Text
po TIME RAN R ARON A T DATE 12-26-79 12-18-79 12-11-79 7-25-78 5-30-78 5-23-78 4-18-78 3-14-78 2-28-78 2-21-78 gl-23-78 1-17-78 1-4-78 8-1-78 10-24-78 10-10-'78 9-27-78 11-27-'79 11-20-79 D/G D
3D.
3D 3B 3A 3C 3B 3B 3A 3C 3A 3A 3C 3A A
. START LOADED X
X X
X UNLOAD I.OADED UNI.OAD 10 MIN 10 MIN 10 MIN 10.MIN 10 MIN 10'IN 10 MIN 10 MIN 10 MIN 10 MIN 10 MXN 10 MXN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN SCH X
X X
X X
X X
11-14-79 10 MIN 11-13-79 10-16-79 10-2-79 8-27-79 8-22-79 8-1-79 9-25-79 9-18-79
.9-10-79 9-5-79 11-28-78 11-14-78 12-12-78 1-23-78 1-17-78
'12-21-78 A
3B 3D 3D A
X'0 MIN.
10 'MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MXN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MXN X
X X
X X
X X
X
ENCLOSURE 1
MAINTENANCE RECORD OF DIESEL GENERATOR RUNS AT BROWNS FERRY NUCLEAR PLANT
DATE 78 2-8-78 3-28-78 3-7-78 4-12-78 4-4-78 5-30-78'<<6-78 7-18-78
.8-29-78 8>>7-78 8-1-78 9-26-78 9<<19-78 9-19-'78 9-5>>78 10-31-78 F10-24-78 11<<28-78
- 8 2-26-78 2-12-78 8-29-79 8-14-,79 8-1-79 9-4-79 10-30-.79 10-16-79 10-2-79 1-30-79 1-30-79 2-27-79 2-20-79 D/G A
A 3A 3C 3A 3B 3B 3D 3B 3C pa START LOADED X
X X
0%
UNLOAD TIME LOADED UNLOAD 10 MIN 10 HIN 10 MIN 10 MIN 10 HIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 HIN 10 MIN 10 HIN 10 MIN 10 MIN 10 MIN'0 MIN SCH X.
X X
X X
X X
X X
'X
I
5
~
~
5-i o)
MMI 6 00 0
ht TIME RAN DATE D/G START LOADED UNLOAD LOADED UNLOAD SCH 3-29-79 3-20-79 3-5-79 4-24-7 4-18-79 4-3-79 5-22-79 5-15-79 5-9-79 6-26-79 6-19-79 6-5-79 7-17-79 7-25-79 7-10-79 7-5-79 9-30-80 9-30-80 25-80 9-17-80 9-10-80 10-30-80 10-28-80 10-22-80 11-25-80 11-18-80 11-11-80 12-28-80 12-16-80 12-14-80 12-9-80 12-2-80 12-1-80 1-28-79 12-12-78 2<<27-'79 A
A C
B D
3B 3D 3C X
10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN X
X X
X X
MMI 6 pe TIME RAN DATE 2-20-79 2-5-79 3-20-79 3-13-79 4-11-79 4-3-79 5-22-79 5-16-79 6-19-79 7-11-79 7-10-79 7-5-79 1-22-80 1-15-'80 D/G 3B 3D 3B 3A 3A 3D 3C 3B 3C 3D 3B 3A 3B 3A START LOADF.D X
UNLOAD LOADF.D UNLOAD 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN SCH X
X X
X X
X 80 1-2-80 2-27-80 2-20-80 3D 3C 3C 3B 10 MIN X
10 MIN 10 MIN 10 MIN 2-5-80 2-1>>80 3-11-80 4-27-80 4-16-80 4-9-80 5-27-80 5-13-80 5-7-80 6-18-80 6-17-80 6-10"80 7-29-80 7-23-80 9-18-79 9-10-79 9-5>>79'1-3.4-79 3D 3B 3A 3D 3B 3A 3D 3B 3A 3D 3C 3D 3A 3D X
X X
X 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10, MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN X
X X
X
)
~
MMI 6 pe TTME RAN REASON T
7 DATE 11-13-79 10-16-79 10-2-79 11-27<<79 11-20-79 12-26-79 12-18-79 12-11-79 1-30-80 1-22-80 1-15-80 2-27-80 2-20-80 2-12<<.80 2-5-80 2-1-80 3-25-80 3-11-80 4-29-80 4-23-80 4-16-80 4-8-80 5-27-80 5-20-80 5-6-80 6-17-80 6-10-,80 7-29-80 7-23-80 7-15-80 7-1-80 8-26-80 8-21>>80 8-13-80
~ ~,
8'-6'-80.
D/G A
A A
A START LOADED UNLOAD LOADED UNLOAD 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN SCH X
X X
X
0".
T1ME RAN R ASOV DATE 3-30-77 3-3-77 3-7-77 D/G START LOADED UNLOAD X
X X
LOADED UNLOAD SCH 10 MIN 10 MIN 10 MXN 4-4-7 4-5-77 5-31-77 5-24-77 5-10-77 5-3-77 5-3-77 6-31<<77 6-28-'7 7-10-77 7-7-77 8-30-,77 8<<7-77 9-27-77 9-10<<77 9-6-77 10-25-77 10-10-77 10-4-77 11-28-77 12-27-77 12-19-77 12-6-77 2-1-76 1-2-76 7-14-76 8-31-76 9-28-76 9-20-76 9-13>>76 9-5-76 10-4-76 11-23>>76 A
A A
3D 3D 3B 3A 3A 3D 3C 3B 3B 3A X
X X
X 10 MXN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MXN 10 MIN 10 MIN 10 MIN 10 MXN 10 MIN 10 MXN 10 MIN 10 MIN 10 MXN 10 MIN 10 MIN 10 MIN 10 MXN 10 MXN 10 MIN 10 MIN 10 MXN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN X
X X
X X
X X
X X
X X
X
TIME RAN DATE D/G START LOADL'D UNLOAD LOAI)ED UNLOAD SCU 11-2-76 12-7-76 1-20-76 6 3-21-76 3<<5-76 3-2-76 5-19-76 5-3-76 5-5-76 5<<5-76 6-27-76 6-15-76 6-'7-76 7-7-76 8-30-76 8-24-76 76 11-16-76 11-2-76 12-21-76 12-14-76 12-7-76 3B 3C D
A 3D A
X X
X X
X 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 HIN 10 MIN 10 HIN 10 HIN X
X X
X X
X X
X X
X X
X
DATE 80 80 9-26-79 3-29-79 9-24-78 3-24=78 3-29-77 D/G 3A 3B 3C 3A 3B 3C 3D 3A 3B 3C 3D 3A 3B 3C 3D 3A 3B 3C 3D 3A 3B 3C 3D 3A START LOADED X
X X
X X
X X
UNLOAD TTME I.OADI'.D 2 HR 2
HR 2 HR 2 HR 2 HR 2 HR 2 HR 2 HR 2 HR 2
HR 2 HR 2 HR 2 HR 2 HR 1 HR 1 HR 1 HR 1 HR 1 HR 1 HR 1 HR 1 HR 1 HR RAil UNI.OAD 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN SCH X
X X
X R
SON 10-8-77 3B 3C 3D 3A 3B 1 HR 1 HR 1 HR 1 HR 1
HR 15 MIN X
15 MIN 15 MIN X
15 MIN 15 MIN 6-15-76 3C 3D 3A 3B 3C 3D 1 HR 1
HR 1 HR 1 HR 1 HR 1 HR 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN X
X X
>t SI 4'9.A.4.B DATE D/G START LOADED TIME RhN UNLOAD LOADED UNLOAD SCH 9<<30-.76 3-28-80 11<<21-80 10-.3-79 3>>28-79 4-4-78 10-5-78 10-12-77 4-1-77
~
3A 3B 3C 3D A
X X
1 HR 1 HR 1 HR 1 HR 2 HR 2 HR 2 HR 2 HR 2 HR 2
HR 2 HR 2 HR 2 HR 1 HR 1 HR 1 HR 1 HR 1 HR 1 HR 1 HR 1 HR 1 HR 1 HR 1 HR 1 HR 1 HR 1 HR 1 HR 1 HR 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN X
X X
X X
X
po TIME RAN RAONSR DATE D/G START LOADED UNLOAD LOADED UNLOAD scn 2-6 6 B
B C
X 1 HR 1 HR 1 HR 1 HR 1 HR 1 HR 1 HR 15 MIN X
15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN X
X
1 i ~ eg EMI 3 DATE 1-6-76 D/G po START LOADED X
O I'NLOAD TIME RAN LOADED UNLOAD SCH 15 MIN 11-1-78 7-19-79 B
B 3A 3B 3C 3D B
3A 3B 3C 3D 3A 3B 3C 3D X
