oil temperature Cleaned and added to generator diesel preventative main-tenance program 8/29/76 Diesel Starting air Replaced head None Blown head gasket Compressor leaks Installed head gasket generator compressor head gasket will not pump to gasket 1B maximum pressure 8/11/76 Diesel 3B diesel "A" Replaced head None Blown head gasket Would not reach Installed new head generator air compressor gasket designed pressure gasket 8/20/76 Diesel Check valve on 3C Installed new None End of life Compressor would not Installed new check generator air compressor check valve reach its designed valve maximum pressure 9/6/76 Diesel 1B - A air Blown head None Blown gasket Air leak Installed new head generator compressor gasket gaskets
BROWNS FERRY NUCLEAR PLANT MEQQHICAL HA1NTEiNANCE SUE'fARY Effect on Safe Action Taken Date Sys em Component Nature of Operation of Cause of Results of To Preclude 9/6/76 Diesel 3D and 3B air Replaced head None Blown head gasket Air leak at compressor Installed new head generator comprcssors gasket head gasket I
Diesel 3C and 3A air
'/23/76 Replaced check None End of life Air compressor ran Installed new check generator (
compressors valve excessively valve I
1/7/77 Diesel B and D diesel Replaced head None Air compressor Low air pressure Installed new head generator air compressor gasket would not reach gasket designed pressure 1/29/77 Diesel D diesel air Replaced head None Blown head gasket Compressor would not Installed new head generator compressor "B" gasket pump its designed gasket pressure 4/7/77 Diesel Starting air Installed head None Blown head gasket Compressor would not Installed new head generators 'compressor 1D gasket pump to its compacity gasket diesel 6/14/77 Diesel 1A air compressor Replaced head None Blown head gasket Compressor would not Replaced head gasket generator "B" diesel gasket reach design pressure 6/18/77 Diesel 1A air compressor Replaced head None Blown head gasket Compressor would not Replaced head gasket generator "D" diesel gasket reach design pressure
BROWNS PERRY NUCLEAR PLANT MECHANICAL MAINTENANCE SUE'QRY Effect on Safe Action Taken Date System Component Nature of Operation of Cause of Results of To Preclude 7/1/77 Diesel Air compressor Blown head gasket None Blown head gasket None Replaced gasket generator on "D" diesel generator 8/1/77 Diesel Air compressor Blown head gasket None (Unknown Head gaskets blown J Replaced head gaskets generator I I
I I
8/23/77 Diesel PS- 82-26D Calibration None Setpoint drift No. 2 air compressor ~
N/A generator would start at 168 I psig. Should be 175 + 5 psig.
8/9/77 Diesel Diesel generator Cleaned N/A Scheduled mainte- N/A Cleaned generator ance 9/22/77 Diesel 3D generator Dirty oil None Operation None Plushed and refilled generator with oil-10/29/77 Diesel No. 2 air compres- Leaking pilot valv None Worn fittings None Reworked pilot valve generators sor on 3EC diesel and discharge and replaced check air line check valve valve
BRONNS FERRY NUCLEAR PLANT MECHANICAL MAINTENANCE SUE1ARY Effect on Safe Action Taken Date S.'tem Component Nature of Operation of Cause of Results of To Preclude I 11/21/77 Diesel Air start system Cleaned air start None Rust in air lines B diesel would not Cleaned strainer and generator 38 diesel system start in alloted time blew out air line I
12/5/77 Diesel "3B" diesel Blown head gasket None Unknown None Installed new head generators generator 1 air gasket compressor 12/27/77 Diesel Air compressor Head gasket leak None Hear None Replaced gasket C generator 3/1/78 Diesel 1 and 2 diesel Dirty oil None Operation None Changed oil generator generators 3)9/78 Diesel 3C, 3B, 3D diesel Low oil level None Unknown None Added oil generator .
