ML18025B366
| ML18025B366 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 01/26/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML18025B367 | List: |
| References | |
| NUDOCS 8103100045 | |
| Download: ML18025B366 (3) | |
See also: IR 05000259/1980044
Text
~8 ASCII
1p
+
O~
Cy
I
O
It
Vl
e$
1'r1qt; 0 p t
9
>>Si Jgp~
COSIltIISSI~~o>Z
I
C
Valley Authority
ATTN:
H. G. Parris
Hanager of Power
500A Chestnut Street Tower II
Chattanooga,
TN
37401
Gentlemen:
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTAST., N.W., SUITE 3100
ATLANTA,GEORGIA 30303
"AN 2
6 t98l
Subject:
Report Nos.
- 59 80-
-260
-
an
"296 80-
This refers to the routine inspection conducted
by E. H. Brooks of this office
on November 24-27,
1980, of activities authorized
by NRC Operating I,icense Nos.
and
DPR-68 for the Browns Ferry facility, and to the discussion
of our findings held with H. Abercrombie at the conclusion of the inspection.
Areas
examined
during the inspection
are
discussed
in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
examinations
of procedures
and representative
records,
interviews with personnel,
and obser-
vations by the inspector.
l
Within the scope of this inspection,
no violations or deviations were disclosed.
We have
examined actions you have taken with regard to previously reported unre-
solved items.
The status of these items is discussed in the enclosed report.
In accordance
with Section" 2.790 of the NRC's "Rules of Practice,", Part 2, Title
l0, Code of Federal Regulations,
a copy of this, letter and the enclosed inspection
report will be placed in the NRC's Public Document
Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary
that you" make
a written application within 20 days to this office to
withhold such information from public disclosure.
Any such application must
include
a full statement of the reasons
on the basis of which it is claimed that
the information is proprietary,
and should be prepared
so that proprietary infor-
mation identified in the application is contained in a separate
part of the
document. If we do not hear from you in this regard within the specified period,
the report willbe placed in the Public Document Room.
Should you have any questions
concerning this letter,
we will be glad to discuss
them with.you.
Sincerely,
Ec.
R.
C. Lewis, Acting Chief
Reactor Operations
and Nuclear
Support Branch
Enclosure:
(See
Page
2)
S103Z00O'/2
t
HI
~8~
II
lf
ll
Valley Authority
JAe p 8 IS8>
Enclosure:
Inspection Report Nos. 50-259/80-44,
50-260/80-41,
and 50-296/80-40
cc w/encl:
H. L. Abercrombie, Plant Superintendent
R. E. Rogers, Project Engineer
H. N. Culver, Chief, Nuclear Safety
Review Staff
H. J.
Green, Division Director