HR 1 HR 1 HR 1 HR 1 HR 1 HR 1 HR 1 HR 1 HR 1 HR 1 HR 1 HR 1 HR 1 HR 1 HR 1 HR 1 HR 1 HR 15 MIN 15 "MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN X
X X
X X
X X
X
SI TIME RAN DATE D/G START LOADED UNLOAD LOADED UNLOAD SCH 4-24-78 4-18-78 4-11-78 3C 38 3A X
X 25 MI 5-23-78 5-30-78 5-16-78 5-9-78 5-3-78
'6-20-78 6-13-78 6-6-78 8-29-78 8-23-78 8-15-.78 8-7-78 9<<26-78 9-19-78 9-12-,78 9-5-.78 1-2<<80 1-8-80 1-15-80 1-22-80 1-30-80 2-5-80 2-12-80 2-20-80 2-27-80 3-4-80 3-11-80 3-19-80 3-25-80 4-1-80 4-8-80 4-16-,80 3C 3D 38 3A 3D 3C 38 3A B
A 8
C 8
X X
X X
25 M
25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN X
X X
X X
X X
X
SI 4.9.A.1.A DATE 4-21-80 4-29-80 D/G D
START LOADED UNLOAD TIME RAN LOADED UNLOAD SCH 25 HIN 25 MIN R.A ON S
..5-.6-80 5-14-80 5-20-80 5-27-80 6-3-80 6-10-80 6-17-80 9-30-80 9-24-80 9-16-80 9-9-'80 6-25,-80 7-29>>80 7-23-80 7-15-80 7-9-80 7-1-80 8-6-80 8<<26-80 8-21-80 8-12-80 1-30-80 1-22-80 1-15-80 1-8-80 2-27-80 2-20-80 2-15-80 2-5-80 3-27-80 3-26-80 3-19-80 3-11-80 3-4-80 A
3B 3A 3D 3C B
3C 3B 3A 3C 3B 3A 3D 3A 3C 3B 3A 3D X
X X
X X
X X
X X
X X
25 HIN 25 MIN 25 HIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 HIN 2S MIN 25 MIN 25 MIN 25 MIN 25 HIN 25 MIN 25 HIN 25 MIN 25 MIN 25 HIN X
X X
X X
X X
SI A
A DATE D/G START LOADED UNLOAD TIME LOADED UNLOAD SCH R
4-29-80 6-23-80'-16-80 4-1 80 4-29-80 5-27-80 5-20<<80 3D 3C 3B 3D 3A 3D 3C X
X X
X 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN X
5-13-80 3B 25 MIN X
5-7-80 6-10-80 6-3-80 6-'3-80 6-25-80 6>>18-80 6-17-80 10>>2-79 10-9-79 10-16-79 10-23-79 9-4-79 9-10-79 9-19-79 9-26>>79 8-1>>79 8-7<<79 8-'14-79 8-21-79 8-29-79 7-3-79 7-10-79 7-11-79 7-19-79 7-25-79 6-5-'79 6-12-79 3A 3B 3A 3C 3D 3D 3C
'B 3C 3D 3A 3B 3C 3D 3A 3A 3B 3C 3D 3A 3A 3B 3D 3C 3D 3A 3B X
X X
-X 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25'MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN X
X X
X
SI 4.9.A.l.A TIME RAN RF 03 DATE 6-14-79 6-19-79 6-26-79 6-26-79 6-19-79 6-12-79 6-5-79 7-25-79 7-17-79 7-10-79 7-3-79 8-29-79 8-22-79 8-14-79 8-7-79 8-1-79 9-25-79 9-18-79 9-10-79 9-4-79 10-30-79 10-23-79 10-16-79 10-13-79 10>>10-79 11-21-79 11-20-79 11-14-79 11-13-79 11<<6-79 12-26-79 12-18-79 12-11-79 12-4-79 11-21-79 11-21-79 D/G 3C 3C B
A C
B D
B A
D B
3C 3A START LOADED UNLOAD X
X X
X X
X LOADED 25 MIN 25 MXN 25 MIN 25 MIN 25 MIN 25 HIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 HIN 25 MIN 25 MIN 25 MIN 25 HIN 25 MIN 25 MIN 25 MIN 25 HXN 25 MIN 25 MIN 25 MIN 25 MXN 25 MIN 25 MIN 25 MXN 25 HXN 25 MIN 25 MIN 25 MIN 25 HIN 25 MIN 25 MXN UNLOAD SCH X
X X
X X
X X
X X
X
SI 4.9.A. 1.A TIME RAN RE 0
S ART DATE 11-13-79 11-6-79 11-27-79 11-27-79 12-26-79 1'2-18-79 12-12<<79 12-5-79 1-30-78 1-23-78 1-17-78 1-13-78 2-7-78 2-27-78 2-21-78 2-14-78 3-27-78
,3-21-78 3-14-.78 3-8-78 1-3-79 1-23-79 1-16-79 1-11-79 2-13-.79 2-6-79 2-20-79 2-27-79 3-5>>79
,3-28-79 3-20-79 3-13-79 5-30-79 5-22-79 5-15-79 5-9-79 D/G 3D 3C 3B 3B 3A 3D 3C 3C 3B 3A 3B 3D 3C 3B 3A 3C 3B 3A 3D D
A D
B B
A START LOADED UNLOAD X
X X
X X
X X
LOADED 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN UNLOAD SCH X
X X
X X
X X
X X
X X
X
SI 4.9.A.1.A TIME RAN R.ASON S
RT DATE D/G START LOADED UNLOAD LOADED UNLOAD SCH UXR 5-2-79 4-24-79 4-17-79 4-11-79 4-3-79 10-3-78 10-10-78 10-17-78 10-31-78 10-24-78 10-18-78 10-20-78 11-28-78 11-21-78 11-16-78 11"9-78 12-12-78 12-19-78 12-26-78 1-10-78 1-4<<78 1-17-78 1-30-78 1-23-78 2-27-78 2-21-78 2-14-78 B
A B
B A
A B
B D
C A
B A
X X
25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 2S MIN 2S MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 2S HIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 HIN 25 HIN 25 MIN
.X X
X X
X X
X X
X 2-7-78 25 MIN 3-28-78 3-20-78 3-14-78 3-7-78 5-2-.78 4-25-78 4-18-78 4-12-78 C
B B
A 25 MIN 25 MIN 25 MIN 25 HIN 25 MIN 25 MIN 25 MIN 25 MIN X
X X
SI A
TIME RAN R
ONS R
DATE D/G START LOADED UNLOAD LOADED UNLOAD SCH 4-4-78 5-30-78 5-23-; 78 5-16>>
8
'5-9-78 6-27-78 6-20 78 6-14-78 6-6-78 7-25-78 7-18-78 7-11-78 7-4-78 6-27-78 7-25 78 7-18-78 7-11'-.78 7-4"78 8-29.-78 8-23-78 8-17-78 8-7-78 8-1<<78
~ 9-27-78 9-19-78 9-12-78 9-5-78 10-24-78 10-17-78 10<<10-78 10-3-78 1-30-79 1-23-79 1-16-79 1-12-, 79 2-27-79 D
A 3D 3D 3C 3D 3A 3A 3D 3C 3B 3A 3A 3D 3C 3B 3A 3D 3B 3B 3A 3B 3C X
~
X X
X X
X X
25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN X
X X
X X
X X
X
.A DATE 9 2-13-79 2-6-79 3-27-79 3-20-79 3-13-79 3-5-79 4-25-79 4-17-79 4-11-79 4-3-79 5-30-79 5-22-79 5-16-79 5-2-'79 5-8-79 11-21-78 11<<14-78 11-7-78 11-1-78 11-28-78 12-26-78 12-19-78 12-12-78 12-5-78 10-28-80 10-22-80 10-14-80 10-7-80 10-2-80 11-25-80 11-18>>80 U.-11-80 11-5-80 12-14-80 12-22-80 D/G 3B 3A 3D 3C 3B 3A 3D 3C 3B 3A 3D 3D 3C 3B 3D 3A 3A 3D 3C 3B 3B 3B 3A 3C 3B 3A, 3D 3C 3A 3B 3A 3D 3C 3D 3A START X
X X
X' X
ADED UNLOAD TIME LOADED 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 HIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 HIN 25 MIN 25 MIN 25 MIN 25 MIN UNLOAD SCH X
X X
X X
X X
~
~
~ g
~ ~
p I
SI 4.9.A.1.A TIME RAN 01SAT DATE 12-11-80 12-2-80 9-30-80 9-25-80 9-16-80 9-9-80 9-2-80 10-28-80 10-22-80 10-15-80
, 10-7-80 11-25-80 11-19-80
'11-11-80 11-4-80 12-31-80.
12-23-80 12-16-80 12-14-80 12-9-80 12-2-80 7-29-80 7-23-80 7-16-80 8-8-80 8-6-80
'-26-80 8-21-80 8-12-80 D/G 3D 3C.
C B
D B
3A 3D 3C 3A 3B 3A 3D 3C START LOADI D X
X X
UNLOAD I.OADl:D 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN.