4/24/78 Diesel Diesel generator Coupling worn out None Coupling worn out Diesel generator lube Installed new coupling generator lube oil pump .on diesel gene- oil pump noisy and aligned. TR rator lube oil No. 85166 pump
BROWNS FERRY NUCLEAR PLANT
>KCHANICAL KXINTENANCE SURGERY Effect on Safe Action Taken Date System Component Nacu e of Operation of Cause of Results of To Preclude 4/13/78 Diesel 3B diesel generato Replace check valve None Check valve guts Valve would not hold Replaced with new check generator No. 2 air compres- out valve TR No 99216 sor discharge valve I
4/17/78 Diese1 No. 3 diesel Filter changeout None Filters dirty Dirty filters Changed filter TR No.
generators generator air 88172 handling units
>4/18/78 Diesel Battery exhaust Fan breaker con- None 120-V coil bad Contactor trying to Replaced coil and generator fan on diesel tacts sticking burn up checked. TR No. 99231 generator 3C 5/4/78 Diesel Head gasket of 3D Gasket leaking None Unknown None Replaced gasket generators diesel No. 2 air compressor 5/27/78 Diesel No. 2 air . Head gasket blown None Unknown None Replaced gasket generator compressor
BRONNS FERRY NUCLEAR PLi4VT MECHANICAL ~!Al:iTEViANCE SUiDL1RY Ef feet on Safe Action Taken Date System Component Nature of Operation of, Cause of Results of To Preclude I6/7/78 Diesel No. 2 air com- Head gasket blown None Unknown one Tightened high-pressure generator pressor in diesel head and replaced generator room 3ED i6/9/78 Diesel 3C diesel generator Air leak one iHead gasket bad one ,Changed gasket generator No. 1 air I I
compressor I
(
I I
'/11/78 . Diesel ! No. 2 air <Safety valve None Operation one lReplaced safety valves generator 'ompressor Ileaking I
and clogged i and cleaned i
i starting .with rust i air I l I
I I "B" l
'/27/78 I Diesel ~ air compressor Head gasket blown None Operation None i I
Replaced head gasket I I generator ! on 3A diesel I
- 9 14 78 Diesel < B and D air Traps dirty with N/A Unknown N/A I Cleaned trap generator ~
I compressor corrosion ~
I building >
I moisture traps I heating and ventilation system
BROWNS FERRY NUCLEAR PLAhT MECilANICAL ~lAI'A'TENANCE SUMLARY Effecc on Safe Accion Taken Dace System ) Component iNacurc of Operation oi Cause of Results of To Preclude 9/1A/78 Diesel "D" air compressor Water leaking from N/A Operation N/A Blew down drain, steam-generator unloader valve I fitters are reworking building air crap I I heating and i ventilation l system I
i"E" 9/20/78 Diesel I
~ n air compressor Cooler clogged N/A Unknown N/A ~
i Removed and cleaned I generator I with mud intercooler. Replaced I building l ; heads with new gaskets heating and I I
ventilation I I system l i
I Diesel il ii "E" air compressor Head leaking, N/A Operation N/A 'Replaced head gasket, 9/25/78 l l I I generator intercooler and Icleaned intercooler strainer dirty I and strainer I
I I
t l i 10/18/78 Diesel Both fuel filters Dirty filters None Operation None I Changed 2 "D" diesel filters on generators ! on 1D diesel 10/19/78 Diesel Clean 1-A and 1-B Coolers were None Some mud in None Removed coolers heads, generators diesel generator dirty coolers - needed cleaned coolers, re-coolers cleaning placed heads using new gasket
BROWHS FERRY FOCLEAR PLANT MECNlhVICAL MAI NTEHAHCE SU1DLXRY Effect on Safe Action Taken Dace System Component Nature of Operacion of of v~4 Cause Results of To Prec1.ude n
6/11/79 Diesel 3C diesel Coolers dirty Hone Mud stopped up ;Overheating of coolers Cleaned both coolers, generator generator coolers replaced heads using building I nev gaskets heating 'and t ventilation I system I
I I i 8/16/79 Diesel i Air handling unit Filters need N/A Filters clogged up . N/A I
Changed out filters generator filters need changing I and replaced vith nev changing ! ones i
8/10/79 Diesel generator
'o. 2 air 'eaking around 'one I Leak around head Loss of pressure Repaired leak around compressor ~
high-pressure I i high-pressure head
( head I
! 9/4/79 Diesel Diesel generator Oil lov . None Operation None I Added oil generator B j 10/13/79 Diesel All diesel MMI 30 None Need to perform Wi 30 > Performed %11 30 on generator generator MMI 30 all diesel generators 10/15/79 Diesel Generator "A" Ail 6 None To perform MMI 6 None MMI 6 Recorded hour generator readings
BROWNS FERRY NUCLEAR PLANT MECHANICAL MAINTENANCE SU%!i!RY Effect on Safe Action Taken Date System Component Nature of Ooerat'on of Cause of Results of To r Prcc)ud'eplaced 8/21/80 Diesel HCV-32-669 Solder point N/A Broken joint N/A valve TR generator > broken above valve No. 170409 I
1
,'/22/80 Diesel "D" diesel Blown head gasket None , High-pressure Blown gasket [ Replaced blown head generator generator 'asket blown gasket TR No. 178482 l i I
I 10/10/80 Diesel 3ED diesel Circulating oil f None Pump locked up Pump would be inoper- 'eplaced pump I generator ! generator , pump locked up I able I i 1
I I
10/23/80 Diesel Lube oil cir- . Bad seal and ~
None Bad seal and Possibly prevent : Replaced seal and generators culating pump ~ bearings bearings startup of engine I bearings. TR No.
