Forwards IE Insp Repts 50-259/80-44,50-260/80-41 & 50-296/80-40 on 801124-21.No Noncompliance Noted
ML18025B366
Person / Time
Site: Browns Ferry  
Issue date: 01/26/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML18025B367 List:
References
NUDOCS 8103100045
Download: ML18025B366 (3)


See also: IR 05000259/1980044

Text

~8 ASCII

1p

+

O~

Cy

I

O

It

Vl

e$

1'r1qt; 0 p t

9

>>Si Jgp~

COSIltIISSI~~o>Z

I

C

Tennessee

Valley Authority

ATTN:

H. G. Parris

Hanager of Power

500A Chestnut Street Tower II

Chattanooga,

TN

37401

Gentlemen:

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

"AN 2

6 t98l

Subject:

Report Nos.

- 59 80-

-260

-

an

"296 80-

This refers to the routine inspection conducted

by E. H. Brooks of this office

on November 24-27,

1980, of activities authorized

by NRC Operating I,icense Nos.

DPR-33,

DPR-52

and

DPR-68 for the Browns Ferry facility, and to the discussion

of our findings held with H. Abercrombie at the conclusion of the inspection.

Areas

examined

during the inspection

are

discussed

in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examinations

of procedures

and representative

records,

interviews with personnel,

and obser-

vations by the inspector.

l

Within the scope of this inspection,

no violations or deviations were disclosed.

We have

examined actions you have taken with regard to previously reported unre-

solved items.

The status of these items is discussed in the enclosed report.

In accordance

with Section" 2.790 of the NRC's "Rules of Practice,", Part 2, Title

l0, Code of Federal Regulations,

a copy of this, letter and the enclosed inspection

report will be placed in the NRC's Public Document

Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary

that you" make

a written application within 20 days to this office to

withhold such information from public disclosure.

Any such application must

include

a full statement of the reasons

on the basis of which it is claimed that

the information is proprietary,

and should be prepared

so that proprietary infor-

mation identified in the application is contained in a separate

part of the

document. If we do not hear from you in this regard within the specified period,

the report willbe placed in the Public Document Room.

Should you have any questions

concerning this letter,

we will be glad to discuss

them with.you.

Sincerely,

Ec.

R.

C. Lewis, Acting Chief

Reactor Operations

and Nuclear

Support Branch

Enclosure:

(See

Page

2)

S103Z00O'/2

t

HI

~8~

II

lf

ll

Tennessee

Valley Authority

JAe p 8 IS8>

Enclosure:

Inspection Report Nos. 50-259/80-44,

50-260/80-41,

and 50-296/80-40

cc w/encl:

H. L. Abercrombie, Plant Superintendent

R. E. Rogers, Project Engineer

H. N. Culver, Chief, Nuclear Safety

Review Staff

H. J.

Green, Division Director