25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN 25 MIN UNI.OAD SCil X
X X
X X
~yah
~
I a, SI 4.9.A.4'.A 0
0 0%
TIME RAN DATE 11-1-76 10-26-80 6-5-80 4-27-79 D/G 3A 3B 3C 3D 3A 3B 3C 3D A
D 3A 3B 3C 3D A
3A 3B 3C 3D START X
X LOADED UNLOAD LOADED UNLOAD 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 HIN 15 MIN 15 MIN 15 MIN 15 MIN SCH X
X X
X
'X
.SI 4.9.A.4.A Oe TIME RAN
- DATE, D/G START LOADED UNLOAD LOADED UNLOAD SCH 4-27-79 A
B 3A 3B 3C X
15 MIN 15 MIN 15 MIN 15 MIN 15 MIN
, X 15 MIN 15 MIN 10-24-79 3D X
X 15 MIN 15 MIN 15 MIN 15 MIN X
4-28-78 3A 3B 3C 3D
,X 15 MIN X
15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 3A 15 MIN 15 MIN 15 MIN X
3B 3C 15 MIN X-15 MIN 11-2-78 3D 15 MIN 15 MIN 15 MIN X
X 3A 3B 3C 3D X
15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN X
X e" ~ ~
4
T1MI'. 1(AN Rt
'Og
~ ~
~
~
DATE D/G START LOADED UNLOAD LOADED UNLOAD SCIi
-76 6-2-76 3A 3B 3C 3D A
X X
X X
X 15 HIN 15 MIN 15 HIN 15 MIN 15 MIN 15 HIN 15 MIN 15 MIN 15 MIN 15 MIN MIN X
X X
X X
X X'
15 MlN
'A 3B 3C 15 MIN 15 MIN 15 MIN X
3D X
15 MIN 5-7-77 10-31-77 3A 3B 3C 3D B
3A 3B 3C 3D 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN X
X
a. * " 'SI 4.9.A.Z.A po TIME RAN DATE 7-30-77 D/G START X
LOADED UNLOAD LOADED 10 MIN 10 MIN 10 MIN 10 MIN UNLOAD 'CH 5 MIN" 5 MIN 5 MIN 5 MIN 1-25-77 7-30-77 2-22-78 2-14-77 2-15-77 8-16-77 8-17-77.
6-13-76 3A 3B 3C 3D 3A 3B 3C 3D 3A 3B 3C 3D 3A 3B 3C 3A 3B 3C 3D 3A 3B 3C 3D X
X X
X 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN
,5 MIN 5 MIN 5 MIN 5 MIN 5 HIN 5 MIN 5 HIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 HIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN X
X X
X X
X X
~,
4
DATE 6-13-76 8-21-76 8-21-78 2-22-80 2-22-80 7-22-80 7-22-80 2-22-80 2-22<<80 D/G 3A 3B 3C 3D 3A 3B 3C 3D 3A 3B 3C 3D A
3B 3C 3D 3A 3B 3C 3D 3A 3B 3C 3D 3A 3B 3C 3D 00 START LOADED UNLOAD
.2 X
X X
TIME LOADF.D 10 HIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MXN 10 MIN 10 MIN 10 MIN 10 HIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 HIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 HIN 10 MIN 10 MIN UNLOAD SCH 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN
.5 MIN 5 MIN 5 MIN 5 MIN 5 HIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN RF.. ON S
A
t 0
~
SI 4'.9.A.3.A TIME RAN R.
0 DATE 7-22-80 7-22-80 8-10-79 8-10-79 7-24-79 7-24-79 2-5-80 2-5-80 1-22-79 D/G A
3A 3B 3C 3D 3A 3B 3C 3D A
A A
A START X
X X
X X
Xi X
X
,X LOADED UNLOAD LOADED UNLOAD 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN MIN 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN 10 MIN 5 MIN SCH X
X X
X X
X
~ ")
) 'i4 0%
TIME RAN REASON DATE 1-22-79 8-3-78 8-3-78 2-13-79 D/G B
3B 3C 3D
~START LOADED UNLOAD LOADED 10 MIN 10 HIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 HIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN UNLOAD 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN SCH X
X 2-13-79 8-18-79 8-11-78 1-31-78 1-31-'78 3A 3B 3D 3A 3B 3C 3D 3A 3B 3C 3D X
-X 2
2 10 MIN 10 MIN 10 HIN 10 HIN 10 HIN 10 HIN 10 MIN 10 MIN 10 MIN 10 MIN 10 HIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 5 MIN 5 MIN 5 HIN 5 HIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 HIN 5 MIN 5 HIN 5 MIN 5 MIN X
X
I a
~
A SI 4.9.A.
.D Pd TIME RAN R
ON T
DATE 12-27-'76 12-28-76 6-14-77 4-19-77 7-28-77 6-14-77 D/G 3A 3A 3D 3B 3B 3D START X
LOADED UNLOAD LOADED 90 MIN 90 MIN 90 MIN 90 MIN 90 MIN 90 MIN.
UNLOAD 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN SCH X
1-11-78 3A
.90 MIN 10 MIN 12-15-77 11>>4-77 10-9-77 10-8-77 11-6-77 7.-6-78 6-22-78 7-11-79 6-14-79 1-11-79 11-15-78 10-20-78 11-21-79 11-20-79 10-13-79 10-10-79 4-12-79 6-18-80 2-20-80 1-21-80 12~13-80 10-30-80 10-4-80 10-3-80 6-17-80 A
3D 3D 3D 3C 3B A
3D 3B 3A 3D 3D X
X X
X X
X 90 MIN 90 MIN 90 MIN 90 MIN 90 MIN 90 MIN 90 MIN 90 MIN 90 MIN 90 MIN 90 MIN 90 MIN 90 MIN 90 MIN 90 MIN 90 MIN 90 MIN 90 MIN 90 MIN 90 MIN 90 MIN 90 MIN 90 MIN 90 MIN 90 MIN 90 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN
'0 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN 10 MIN X
X X
0
SI 4.9+A+1.B 100%
0%
TIME RAN R A 03 TAR DATE 12-5-79 3-7-80 1-17-79 11-17-78 12-16-'7 5-31-76 I
4-15-76 6-3-76 D/C 3A 3B 3C 3D 3D B
B 3A 3B 3C'D B
B 3A 3B 3C 3D 3D START X
X X
X X
X X
X LOADED UNLOAD LOADED 15 HIN 15 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 HIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 1
MI 15 HIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN UNLOAD 5 HIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5 MIN 5
M 5 MIN 5 HIN 5 HIN 5 MIN 5 MI 5 MIN 5 MIN HIN MIN SCH X
X X
SI 4.9.A.l.
Su lement A DATE 2-16-78 1-12-78 11-4-78 3-31-78 4-30-78 5-30-78 6-22-78 10-14-78 7-28-78 10-21-78 D/G 3A 3B 3C 3D 3C 3D 3A 3B 3C 3D 3A 3C 3D 3A 3B 3C 3D 3A 3B 3D 3A 3B 3C A
C'TART LOADED X
UNLOAD TIME RAN LOADED UNLOAD SCH 15 MIN, 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN
~ I fr r
~
SI 4.9.A.
S TIME RAN DATE D/G START LOADED UNLOAD LOADED UNLOAD SCH 2-12-78 A
X
~
1 M N
'0 5-2-78 5>>22-78 5-23-78 5-23-78 6-27-78 6-30-78 7-30-78 8-22-78 B
B D
3A 3B 3C 3D B
D B
3A 3B 3D 3A 3B 3C 3D 3A 3B 3C X
X
-X 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN
SI 4.9.A.1.
Su lement A
DATE D/G.
START LOADED UNLOAD TIME RAN LOADED UNLOAD SCH R
OV 10-14-78 1-16-79 6-14-79 7-11-79 8-4-79 11-25-79 12-26-79 12-26-79 11-27-79 12-7-79 3A 3B 3C 3D 3A 3B 3C 3D 3A 3B 3D 3A 3B 3C 3A 3B 3C 3D 3A 3B 3C 3D 3A 3B 3C 3D A
X X
X X
X X
15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15MN 15 MIN 15 MIN 1
M 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 HlN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN X
SI 4.9.A.l.
Su lement A DATE 11-7-79 9-27-79 10-9-79 8-4-79 7-10-79 6-1-79 4-16-79 1-25-79 12-29-78 D/0 B
START LOADED UNLOAD X
X X
X
-X X
TIME LOADED 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 HIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 HIN 35 MIN 15 HIN 15 MIN 15 MIN 15 MIN RAN UNLOAD SCH
SI A
TIME RAN R
ON DATE D/G START LOADED UNLOAD LOADED UNLOAD SCH 11-2-78 1-8-80 B
C A
X 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN X
B 15 MIN 1-8-80 1-30-80 1-31-80 2-1-80 2-2-80 2-5>>80 2-6-80 2-7-80 A
B A
B A
A A
B X
X X
15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN X
X X
SI 4.9.A.1. Supplement DATE 2-8-80 2-9-80 2-12-80 2-16-80 3-1-80 3-2-80 3-10-80 3-12-80 D/G B
B
.B B
A B
B B
A B
B START LOADED X
X X
X X
UNLOAD TIME RAN LOADED UNLOAD SCH 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15,MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN R
A 'AN, ART X
X X
.X X
X
SI 4.9.A.1.
SU lement A
TIME RAN DATE D/G START LOADED UNLOAD LOADED UNLOAD SCH 3-18-80 4-11-80 4-12-80 6-28-80 6-25-80 6-24-80 6-23-80 6-22-80 6-21-80 B
D A
B A
B D
A B
B B
D A
B D
B X
X X
X X
X X
X X
X X
- X X
15 MIN 15 MIN 15 MIN 15 HIN 15 HIN 15 MIN 15 MIN 15 MIN 15 HIN 15 MIN 15 HIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 HIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 HIN 15 MIN 15 HIN 15 MIN 15 MIN 15 MIN
If
SI 4.9.A.1.