I I
137677 I
I
! 11/28/80 Diesel ! C 2 fuel oil pump Leaking filter None Loose filter None I
Ad)usted filter generator I 1
I 11/28/80 Diesel D diesel governor Low oil level None 'nknown None I Added oil generator I
BROWNS FERRY NUCLEAR PLANT MECHANICAL MAINTENANCE SUGARY Effect on Safe Action Taken Date System Component Nature of Operation of Cause of Results of To Preclude 12/11/80 ~ Diesel Compressor 1 Leaking line N/A Small leak N/A 1Tightened nut TR generator ',. No. 179280 I
I I
MMS: SAM 1/29/82
ENCLOSURE 6 ELECTRICAL MAINTENANCE
SUMMARY
BROWNS FERRY NUCLEAR PLANT 1976 1980
BROGANS FERRY NUCLEAR PLANT EI.ECTRICAL MAINTENANCE SU10LXRY Effect on Safe Action Taken Date System Component Nature of Operation of Cause of Results of To Preclude mtina 12/1/80 Diesel 'C'iesel Scheduled redundan None, the diesel A bad coil on The bad coil caused Replaced bad coil on generator generator start test EHI 3 generator was signal unit slow operation of the SUDR relay, completed operable duration relay SUDR relay allowing a EHI 3. SUDR relay arc to remain across operated properly. TR relay contacts 1-2 No. 194429 thus not allowing diesel generator fast start circuit to reset
~ 12/3/80 Diesel 'C'iesel Output breaker None A shorted diode in A shorted diode in Replaced shorted diode.
generator generator 1812 opened during overspeed trip overspeed trip alarm Reran surveillance surveillance test- alarm circuit circuit tripped break test; diesel generator ing (SI 4 .9.A.l.a. er 1812 operated properly. TR No. 189406 BFRO 50-259-8088 12/14/80 Diesel 'D'iesel Audio alarm relay None Diesel generator Audio alarm inoperable Replaced bad relay; generator generator was found to be ~ alarm panel relay alarm operates pro-hanging up during mechanically perly. TR No. 197031.
surveillance test- hanging up ing (SI 4.9.A.l.d)
BROWNS FERRY NBCLEAR PLANT ELECTRIC KL MAINTENANCE
SUMMARY
Ef feet on Safe Action Taken Date System Component Nature of Operation of Cause of Results of To Preclude 11/19/80 Diesel Diesel generator Alarm bell mal.- None >
Bad alarm bell Alarm bell inoperative Replaced coil; alarm generator 1A functioned I coil now operating properly.
TR No. 189469 10/6/80 Diesel Diesel generator SM EH? 3 diesel None I PFD1 coil on 3A PDF1 coil on 3A I Replaced PFD1 relay.
generator 3A generator re- diesel generator inconsistent on timingi Relay'times properly.
dundant start test ;
TR No. 176101 I
10/22/80 Diesel Exhaust fan A Exhaust fan A None <
Wire lug burned Exhaust fan A inoper- Relugged and verified generator trips out ou'c ative ~
by gA. Bumped for proper rotation and I
performed EMX 71; test I O.K. TR No. 178916 9/5/80 Di.esel 3A exhaust fan 3A exhaust fan for None Loose connection Caused exhaust fan to Tightened bolts in generator 3C diesel gene- on motor leads trip motor leads. Motor rator breaker checked 0 K TR No tripping 170560
1/30/80 System Diesel generator "B" battery charger Component Diesel generator "B" battery charger or exhaust fan Nature of Abnormal alarm will not clear r
BROlAi'S PERRY NUCLEAR PLANT ELECTRICAL MAINTENANCE None
~
SUTLER'ate Ef feet on Safe Operation of cncr~
, Bad Cause resistor of Results of Resistor burned open in diesel generator "B" charger Action Taken Tn Preclude
<'~LCLRlIrd'eplaced checked charge voltage.
