ML18025B612
| ML18025B612 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 07/08/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML18025B609 | List: |
| References | |
| NUDOCS 8109010505 | |
| Download: ML18025B612 (4) | |
See also: IR 05000259/1981014
Text
, gp,g AEQUI,
a (4
P
~4
0
O
N
Y/
~0
++*<<+
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I I
101 MARIETTAST., N.W., SUITE 3100
ATLANTA,GEORGIA 30303
ZUL 08 ~BS1
OIWICIAI Cop~
Valley Authority
ATTN:
Mr. H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga,
TN
37401
Gentlemen:
Subject:
Report Nos. 50-259/81-14,
50-260/81-14
and 50-296/81-14
This refers to the routine safety inspection
conducted
by Mr. Robert
F. Sullivan
of this office on April 28 through
May 25,
1981, of activities authorized
by
NRC
Operating
License
Nos.
and
DPR-68 for the Browns Ferry facility.
Our preliminary findings were discussed
with Mr. H.
L. Abercrombie at the con-
clusion of the inspection.
Areas
examined
during
the
inspection
and
our findings
are
discussed
in the
enclosed
inspection
report.
Within these
areas,
the inspection
consisted
of
selective
examinations
of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspectors.
During the inspection, it was
found that certain activities under your license
appear
to violate
NRC requirements.
These
items
and references
to pertinent
requirements
are
listed
in
the
Notice
of Violation enclosed
herewith
as
Appendix A.
Elements
to
be
included
in your
response
are
delineated
in
Appendix
In accordance
with 10 CFR 2.790 of the Commission'
regulations,
a copy of this
letter and the enclosed
report will be placed in the
NRC's Public Document
Room.
If the report
contains
any
information that
you believe
to
be
exempt
from
disclosure
under
10 CFR 9.5(a)(4), it is necessary
that you:
(a) notify this
office by telephone
within
" ten
days
from the
date
of this letter of your
intention to file a request'for withholding;
and (b)
submit within twenty-five
days
from the
date
of this letter
a written application
to this office'o
withhold such information. If your receipt of this letter has
been
delayed
such
that
less
than 'seven
days
are available for your review,
please
notify this
office promptly
so that
a
new due
date
may
be established.
Consistent
with
section
2.790(b)(1),
such
application
must
be
accompanied
by
an affidavit
executed
by the owner of the information which identifies the
document
or part
thereof sought to be withheld,
and
a full statement
of the reasons
on the basis
of which it is claimed that the information should be withheld from public
-.810'9010505
810818 (;
PDR -ADOCK 05000259,
..'
'
..'."..-.',-.pi ~>~
PDR'I
f ~
I
I I
7'
~e ea.~kltW ~&i%~~r..
Val 1 ey Authority
~
gUp 0 8 198>
t
l
disclosure.
This
section
further
requires
the
statement,
to
address
with
specificity the considerations
listed in
The information
sought to be withheld shall
be incorporated
as far as
possible
into
a separate
part of the affidavit. If we
do not hear
from you in this regard within the
specified periods
noted above,
the report will be placed in the Public Document
Room.
Should you have
any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
. C.
Le
, Chief
Projects
Branch 1, Division of
Resident
and Reactor Project
Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 259/81-14,
260/81-14 and 296/81-14
cc w/encl:
H. J.
Green, Division Director
H. L. Abercrombie, Plant Superintendent
R. E. Rogers, Project Engineer
H. N. Culve'r, Chief, Nuclear Safety
Review Staff