Su e
DATE 6-20-80 6-6-80 5-12-80 5-1-80 4-16-80 4-15-80 4-14-80 4-13-80 D/G A
B D
B D
C D
B B
A B
C START LOADED UNLOAD TIME RAN LOADED UNLOAD SCH 15 HIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 HIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 HIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 HIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 MIN 15 HIN 15 MIN R h ON S
AR X
X X
X X
X X
X X
X X
X i
I 0
ENCLOSURE 2 MODIFICATIONS OF DIESEL GENERATORS AT BROWNS FERRY NUCLEAR PLANT 1976 1980
0
Item Descri tion "82-1 Modify diesel generator air start air compressor discharge piping to allow for easy maintenance (Complete) 82-2 Canceled 82-3 Install blowoff valves in air supply lines on diesel generator units (Complete) 82-4 Mimic buslight change panel 9-8 (Complete) 82-5 Diesel generator air start system modification work along with item 82-6 (Complete) 82-6 Modify generator air start supply piping work with item 82-5 (Complete) 82-7 Canceled 82-8 Remove nameplates on diesel generator main control board panels 5 and 8
82-9 Add manual start switch to fuel oil transfer pump No.
1 (Complete) 82-10 Install cables and change circuits for long-term diesel generator use (Complete) 82-)'1 Revise diesel generator battery ventilation system (Complete) 82-12 Install 100-ampere fuses in diesel generator field circuit 82-13 Add rembvable panels between A, B, C, and D air intake and exhaust plenums, el 583.50, diesel generator building 82-14 Rewire diesel generator protective relaying circuitry to enable diesel generator loss of field trip (NFL D-B), etc.
82-15 Replace NVR relay with VSR relay on temporary basis (Canceled) 82-16 Install drain cocks in bottoms of standby diesel generator engine tanks (day tanks) providing drains from the lowest points 82-17 Interlock synchronizing switches so that only one may energize synchronizing circuit stop time (Canceled)
Replace stiff, 300 MCM battery cables with flexible 1/10 cables Diesel generators A, B, C, and D Install isolation valve on air line to air start motors approximately 66 inches above diesel catwalk on south side of diesel engine Replace existing speed sensing panels with solid-state speed sensing panels on all eight diesel generators Diesel generator building (HVAC) Install physical barriers in ductwork Install new gear-type vibration dampers in place of existing ones (emergency diesel engine)
Add second lube oil circulation pump to ensure constant circulation, etc.
Modify piping; add a dc oil pump, etc.
Emergency diesel engines When new heavy-duty drive gear turbochargers are installed, install new redesigned turbospring drive gears
vnkt 2 Item Descri tion 82-1 Inspect wiring at HS-82-1, panel 9-8 (Complete) 82-3 Revise load scheduling logic on core spray pumps (Complete) 82-4 82-6 82-7 Canceled Reroute cables (Complete)
Canceled 82-8 Remove nameplates Diesel generator main control
- board, panels 5 and 8 (Complete) 82-9 82-10
, 82-11 Canceled Canceled Replace existing speed sensing panels with solid-state speed sensing panels on all eight diesel generators 82-12 Add a second lube oil circulation pump; modify piping; add a dc oil pump, etc.
Unit 3 Item 82-23 Descri tion Units 1 and 2 diesel generator 480-V load shedding annunciation cleanup (See 0-82-4) 82-25 Install H6 valves in diesel generator building cooling system (Complete) 82-26 Purchase and install moisture traps in unit 3 (Complete) 82-27 82-28 82-29 Purchase of pressure reducing valves (Complete)
Diesel generator building dampers (Complete)
Revise diesel generator battery ventilation system (Complete) 82-30 Provide additional synchronizing scope or move equipment for easy visibility 82-31 Install shim to prevent coil assembly of potential transformer from moving on laminated iron core 82-32 Replace spring-loaded primary pontential transformer fingers with shoe-type assembly 82-33 Add thermostat controlled fan and damper in mechanical equipment rooms A and B, el 595 82-34 Install 100-ampere fuses in diesel generator field circuits 82-35 Rewire diesel generator protective relaying circuitry to enable diesel generator loss of field trip (NFLD-B), etc.
82-36 Replace Exide batteries and racks with'SD batteries and racks like units 1 and 2 (Complete) 82-37 Install drain cocks in the bottoms of standby diesel generator engine tanks (day tanks) providing drains from the lowest points 82-38 Interlock synchronizing switches so only one may energize synchronizing circuit at any one time (Canceled)
~,
Change the valve of RE2 (speed sensing panels 1 and 2)
(Canceled)
Install isolation valve on each air line to the two air start motors Changed structural member M6X22.5 to M6X20 and other minor changes.
Drawing 44N271-Ol (Complete)
Install blowoff valve 5 in bottom of strainer (by Bruce) located in air supply line on diesel unit (Complete)
Field to purchase replacement reservoir with sight glass for No. 10-003-073, 45 quick fill cap No. 418-001-012 and filler hand (Complete)
Add 4 diesel generator and associated switchgear motor control batteries, water chillers, centers, annunciators, cooling water (Complete)
TS-82-3D water immersion heater control switch inoperative (Complete)
Install cables and change circuits if necessary to allow paralleling of diesel generators A and
- 3EA, B to 3EB, C and B, 3EC, D to 3ED for long-term diesel generator use (Complete)
Replace burned cable from unit 3 panels 9-32 and 9-33 for PASA and CASA logic to unit 1 diesel (Complete)
Repair fire damaged cables between unit 3 and units 1 and 2 diesel generators (Complete)
Install the following:
Four l-l/2 inch flex coupling hoses; eight 3/4 inch coupling for relief valves; Four l-l/2 inch gate valves; 1/2 inch 600 WBE and moisture traps (Complete)
Complete BF on test (Complete)
f~
82-41 Replace existing speed sensing panels with solid-state speed sensing panels on all eight diesel generators 82-42 Diesel generator (lube oil system) - Addition of second oil pump, modify piping, add dc oil pump 82-43 Provide physical barrier for diesel generator building HVAC ductwork 82-44 Emergency diesel engine When present dampers are removed, replace with new gear-type vibration dampers 82-45 When new heavy-duty drive gear turbochargers are installed, remove existing turbo spring drive gears and install new redesigned turbospring drive gears DJMS:DJL 1/8/81
ENCLOSURE 3 LXCENSEE EVENT REPORTS BROWNS PERRY NUCLEAR PLANT 1976 1980
BFNP LICENSEE EVENT REPORT SYSTEM 082 BY DATE AND UNIT 9/1/81 ITEH NO.
76 LER 7'1047W 001 082 FM 73/12/19 EA 73/12/28 B093 RELAYX 73/12/28 EH EVENT - D/G A could not start IU1R pump 2A and pump motor tripped on overcurrent.
CAUSE - D/G voltage regulator failed.
REILARKS/STATUS C/A - Tested D/G; replaced voltage regulator.
0.1. - None.
67 LER 74004W EM
- 001 082 CKTBRK 74/01/16 ED 74/01/25 1075 74/01/25 EH 73 LER 73050W EH 73/12/28 XZ 74(01/03 Z999 001 082 ZZZZZZ 74/01/03 EM EVENT - D/G "C" failed tn start during sched.
maint. test.
CAUSF. - Loose termina1 connection in start circuit No.
1.
EVENT - Start system failure on standby diesel generator.
CAUSE - Left bank starters failed to develop torque to start engine.
C/A - Correc ed terminal connection and checked all other similar connections.
0.1. - None.
C/A - Replaced lover starter; found rust and lack of lub in failed starter air line.
O.I. - Test 0/G air start system
<<ill be increased from 0/4 to 2/4.
124 LER 74013W EM 001 082 CKTBRK 74/02/25 BB 74/03(07 I075 74/03/07 EH EVENT - Start system left. bank failure on standby diesel engine "A'.
CAUSE - Rust from air supply system found on disassembly of starter.
C/A - Replaced starters; blovout air line, cleaned filter.
O.I. - None.
107 LER 74019W OPS 74/03/21 AA 74/03/29 2999 001 082 ZZZZZZ 74/03/29 OPS EVENT - Removed A D/G from service with proving operability of other 3 D/G; core spray
& LPCI per T.S. requirement.
CAUSE " SE knew SI test on all D/G proved satisf. within past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />
& consider other sys.
& no addition test. needed.
C/A - Test per T.S.
requirements review by SE's and A SE's.
O.I. - None.
109 LER 74021W 001 082 RESULTS 74/04/03 BB 74/04/12 I075 CKKBRK 78/08/04 RES EVENT - Start system right bank failure of standby D/G D.
CAUSE - Disassembly of failed starters revealed rust from air supply piping & inadequate lubrica-tion.
C/A - Replaced both right bank
- starters, cleaned air line strainer; adjusted/line lubricator.
O.I. - None.
ITEII ND ASSD SECT DATE EUPIIT C/C REPT IIATE VENDORS/RESP/CAUSE
~SUS/ECT DPSCRII'TIDE 316 LER 75008W LJ 75/05/21 EB 7'R/05/30 1075 EVENT - Diesel generator A inop during S.I.
001 082 MECFUN 78/09/20 EDJ CAUSE - Air starting motors dirty and rusty.
REMARKS/STATUS C/A - Motors replaced; solenoid valve seats, air-line strainers cleaned.
Test satis.
0.1. - Design changes issued and vill be implemented vhen
~ materials are avail.