Voltage same as uAu charger. Checked O.K.
TR No. 151627 resistor, 12/4/79 Diesel Diesel generator High-voltage None I Unit 3C diesel Too-high voltage Ad)usted air gap on generator 3C failed to supply 'generator
, frequenc frequency generator accept load on ,'enerator was pickup to reduce emergency load ~
supplying too-high ~
supplied voltage to.
acceptance test voltage to SSPI correct valve Checked and SSP2 O.D. TR No. 96702 BPRO 50-296/7923 9/26/79 Diesel 3ED diesel Compressor N/A Loose coil wire Compressor would not Tightened coil wire, generators generator air inoperable start checked O.K. TR compressor "B" No. 124642
BROGANS FERRY NUCLEAR PLANT ELL'Cl'RICAL NAINTENANCF. SULTRY Effect on Safe Action Taken Date System Component Nature of Operation of Cause of Results of To Preclude
)6/17/79 Diesel Diesel generator C ) Control power off N/A Coil in relay Alarm would not clear Replaced relay. Checked generator alarm will not burned up O,.K. TR No. 134472 clear 5/27/79 Standby Battery charger Battery charger N/A Failed resistor Batteries not charg- Replaced resistors, diesel A for D diesel would not charge on chargers ing placed on equalizing generator and charge, performed FHI 4, battery charger checked O.K. TR A for C diesel Nos. 125928 and 125931 generator 4/27/79 Diesel "B" air compressor Unit tripping on N/A Heat buildup Unreliable operation Hachinists filled oil generators overload trip overload because of low oil reservoir. Checked O.K.
level TR No. 126928 12/1/78 Diesel Diesel generator STOLI relay on None STOLI relay on Did not meet criteria Changed both relays.
generator C and D "C" and annunci- "C" diesel gener- of SI 4.9.A.l.d Met all criteria of ator relay on "D" ~ ator annunciator SI 4.9.A.l.d. Checked failed to operate relay bad on "D" O.K. TR No. 87915 properly per SI diesel generator 4.9.A.l.d
BROWNS FERRY NUCLEAR PLANT ELECTRICAL MAINTENANCE SUM fARY Effect on Safe Action Taken Date System Component Nature of Operation of Cause of Results of To Preclude
) 'III QtR I 12/24/78 Diesel Power fai'ure Power failure None Coil burned out Power failure alarm Replaced coil and I generator alarm for diesel alarm will not on diesel generato would not clear cleaned alarm. TR generator "A" clear control panel No. 34115 12/1/78 Diesel Pressure switch Diaphragm blown None AP2-Pressure Pressure switch Replaced pressure generator AP2 diesel gene- out on AP2 switch bad inoperable. Alarm switch. Alarm cleared.
ator 3D on TR No. 110084
~
11/8/78 Diesel .Diesel generators Perform SI None None STOLI relay was bad Replaced bad relays.
generator C and D 4.9.A.l.d on "C" diesel gene- Ran SI 4.9.A.l.d.
ator annunciator. Checked O.K. TR Relay for circuit No. 87915 nalfunction was bad on "D" diesel gene-ator 11/23/78 Diesel 480-V diesel 480-V diesel None Bad danper motor Improper ventilation Replaced damper motor.
generator generator auxili- generator auxili- Checked O.K. TR No.
ary board A ary board A. Roo 107769 ventilation supply danper remained in the open position
BROWNS FERRY NUCLEAR PLANT ELECTRICAL MAINTENANCE SUKKLRY Effect on Safe Action Taken Date System Component Nature of Operation of Cause of Results of To Preclude 11/2/78 Diesel Diaphragm on Diaphragm is blown Nnne AP2 pressure Low-pressure alarm Replaced and calibrated generator pressure switc h on AP2 switch bad was inoperable AP2. Alarm cleared
] AP2 TR No. 110084 11/24/78 Diesel 3B diesel Lube oil cir- None Bad bearings on Noise and bearing Bearings replaced.
generator generator culating pump drive motor heating up Checked O.K. TR appears to have No. 114384 bad bearing 10/18/78 Diesel "A" diesel gene- Commutator None Brushes arcing Commutator blackened Cleaned commutator and generator ator air compres- blackened because when motor started because of brush checked brushes.
