JUL 2 2 198)
Valley Authority
ATTN:
Mr. H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga,
TN
37401
Gentlemen:
Subject:
Report Nos. 50-259/81-16,
50-260/81-16
and 50-296/81-16
This refers to the routine safety
inspection
conducted
by Mr. B.
R. Crowley of
this office
on
June
22-25,
1981,
of activities
authorized
by
NRC Operating
License
Nos.
and
DPR-68 for the
Browns ferry facility.
Our
preliminary
findings
were
discussed
with Mr.
H.
L. Abercrombie,
Power
Plant
Superintendent,
at the conclusion of the inspection.
Areas
examined
during
the
inspection
and
our
findings
are
discussed
in the
enclosed
inspection
report.
Within these
areas,
the inspection
consisted
of
selective
examinations
of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspectors.
During the inspection, it was
found that cert'ain activities under your license
appear
to violate
NRC requirements.
These
items
and references
to pertinent
requirements
are listed in the Notice of Violation enclosed
herewith
as Appen-
dix A.
Elements to be included in your response
are delineated in Appendix A.
Two new unresolved
items 'are identified in the enclosed
inspection report.
These
items will be examined during subsequent
inspections.
7
In accordance
with 10 CFR 2.790 of the Commission's
regulations,
a copy of this
letter and the enclosed
report will be placed in the NRC's Public Document
Room.
If the report contains
any information that you believe to be exempt from disclo-
sure under
10 CFR 9.5(a)(4), it is necessary
that you:
(a) notify this office by
telephone within ten days
from the date of this letter of your intention to file
a request for withholding; and (b) submit within twenty-five days
from the date
of this letter
a written application to this office to withhold such information.
If your receipt of this letter has
been delayed
such that less
than
seven
days
are available for your review, please notify this office promptly so that
a
new
due date
may be established.
Consistent with section 2.790(b)(1),
such applica-
tion must
be accompanied
by an affidavit executed
by the owner of the information
which identifies the document or part thereof sought to be withheld,
and
a full
statement
of the reasons
on the basis of which it is claimed that the information
should
be withheld from public disclosure.
This section further requir'es
the
statement
to address
with specificity the considerations
listed in 10 CFR 2.790-
(b)(4).
The information sought to be withheld shall
be incorporated
as far as
possible
into
a separate
part of the affidavit. If we do not hear from you in
this regard within the specified periods
noted above,
the report will be placed
in the Public Document
Room.
Si09240580 Si0915,~
ADOCK 05000259~~)
6
~PDR
~
Val 1 ey Authority
JUL 28
1981
Should you have
any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
R. C. Lewis, Acting Director
Division of Resident
and
Reactor Project Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-259/81-16,
50-260/81-16
and 50-296/81-16
cc w/encl:
H. J.
Green, Director of Nuclear Power
H. L. Abercrombie, Plant Superintendent
R.
E. Rogers, Project Engineer
H. N. Culver, Chief, Nuclear Safety
Review Staff
bcc w/encl:
NRC Resident Inspector
Central Files
Local Public Document
Room
Washington Public Document
Room
Nuclear Safety Information Center
Technical Information Center
Document Management
Branch
State of Alabama
p~ i
R g
R1
growl ey. t
sorg
/I7 /8
7/
/81
RI I
RI I
RII
RII
R
o k
ARHerdt
f
CMPrphy
AFGib on
CLewi e
7/F7/81
7/~/81
7/go/81
7/0/81
7/ 81
P~ 5'
\\ 41
f
I
h
t,
0
'