Completed 165 LER 76001W EM 76/01/14 EE 76/OJ/23 W290 001 082 CKTBRK 76/01/23 E."1 204 LER 76023 MM 76/11/03 EB 76/11/24 h'290 001 08PZ MECFUN 78/08/23 MM 206 LER 76025 EM 76/ll/22 EA 76/1 /08 S345 001 082 CKTBRK 76/12/08 EM 136 LER 78022 EM 78/07/09 XZ 78/07/31 I017 001 082 BLOWERZ 78/07/31 EM EVENT - Diesel generator '0" failed the monthly SI test.
CAUSE - Hydraulic actuator of the diesel govr didn't respond properly to the signals from the electrical governor.
EVENT - Diesel gen. erratic speed found during SI.
CAlJSE - Dirty oil Woodvard Governor mlodel EG-Bio actuator.
EVENT - Diesel Gen.
B start circuit breaker inoperable during maint. test.
CAUSE - Broken stud holder on A connector of breaker no.
L25V909.
EVENT - Field breaker for diesel generator IC tripped on Units 1 & 2 while in hot standby due to thermal heating.
CAUSE - Protect,ive louvers had been bent into the fan blade while removing scaffolding.
C/A - D/G "B" put, in service 8
tied 4-KV SD.
BD. "C" to supply pwr.
RHR PMP on south EECW healier.
Oil added to actuator 8 adjustI d.
O.I. - None.
C/A - Oil changed
- test satisi.
O.I. - Governor oil changed periodically - SDJI-o.
C/A - Breaker vas replaced.
O.I. - None.
C/A - Louvers were straightened.
Other louvers were checked 8
repaired.
O.I. - None.
477 LER 80001 001 082 MM 80/01/07 EB 80/01/18 X999 MECFUN 80/01/18 MM VENDOR EVENT - With U-3 in cold shutdown while performing
- test, speed control on 3A diesel gen was lost.
CAUSE - Coupling which connects speed pick-up to gen shaft had broken.
C/A - A special instr.
was written to inspect all other diesel gen.
All couplings were inspected on all O.I. - None
ITEM NO.
ASSG SECT DATE EVENT C/C REPT DATE VENDORS/RESP/CAUSE SUBJECT/DESCRIPTION RKHARKS/STATUS 767 LER 81019 001 082 HH HOTORX 81/05/06 EX 81/06/01 I075 81/08/05 HM EVENT-the "C" develop CAUSE-During refuel outage
& D/G start EMI-3 test, engine left bank air start motors ~ould not min. speed.
(T.S. 3.9.B.2)
Stxcky vanes (dirty motors).
C/A - Air starting motors replaced.
0.1. - Recurrence control to monitor motors
& eval present preventive maint.
Air start mtrs will be rebuilt 0/Y; inspect,
- clean,
& lubricate 2/Y.
768 LER 81020 W
81/05/06 EF 81/05/29 I075 001 082 HOTORX 81/08/05 81/06/26 HH FVENT - Dur refuel
& D/G start EMI-3 test (T.S.3.9.8.2),
"D" engine left bank air start mtrs would not dev min. speed.
CAUSE - Broken motor's vane due to normal wear.
~ingersoll-Rand motor size 150 BHP, Hdl D89RH46.)
C/A - Rplcd mtr.
O.I. - Recurr. control prog to mon. mtrs perform.
'val preventative natant Air start mtrs will be rebuilt 0/Y; inspect,
- clean,
& lubricate 2/Y 785 LER 81035 001 082 81/06/20 EF 81/07/15 I075 MOTORX 81/08/05 EVENT - Dur RO/EHI-3 D/G start. test, left. bank starters of D/G "B" would not dev. min. rotational speed (T.S.-3.9.B-2).
CAUSE - Normal wear, dirt, & grit in air start sys
~
C/A - Air start mtr rplcd.
Recurrence control prog monitor perform. of mtrs continues to be eval.
Air start mtrs will be rebuilt 0/Y; inspect, clean
& lub 2/Y.
O.I. - None per Rev.
1 (81/07/31).
18 IER 76002W EM 76/01/14 EE 76/01/23 W290 002 082 CKTBRK 76/Ol/23 EH ITEM NO.
ASSG SFCT DATF. FVENT C/C REPT DATE VENDORS/RESP/CAUSE SUIVECT/DESCRIPTION EVENT - Diesel generator "D" failed the rsonthly SI test.
CAUSE - liydraulic actuator of the diesel govr didn't respond properly to the signals fron the electrical governor.
r REMARKS/STATUS C/A - D/G "B" put in service g
tied 4-'KV SD.
BD. "C" to supply pur RNR.
Oil added to actuator g adjusted.
O.I. - None.
ITFH NO.
ASSG SECT DATE FVENT C/C RFPT DATE VENDORS/RESP/CAUSE SUB3ECT/DESCRIPTION REMARKS/STATUS 39 LER 76019 003 082 lL'l RE LATEX 76/11/26 EB 76/12/14 E160 76/12/14 HM EVENT - D/G 3D start circuit 1 found inop during S.I.
CAUSE - Relay failure in speed sensing circuit.
C/A - Relay replaced; test satis.
O.l. - None.
60 LER 77020 003 082 102 LER 79023 003 082 112 LER 80008 003 082 MH 77/09/19 EX 77/10/04 H]75
~KQi 77/10/04 MM EH 79/12/02 XZ 79/12/31 Z999 ZZZZZZ 79/12/31 EM MH 80/04/02 XZ 80/05/01 W290 MECFUN 81/08/05 MM EVENT - d.g.3D tripped on overspeed during EHI-3 CAUSE - Bussmann low peak dual clem.
time delay fuse opc n.
EVENT - Diesel generator 3C tripped fol. start of RHR pump 3B contrary to T.S. 3.9.A, during performance of DG cmerg.
load acceptance test.
CAUSE - Voltage output of freq. generator too high resulting in the DG tying in at lover speed
& volt..
Higher output. due to component drift.
EVENT - With unit at 100$ power, DG/3B governor actuator would not respond properly during operability SI 4.9.A.l, Supplement A.
CAUSE - Unknown, suspected oil contamination.
C/A - Replaced fuse.
O.I. - iNouc.
C/A - Freq.
gen. voltage output corrected
& speed sensing panels calib.
O.I. - None.
C/A - Sump flushed
& ref!1 ed with new oil, & SI run successfully.
O.I. " Sample
& change oil annually.
HHI-6 specifies sample
& change oil 0/Y.
124 LER 80020 EM 80/06/09 EB 80/07/03 H263 003 082 HECFUN 80/07/03 EH EVENT - 3B Diesel Generator Aux. Oil Pump Motor C/A - Hotor replaced.
Bearings tripped twice (T.S. 3.9.8.2) during normal are replaced every two years.
operation.
O.I. - None CAUSE - Due to failure of Model 6203Z sealed bearings.
150 LER 80040 003 082 MH 80/10/10 EF 80/11/07 V125 PUMPXX 80/11/07 MM EVENT - During 99$ power, 3EB Diesel Gen.
lube oil pump was inoperable (T.S.3.9.B.2).
CAUSE - The double-row ball bearing locked.
Attributed to normal end of life.
C/A - Replaced Viking pump, 5 gpm, Hdl. GV503A.
O.I. - None 176 LER 81004 003 082 EM INSTRU 81/01/10 EX 81/02/03 E147 EVENT - During refuel & acceptance load testing, D/G 3A & bkr.
1836 tripped fm D/G overspeed (T.S. 3.9.C.l).
CAUSE - VS relays on speed sensing panel 2
energized at less than 870 RPH.
C/A - Potentiometers for VS relays on SSPI
& SSP2 cal.,
& F/T.
EMI 72.1 for VS 'relay cal compl 3/20/81
& sched every 6 mos.
DCR 2242 replaces existing pnls w/reliable solid state pnls.
O.I. - None
i'I
ITEH NO.
180 LER 81009 003 082 ASSG SECT DATE FVENT C/C REPT DATE VENDOR//RESP/CAUSE SUBJECT/DESCRIPTION E'i 81/02/03 XZ 81/02/27 Z999 EVENT - While perform S.I. 4.9.A.1 suppl.
A (unit ZZZZZZ 81/02/27 at 100$, power),
D/G 3C inop (Ref: TS-3.9.B.2).
failed shutdown within normal time frame.
Failed restart on 2 of 3 at. tempts.
CAUSE - EH investigation reveals no cause to prevent, restart.
RE!BRKS/STATUS C/A - D/G successfully tested operability several times.
S.I.
program
& bimonthly start testing should identify any starting problems.
0.1. - None 199 LER 81023
>Li 81/05/10 DZ 81/06/04 1075 003 082 HOTORX EVENT - Dur 97/, pwr while perfmg EHI-3 D/G start test, left bank air started mtrs on D/G "C" would not dev minimum speed (T.S. 3.9-8.2)
CAUSE - Sticking vanes on di.rty air start mtrs.
C/A - Repld Ingersoll-Rand air start mtrs, Mdl D89Rii46.
0.1. - Recurrence control prog to monitor performance of mtrs continues to be eval.
- Clean, inspect
& lub all D/G ai r start mtrs & rebuild 0/Y is in work.