sor motor of brush arcing arcing Contactor and motor windings have operated properly. TR fire damage from No. 115557 arcing brushes 10/10/78 Diesel EMI-3 diesel Diesel generator None SFDI relay on Did not meet timing Changeout'SFDI relay.
generators generators 3A, 3B, reduadent start ~ diesel generator criteria of EHI-3 Ran SI 4.9.A.l.d 3C, and 3D test 3A was out of time tested O.K. with TR No. 87901. EMI-3
BROGANS FERRY NHCLEAR PLANT EI,ECTR ICAL ))AINTENANCE SU&)ARY Effect on Safe Action Taken Date System Component Nature of Operation of Cause of Results of To Preclude
)0/16/78 Diesel air compressor Compressor will None Pressure switch Compressor would not Replaced and calibrated generator H2 diesel generator not shut off was not opening shut off and lift pressure switch.
3D safety valve Checked O.K. TR No.
106542 9/5/78 Diesel Diesel generator Lube oil heater None Loose wire I.ube oil heater not Replaced overload generator IIDII overload assembly working assembly and wires.
and wires burned Heater operated correctly.
8/1/78 Diesel Auto-manual Replace transfer None Trip coil burned switch wouldn' Replaced switch and generator transfer switch switch out transfer verified proper operation. TR No. 87800 8/8/78 Diesel 125-V battery Battery charger None Bad voltmeter on Voltmeter not reading Replaced voltmeter and generator charger "A" not reading "A" charger correctly PSO calibrated. TR correctly No. 96615
BROMNS FFRRY NUCLEAR PLANT ELECTRICAL NAINTENANCE SU.DQRY 1
Effect on Safe Action Taken 1 Date System Component Nature of Operation of Cause of Results of To Preclude I
~~'Gals. cQIXQ'QSC.
(7/8/78 Diesel Diesel generator "Control power None Bad coil on relay "Control power off" Changed out coil on l
generator "D" control power off" alarm will alarm will not clear relay. Alarm cleared..
off alarm not clear TR No. 93984 I
7/1O/78 Diesel Diesel generator Inspect all fans None Aluminum fan Fans could not turn Straightened all bent generators electrical control on control cabinet housing bent fan housings and cabinets causing fans to checked that all fans bend are operable. TR No.
85472
'7/5/78 Diesel Diesel generator 'ECR'elay bad None 'ECR'gastat bad Diesel generator 3ED Replaced agastat timed generator 3ED 'ECR'elay shutting down too Checked time O.K. TR quickly No. 93641 7/6/78 Diesel Diesel generator Breaker will not None Charging motor Breaker 1832 will not Replaced charging moto) generator 3 EC breaker 1832 operate shorted and micro- operate and microswitches. TR I switches burned up No. 93521 3/19/78 Diesel "Control power off'nnunciator "con- None NVA relay burned Alarm would not clear Replaced NVA relay.
generator alarm trol power off" up Annunciator cleared.
will not clear TR No. 83841
all 41 0
BROWNS FERRY NUCLEAR PLANT ELECTR1CAL KKINTENANCE SUNDRY Effect on Safe Action Taken Date System Component Nature of Operation of Cause of Results of To Preclude Xialfll?1CX1gJj 4/18/78 Diesel Battery exhaust Fan breaker con- None 120-V coil bad Contactor trying to Replaced coil and generator fan on diesel tacts sticking burn up checked TR No. 99231 generator 3C 3/8/78 Diesel Diesel generator Replace isolation None Isolation diodes Diesel generator "D" Replaced isolation generators I IDll diodes in annunci- on annunciator. started when local diodes in annunciator ator relays Relays short annunicator test relays. TR No. 66528 circuited. button pushed 1/19/78 Diesel Diesel generator Replace flow None Flow switches bad Exhaust fan "A" Replaced flow switch on I generator exhaust fans "A" switches on on "A" and "B" failed to start both A and B exhaust and "B" exhaust fans diesel generator fans. TR No. 97603 exhaust fan motor controls 11/22/77 Diesel Speed senser Replace speed None Bad speed sensor Potential failure of Replaced speed sensor generators relay on diesel sensor re1ay relay one start circuit. relay on diesel gene-generator 3B The second start ator 3B. TR No.
circuit was operation 79884 al 11/4/77 Di.esel. Overcurrent relays Change out nylon None Nylon spools in Nylon spools were New coils were in-generators spool coils coils changed out stalled. TR No. 64444
BROVNS PERRY NDCLEAR PLAZA ELECTRlCAL MAINTENANCE SU%1ARY Effect on Safe Action Taken Date System~ Component Nature of Operation of Cause of Results of L P cl de
,11/2/77 Diesel Voltage supply Change out nylon None Nylon spools in Nylon 'spools were New coils were in-transfer and over spool coils
~
generators ) coils changed out stalled. TR 1'o. 64443 current relays 9/22/77 Diesel Exciter field Diesel generator None Defective fuse in Diesel generator "3D" Replaced fuse and in-generator ~
circuit fuse "3D" tripped on exciter field tripped on oversoeed creased spring pressure, overspeed circuit and poor on fuse clip. BPRO electrical conn- 296/7720 TR No. 65330 ection because of insufficient fuse clip spring pressure 9/23/77 Diesel Battery charger Load resistor in None Load resistor in Battery charger has Replaced load resistor generator I IAI~
battery charger battery charger no voltage output in battery charger.
IIAI
~
is open is open TR No. 66062 5/19/77 Diesel Battery cell Replace cracked None la@roper instal- Stress cracking in Replaced cells and generator cell lation of battery battery )ars read)usted battery "B" 125-V dc racks racks. Special Electrical Maintenance Xnstruction 3.
BROIIFNS FERRY NUCLEAR PLANT EI.ECTRICAL MIIITENANCE SUllARY Effect on Safe Action Taken of Results of To Preclude Date System Component Nature of Operation of
~ann~ Cause l
A/21/77 Diesel Diesel generator ; Replace motor None Bad motor bearings Lube oil pump will Replaced both bearings, generator 3B lube oil pump ,'earing not run reinstalled pump motor and tested. TR No.
78677 I
12/7/76 Diesel Diesel generator I
! Replace start None Faulty speed Failure of start. Replaced speed sensing generator "3D" speed sensing; circuit No. 1 sensing relay on Checked No. 1 to relay on "3D" BFRO 296/ I relay speed sensing diesel generator function properly on 76I9 li relay I IDII start of diesel generator l
I 12/29/76 Diesel Diesel generator Repair fuse None PT fuse clip Diesel generator Repaired fuse block generator 3A contacts on PT broken during would not come up to contacts. TR No. 59831 I fuse block maintenance voltage 12/31/76 Diesel "3D" diesel Rebuild starter None Burned contacts on "3D" diesel generator Rebuilt starter on air generator generator air contacts starter compressor "A" will compressor "A" TR No.
compressor "A" not run 60298
BROWNS FERRY NUCLFAR PLANT FLECTRICAL MAINTENANCE SLAVERY Ef feet on Safe Action Taken Date System Component Nature of Operation of Cause of Results of To Preclude llQ'.
11/3/76 Diesel Woodward govenor Chango oil in None Dirty nil in Diesel generator Changed oil in generator hydraulic hydraulic actuator hydraulic exhibited erratic hydraulic actuator I IDII actuator actuator behavior BFRO 259/7623 11/26/76 Diesel Diesel generator Replace relay in Relay in speed Replaced relay in speed generator 3D start circuit speed sensing sensinc circuit sensing start ci.rcuit.
circuit failed BFRO 296/7619 1/23/76 Diesel Diesel generator Changeout diesel Hone End .of 5-year Diesel generators "B" I Replaced battery on generator batteries generator batterie battery life "C" batteries I'nd diesel generators "B" IIBII and IICII exceeded vould not hold and "C" diesel generators charge RCS: SAM 1/27/82
ENCLOSURE 7 Additional Comments
- l. It is estimated that each diesel generator has (inadvertently) started 36 times a year automatically. These starts are not recorded.
- 2. The maintenance record indicates a successful start with an "X" under starts. It indicates the number of runs in each start with the numeral indicated. The length of the run and whether it was scheduled or unscheduled is also indicated. The last column indicates if the maintenance instruction was performed because other equipment was inoperative and the start was required by technical specifications.
- 3. It could not be determined whether the reactor was shut down or not when maintenance was performed.
- 4. The modification record indicates all modifications performed on the diesel to date.
- 5. The computer printout is TVA's list of all the Licensee Event Reports on the diesel generators for the time period indicated.
- 6. The maintenance summaries are all the trouble reports (TR) that have been performed on any of the diesel generators or equipment associated with them for the requested period.
e-