207 LER 81033 003 082 EH 81/07/06 EB 81/07/30 S345 RELAYX 81/08/03 EVENT - During 99$ po~er
& EHI-3 start test, D/G 3C redundant start relay SFD1 time delay exceeded 4.4 seconds (T.S. 3.9.B.2).
CAUSE - Pneu.
time delay relay drifted out of tolerance.
C/A - Relay was timed
& tested all right.
O.I. - None
0
ENCLOSURE 4 INSTRUMENT MAINTENANCE
SUMMARY
BROWNS FERRY NUCLEAR PLANT 1976 1980
BRNS FERRY NUCLEAR PLANT INSXRlIMENT MAINTENANCE SUKIARY Date System Component Nature of
)>
Effect on Safe Operation of Cause of Results of Action Taken To Preclude 12/14/77 Diesel generator LI-3EC and 3ED Maintenance one lugged a5r port False indicat5on None 2/13/79 Standby diesel generator 3D air compressor pressure switches Calibrate one iSetpoint drift I
Air compressor shut off 3 PSI low None 2/26/79
> Standby 3A diesel
~ diesel
< generator fuel generator pressure gauge Replace I
tNone
'Leaking gauge Diesel fuel in gauge None
ENCLOSURE 5 MECHANICAL MAINTENANCE
SUMMARY
BROWNS FERRY NUCLEAR PLANT 1976 1980
BROWNS FERRY NUCLEAR PLANT MECHANICAL MAliNTEiNANCE SUE LORY Date System Component Nature of Effect on Safe Operation of Cause of Results of Action Taken 1/2/76 l
7/1/76 Diesel generator Diesel generator 1C diesel No.
1 air compres-sor head gasket Air compressor on 3D diesel Installed head gasket Replaced head gasket None None Gasket blew Blown head gasket Air leak at cylinder head Air leak on cylinder head Installed head gasket Replaced head gasket 7/6/76 Diesel generator Coolers oil 3A diesel Cleaned None Hud in coolers High oil temperature Cleaned and added to preventative main-tenance program 8/29/76 Diesel generator Starting air compressor head gasket 1B Replaced head gasket None Blown head gasket Compressor leaks will not pump to maximum pressure Installed head gasket 8/11/76 Diesel generator 3B diesel "A" air compressor Replaced head gasket None Blown head gasket Would not reach designed pressure Installed new head gasket 8/20/76 Diesel generator Check valve on 3C air compressor Installed new check valve None End of life Compressor would not reach its designed maximum pressure Installed new check valve 9/6/76 Diesel generator 1B - A air compressor Blown head gasket None Blown gasket Air leak Installed new head gaskets
BROWNS FERRY NUCLEAR PLANT MEQQHICAL HA1NTEiNANCE SUE'fARY Date Sys em Component Nature of Effect on Safe Operation of Cause of Results of Action Taken To Preclude 9/6/76 Diesel generator 3D and 3B air comprcssors
'/23/76 Diesel 3C and 3A air generator
( compressors I
Replaced head gasket Replaced check valve None None Blown head gasket End of life Air leak at compressor head Air compressor ran excessively Installed new head I
gasket Installed new check valve 1/7/77 Diesel generator B and D diesel air compressor Replaced head gasket None Air compressor would not reach designed pressure Low air pressure Installed new head gasket 1/29/77 Diesel generator D diesel air compressor "B"
Replaced head gasket None Blown head gasket Compressor would not Installed new head pump its designed gasket pressure 4/7/77 Diesel generators Starting air
'compressor 1D diesel Installed head gasket None Blown head gasket Compressor would not pump to its compacity Installed new head gasket 6/14/77 Diesel generator 1A air compressor "B" diesel Replaced head gasket None Blown head gasket Compressor would not reach design pressure Replaced head gasket 6/18/77 Diesel generator 1A air compressor "D" diesel Replaced head gasket None Blown head gasket Compressor would not reach design pressure Replaced head gasket
BROWNS PERRY NUCLEAR PLANT MECHANICAL MAINTENANCE SUE'QRY Date System Component Nature of Effect on Safe Operation of Cause of Results of Action Taken To Preclude 7/1/77 Diesel generator Air compressor on "D" diesel generator Blown head gasket None Blown head gasket None Replaced gasket 8/1/77 8/23/77 Diesel generator Diesel generator Air compressor PS-82-26D Blown head gasket Calibration None None (Unknown Setpoint drift Head gaskets blown No.
2 air compressor would start at 168 psig.
Should be 175 + 5 psig.
J Replaced head gaskets I
I I
I
~ N/A I
8/9/77 Diesel generator Diesel generator Cleaned N/A Scheduled mainte-ance N/A Cleaned 9/22/77 Diesel generator 3D generator Dirty oil None Operation None Plushed and refilled with oil-10/29/77 Diesel generators No.
2 air compres-sor on 3EC diesel air line Leaking pilot valv and discharge check valve None Worn fittings None Reworked pilot valve and replaced check valve
BRONNS FERRY NUCLEAR PLANT MECHANICAL MAINTENANCE SUE1ARY Date S.'tem Component Nature of Effect on Safe Operation of Cause of Results of Action Taken To Preclude I 11/21/77 I
12/5/77 Diesel generator Diesel generators Air start system 38 diesel "3B" diesel generator 1 air compressor Cleaned air start system None Blown head gasket None Rust in air lines Unknown B diesel would not start in alloted time None Cleaned strainer and blew out air line Installed new head gasket 12/27/77 C
Diesel generator Air compressor Head gasket leak None Hear None Replaced gasket 3/1/78 Diesel generator 1 and 2 diesel generators Dirty oil None Operation None Changed oil 3)9/78 Diesel generator 3C, 3B, 3D diesel Low oil level None Unknown None Added oil 4/24/78 Diesel generator Diesel generator lube oil pump Coupling worn out None Coupling worn out
.on diesel gene-rator lube oil pump Diesel generator lube oil pump noisy Installed new coupling and aligned.
TR No. 85166
BROWNS FERRY NUCLEAR PLANT
>KCHANICAL KXINTENANCE SURGERY Date System Component Nacu e of Effect on Safe Operation of Cause of Results of Action Taken To Preclude 4/13/78 Diesel generator 3B diesel generato No.
2 air compres-sor discharge valve Replace check valve None Check valve guts out Valve would not hold Replaced with new check valve TR No 99216 4/17/78 Diese1 generators No. 3 diesel generator air handling units I
Filter changeout None Filters dirty Dirty filters Changed filter TR No.
88172
>4/18/78 Diesel generator Battery exhaust fan on diesel generator 3C Fan breaker con-tacts sticking None 120-V coil bad Contactor trying to burn up Replaced coil and checked.
TR No. 99231 5/4/78 Diesel generators Head gasket of 3D diesel No.
2 air compressor Gasket leaking None Unknown None Replaced gasket 5/27/78 Diesel generator No.
2 air compressor Head gasket blown None Unknown None Replaced gasket
BRONNS FERRY NUCLEAR PLi4VT MECHANICAL ~!Al:iTEViANCE SUiDL1RY Date I6/7/78 System Diesel generator Component No.
2 air com-pressor in diesel generator room 3ED Nature of Head gasket blown Effeet on Safe Operation of, None Cause of Unknown one Results of Action Taken To Preclude Tightened high-pressure head and replaced i6/9/78
'/11/78
'/27/78 I
- 9 14 78 Diesel generator
. Diesel
- generator i starting i air I
I I Diesel generator Diesel generator building heating and ventilation system 3C diesel generator No.
1 air compressor
! No.
2 air
'ompressor
~ "B" air compressor
! on 3A diesel
< B and D air I
~ compressor
> moisture traps I
Air leak
<Safety valve I
IIleaking and clogged
.with rust I
Head gasket blown Traps dirty with corrosion one None None N/A Operation one Operation None Unknown N/A iHead gasket bad one
,Changed gasket II I
(I lReplaced safety valves i and cleaned i
l I
Il i Replaced head gasket I
I I
~ Cleaned trap I
I
BROWNS FERRY NUCLEAR PLAhT MECilANICAL~lAI'A'TENANCE SUMLARY Dace
! 9/1A/78 9/20/78 I
9/25/78 I
I I
t i 10/18/78 Diesel generator building heating and ventilation system "D" air compressor Diesel generator building heating and ventilation system Diesel generator i~ n I "E" air compressor I
lI I
I I
il ii "E" air compressor l
Diesel generators Both fuel filters
! on 1D diesel System
)
Component iNacurc of Water leaking from unloader valve Cooler clogged with mud Head leaking, intercooler and strainer dirty Dirty filters Effecc on Safe Operation oi N/A N/A N/A None Cause of Operation Unknown Operation Operation N/A N/A N/A None Results of Accion Taken To Preclude Blew down drain, steam-I fitters are reworking Iair crap I
i l
I
~ Removed and cleaned i intercooler.
Replaced I
- heads with new gaskets Il i
'Replaced head gasket, lIcleaned intercooler I and strainer I
I l
I Changed 2 filters on "D" diesel 10/19/78 Diesel generators Clean 1-A and 1-B diesel generator coolers Coolers were dirty None Some mud in coolers - needed cleaning None Removed coolers heads, cleaned coolers, re-placed heads using new gasket
BROWHS FERRY FOCLEAR PLANT MECNlhVICAL MAINTEHAHCE SU1DLXRY Dace System Component Nature of v~4 n
Effect on Safe Operacion of Cause of Results of Action Taken To Prec1.ude 6/11/79 i 8/16/79 Diesel generator building heating 'and ventilation system Diesel generator 3C diesel generator I
i Air handling unit filters need changing Coolers dirty Filters need changing Hone N/A Mud stopped up coolers
- Overheating of coolers I
Filters clogged up
. N/A Cleaned both coolers, replaced heads using t nev gaskets I
I I
I
- Changed out filters I and replaced vith nev
! ones 8/10/79 Diesel generator i'o.
2 air compressor
'eaking around
~ high-pressure
( head
'one II I
Leak around head Loss of pressure Repaired leak around i high-pressure head
! 9/4/79 j 10/13/79 Diesel generator Diesel generator Diesel generator B
All diesel generator Oil lov MMI 30
. None None Operation Need to perform MMI 30 None Wi 30 I Added oil
> Performed
%11 30 on all diesel generators 10/15/79 Diesel generator Generator "A" Ail 6 None To perform MMI 6 None MMI 6 Recorded hour readings
BROWNS FERRY NUCLEAR PLANT MECHANICAL MAINTENANCE SU%!i!RY Date 8/21/80 System Diesel generator Component HCV-32-669 Nature of Solder point
> broken above valve I
1 Effect on Safe Ooerat'on of N/A Cause of r
Broken joint N/A Results of Action Taken To Prcc)ud'eplaced valve TR No.
170409
,'/22/80 I
10/10/80 I
I 1
10/23/80
! 11/28/80 11/28/80 Diesel generator Diesel generator Diesel generators Diesel generator Diesel generator "D" diesel generator Blown head gasket None 3ED diesel
! generator Lube oil cir-culating pump I
I I
C 2 fuel oil pump I
Circulating oil
, pump locked up i
I I
. Bad seal and
~ bearings Leaking filter f None I
~ None None None D diesel governor Low oil level
, High-pressure l'asket blown Pump locked up Bad seal and bearings Loose filter
'nknown Blown gasket Pump would be inoper-able Possibly prevent startup of engine None None
[ Replaced blown head gasket TR No.
178482 i
I'eplaced pump
- Replaced seal and I bearings.
TR No.
137677 I
I Ad)usted filter 1
I I Added oil I
BROWNS FERRY NUCLEAR PLANT MECHANICAL MAINTENANCE SUGARY Date System Component Nature of Effect on Safe Operation of Cause of Results of Action Taken To Preclude 12/11/80
~ Diesel generator Compressor 1
Leaking line N/A Small leak N/A 1Tightened nut TR
',. No.
179280 I
I I
MMS:SAM 1/29/82
ENCLOSURE 6 ELECTRICAL MAINTENANCE
SUMMARY
BROWNS FERRY NUCLEAR PLANT 1976 1980
BROGANS FERRY NUCLEAR PLANT EI.ECTRICAL MAINTENANCE SU10LXRY Date System Component Nature of Effect on Safe Operation of Cause of mtina Results of Action Taken To Preclude 12/1/80 Diesel generator
'C'iesel generator Scheduled redundan start test EHI 3 None, the diesel generator was operable A bad coil on signal unit duration relay The bad coil caused slow operation of the SUDR relay allowing a arc to remain across relay contacts 1-2 thus not allowing diesel generator fast start circuit to reset Replaced bad coil on SUDR relay, completed EHI 3.
SUDR relay operated properly.
TR No.
194429
~ 12/3/80 Diesel generator
'C'iesel generator Output breaker 1812 opened during surveillance test-ing (SI 4.9.A.l.a.
None A shorted diode in overspeed trip alarm circuit A shorted diode in overspeed trip alarm circuit tripped break er 1812 Replaced shorted diode.
Reran surveillance test; diesel generator operated properly.
TR No.
189406 BFRO 50-259-8088 12/14/80 Diesel generator
'D'iesel generator Audio alarm relay was found to be hanging up during surveillance test-ing (SI 4.9.A.l.d)
None Diesel generator
~ alarm panel relay mechanically hanging up Audio alarm inoperable Replaced bad relay; alarm operates pro-perly.
TR No. 197031.
BROWNS FERRY NBCLEAR PLANT ELECTRIC KL MAINTENANCE
SUMMARY
Date System Component Nature of Effeet on Safe Operation of Cause of Results of Action Taken To Preclude 11/19/80 10/6/80 Diesel generator Diesel generator Diesel generator 1A Diesel generator 3A Alarm bell mal.-
functioned SM EH? 3 diesel generator re-dundant start test None None
> Bad alarm bell I coil I PFD1 coil on 3A diesel generator Alarm bell inoperative Replaced coil; alarm now operating properly.
TR No.
189469 PDF1 coil on 3A I Replaced PFD1 relay.
inconsistent on timingi Relay'times properly.
- TR No.
176101 I
10/22/80 9/5/80 Diesel generator Di.esel generator Exhaust fan A 3A exhaust fan Exhaust fan A trips out None 3A exhaust fan for None 3C diesel gene-rator breaker tripping
< Wire lug burned ou'c I
I Loose connection on motor leads ative by gA.
Bumped for proper rotation and performed EMX 71; test O.K.
TR No.
178916 Caused exhaust fan to trip Tightened bolts in motor leads.
Motor checked 0 K TR No 170560 Exhaust fan A inoper-
~ Relugged and verified
BROlAi'S PERRY NUCLEAR PLANT ELECTRICAL MAINTENANCE SUTLER'ate 1/30/80 System Diesel generator "B" battery charger Component Diesel generator "B" battery charger or exhaust fan Nature of Abnormal alarm will not clear r Effeet on Safe Operation of
~ cncr~
None Cause of
, Bad resistor Results of Resistor burned open in diesel generator "B" charger Action Taken Tn Preclude
<'~LCLRlIrd'eplaced
- resistor, checked charge voltage.
Voltage same as uAu charger.
Checked O.K.
TR No.
151627 12/4/79 Diesel generator Diesel generator 3C failed to accept load on emergency load acceptance test High-voltage supply None I Unit 3C diesel
,'generator frequenc
,'enerator was
~ supplying too-high voltage to SSPI and SSP2 Too-high voltage Ad)usted air gap on frequency generator pickup to reduce
~ supplied voltage to.
correct valve Checked O.D.
TR No. 96702 BPRO 50-296/7923 9/26/79 Diesel generators 3ED diesel generator air compressor "B"
Compressor inoperable N/A Loose coil wire Compressor would not start Tightened coil wire, checked O.K.
TR No.
124642
BROGANS FERRY NUCLEAR PLANT ELL'Cl'RICAL NAINTENANCF. SULTRY Date System Component Nature of Effect on Safe Operation of Cause of Results of Action Taken To Preclude
)6/17/79 Diesel generator Diesel generator C ) Control power off alarm will not clear N/A Coil in relay burned up Alarm would not clear Replaced relay.
Checked O,.K.
TR No.
134472 5/27/79 Standby diesel Battery charger A for D diesel generator and battery charger A for C diesel generator Battery charger would not charge N/A Failed resistor on chargers Batteries not charg-ing Replaced resistors, placed on equalizing
- charge, performed FHI 4, checked O.K.
TR Nos.
125928 and 125931 4/27/79 Diesel generators "B" air compressor overload trip Unit tripping on overload N/A Heat buildup because of low oil level Unreliable operation Hachinists filled oil reservoir.
Checked O.K.
TR No.
126928 12/1/78 Diesel generator Diesel generator C and D
STOLI relay on "C" and annunci-ator relay on "D" failed to operate properly per SI 4.9.A.l.d None STOLI relay on "C" diesel gener-
~ator annunciator relay bad on "D" diesel generator Did not meet criteria Changed both relays.
of SI 4.9.A.l.d Met all criteria of SI 4.9.A.l.d.
Checked O.K.
TR No. 87915
BROWNS FERRY NUCLEAR PLANT ELECTRICAL MAINTENANCE SUMfARY
)
Date System Component Nature of
'III Effect on Safe Operation of Cause of Results of Action Taken To Preclude QtR I 12/24/78 I
12/1/78 Diesel generator Diesel generator Power fai'ure alarm for diesel generator "A" Pressure switch AP2 diesel gene-ator 3D Power failure alarm will not clear Diaphragm blown out on AP2 None None Coil burned out on diesel generato control panel AP2-Pressure switch bad Power failure alarm would not clear Pressure switch inoperable.
Alarm on Replaced coil and cleaned alarm.
TR No.
34115 Replaced pressure switch.
Alarm cleared.
TR No.
110084
~ 11/8/78 Diesel generator
.Diesel generators C and D
Perform SI 4.9.A.l.d None None STOLI relay was bad on "C" diesel gene-ator annunciator.
Relay for circuit nalfunction was bad on "D" diesel gene-ator Replaced bad relays.
Ran SI 4.9.A.l.d.
Checked O.K.
TR No. 87915 11/23/78 Diesel generator 480-V diesel generator auxili-ary board A 480-V diesel generator auxili-ary board A.
Roo ventilation supply danper remained in the open position None Bad danper motor Improper ventilation Replaced damper motor.
Checked O.K.
TR No.
107769
BROWNS FERRY NUCLEAR PLANT ELECTRICAL MAINTENANCE SUKKLRY Date System Component Nature of Effect on Safe Operation of Cause of Results of Action Taken To Preclude 11/2/78 Diaphragm on h
Diesel generator
]
pressure switc AP2 Diaphragm is blown Nnne on AP2 AP2 pressure switch bad Low-pressure alarm was inoperable Replaced and calibrated AP2.
Alarm cleared TR No.
110084 11/24/78 Diesel generator 3B diesel generator Lube oil cir-culating pump appears to have bad bearing None Bad bearings on drive motor Noise and bearing heating up Bearings replaced.
Checked O.K.
TR No.
114384 10/18/78 Diesel generator "A" diesel gene-ator air compres-sor motor windings have fire damage from arcing brushes Commutator blackened because of brush arcing None Brushes arcing when motor started Commutator blackened because of brush arcing Cleaned commutator and checked brushes.
Contactor and motor operated properly.
TR No.
115557 10/10/78 Diesel generators EMI-3 diesel generators 3A, 3B, 3C, and 3D Diesel generator reduadent start test None SFDI relay on
~ diesel generator 3A was out of time Did not meet timing criteria of EHI-3 Changeout'SFDI relay.
Ran SI 4.9.A.l.d tested O.K. with TR No. 87901.
EMI-3
BROGANS FERRY NHCLEAR PLANT EI,ECTR ICAL ))AINTENANCE SU&)ARY Date System Component Nature of Effect on Safe Operation of Cause of Results of Action Taken To Preclude
)0/16/78 Diesel generator H2 air compressor diesel generator 3D Compressor will not shut off None Pressure switch was not opening Compressor would not shut off and lift safety valve Replaced and calibrated pressure switch.
Checked O.K.
TR No.
106542 9/5/78 Diesel generator Diesel generator IIDII Lube oil heater overload assembly and wires burned None Loose wire I.ube oil heater not working Replaced overload assembly and wires.
Heater operated correctly.
8/1/78 Diesel generator Auto-manual transfer switch Replace transfer switch None Trip coil burned out switch wouldn' transfer Replaced switch and verified proper operation.
TR No. 87800 8/8/78 Diesel generator 125-V battery charger Battery charger "A" not reading correctly None Bad voltmeter on "A" charger Voltmeter not reading Replaced voltmeter and correctly PSO calibrated.
TR No. 96615
BROMNS FFRRY NUCLEAR PLANT ELECTRICAL NAINTENANCE SU.DQRY Date (7/8/78 l
System Diesel generator Component Diesel generator "D" control power off alarm Nature of "Control power off" alarm will not clear Effect on Safe Operation of None Cause of
~~'Gals.
Bad coil on relay Results of "Control power off" alarm will not clear 1
Action Taken 1
To Preclude I
cQIXQ'QSC.
Changed out coil on relay.
Alarm cleared..
TR No. 93984 7/1O/78 Diesel generators Diesel generator electrical control cabinets Inspect all fans None on control cabinet Aluminum fan housing bent causing fans to bend Fans could not turn I
Straightened all bent fan housings and checked that all fans are operable.
TR No.
85472
'7/5/78 Diesel generator Diesel generator 3ED 'ECR'elay
'ECR'elay bad None
'ECR'gastat bad Diesel generator 3ED shutting down too quickly Replaced agastat timed Checked time O.K.
TR No.
93641 7/6/78 Diesel generator Diesel generator 3 EC breaker 1832 Breaker will not operate None Charging motor shorted and micro-switches burned up Breaker 1832 will not operate Replaced charging moto) and microswitches.
TR I No.
93521 3/19/78 Diesel generator "Control power off'nnunciator "con-alarm trol power off" will not clear None NVA relay burned up Alarm would not clear Replaced NVA relay.
Annunciator cleared.
TR No.
83841
all 41 0
BROWNS FERRY NUCLEAR PLANT ELECTR1CAL KKINTENANCE SUNDRY Date System Component Nature of Effect on Safe Operation of Cause of Results of Xialfll?1CX1gJj Action Taken To Preclude 4/18/78 Diesel generator Battery exhaust fan on diesel generator 3C Fan breaker con-tacts sticking None 120-V coil bad Contactor trying to burn up Replaced coil and checked TR No. 99231 3/8/78 Diesel generators Diesel generator IIDll Replace isolation diodes in annunci-ator relays None Isolation diodes on annunciator.
Relays short circuited.
Diesel generator "D"
started when local annunicator test button pushed Replaced isolation diodes in annunciator relays.
TR No. 66528 1/19/78 I
Diesel generator Diesel generator exhaust fans "A" and "B" Replace flow switches on exhaust fans None Flow switches bad on "A" and "B" diesel generator exhaust fan motor controls Exhaust fan "A" failed to start Replaced flow switch on both A and B exhaust fans.
TR No. 97603 11/22/77 Diesel generators Speed senser relay on diesel generator 3B Replace speed sensor re1ay None Bad speed sensor relay Potential failure of one start circuit.
The second start circuit was operation al Replaced speed sensor relay on diesel gene-ator 3B.
TR No.
79884 11/4/77 Di.esel.
generators Overcurrent relays Change out nylon spool coils None Nylon spools in coils Nylon spools were changed out New coils were in-stalled.
TR No. 64444
BROVNS PERRY NDCLEAR PLAZA ELECTRlCAL MAINTENANCE SU%1ARY Date System~
Component Nature of Effect on Safe Operation of Cause of Results of Action Taken L
P cl de
,11/2/77 Diesel
~ Voltage supply generators
) transfer and over current relays Change out nylon spool coils None Nylon spools in coils Nylon 'spools were changed out New coils were in-stalled.
TR 1'o.
64443 9/22/77 Diesel Exciter field generator
~ circuit fuse Diesel generator "3D" tripped on overspeed None Defective fuse in exciter field circuit and poor electrical conn-ection because of insufficient fuse clip spring pressure Diesel generator "3D" tripped on oversoeed Replaced fuse and in-creased spring pressure, on fuse clip.
BPRO 296/7720 TR No. 65330 9/23/77 Diesel generator IIAI~
Battery charger IIAI~
Load resistor in battery charger is open None Load resistor in battery charger is open Battery charger has no voltage output Replaced load resistor in battery charger.
TR No. 66062 5/19/77 Diesel generator "B" 125-V dc Battery cell Replace cracked cell None la@roper instal-lation of battery racks Stress cracking in battery )ars Replaced cells and read)usted battery racks.
Special Electrical Maintenance Xnstruction 3.
BROIIFNS FERRY NUCLEAR PLANT EI.ECTRICAL MIIITENANCE SUllARY Date System Component Nature of Effect on Safe Operation of Cause of
~ann~
Results of Action Taken To Preclude A/21/77 Diesel generator l
Diesel generator
- Replace motor 3B lube oil pump
,'earing None Bad motor bearings Lube oil pump will not run Replaced both bearings, reinstalled pump motor and tested.
TR No.
78677 12/7/76 12/29/76 Diesel generator Diesel generator II Diesel generator "3D" speed sensing; relay li l
I Diesel generator 3A I
Replace start circuit No.
1 speed sensing relay Repair fuse contacts on PT fuse block None None Faulty speed sensing relay on diesel generator IIDII PT fuse clip broken during maintenance Failure of start.
Checked No.
1 to function properly on start of diesel generator Diesel generator would not come up to voltage Replaced speed sensing relay on "3D" BFRO 296/
I 76I9 Repaired fuse block contacts.
TR No. 59831 12/31/76 Diesel generator "3D" diesel generator air compressor "A"
Rebuild starter contacts None Burned contacts on starter "3D" diesel generator compressor "A" will not run Rebuilt starter on air compressor "A" TR No.
60298
BROWNS FERRY NUCLFAR PLANT FLECTRICAL MAINTENANCE SLAVERY Date System Component Nature of Effeet on Safe Operation of Cause of Results of Action Taken To Preclude llQ'.
11/3/76 Diesel generator IIDII Woodward govenor hydraulic actuator Chango oil in None hydraulic actuator Dirty nil in hydraulic actuator Diesel generator exhibited erratic behavior Changed oil in hydraulic actuator BFRO 259/7623 11/26/76 Diesel generator Diesel generator 3D start circuit Replace relay in speed sensing circuit Relay in speed sensinc circuit failed Replaced relay in speed sensing start ci.rcuit.
BFRO 296/7619 1/23/76 Diesel generator Diesel generator batteries Changeout diesel generator batterie IIBII and IICII diesel generators Hone End.of 5-year battery life exceeded Diesel generators "B" I I'nd "C" batteries vould not hold charge Replaced battery on diesel generators "B"
and "C" RCS: SAM 1/27/82
ENCLOSURE 7
Additional Comments l.
It is estimated that each diesel generator has (inadvertently) started 36 times a year automatically.
These starts are not recorded.
2.
The maintenance record indicates a successful start with an "X" under starts.
It indicates the number of runs in each start with the numeral indicated.
The length of the run and whether it was scheduled or unscheduled is also indicated.
The last column indicates if the maintenance instruction was performed because other equipment was inoperative and the start was required by technical specifications.
3.
It could not be determined whether the reactor was shut down or not when maintenance was performed.
4.
The modification record indicates all modifications performed on the diesel to date.
5.
The computer printout is TVA's list of all the Licensee Event Reports on the diesel generators for the time period indicated.
6.
The maintenance summaries are all the trouble reports (TR) that have been performed on any of the diesel generators or equipment associated with them for the requested period.
e-