ML18024B094
| ML18024B094 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 10/04/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML18024B095 | List: |
| References | |
| NUDOCS 7911150172 | |
| Download: ML18024B094 (3) | |
See also: IR 05000259/1979023
Text
~llREoy~
~4
~o
O
I
r
lO0
ty
tp
gO
+w*e+
In Reply Refer To:
RII:LM
50-259/79"23
50-260/79-23
50-296/79-23
UNITEDSTATES
NUCLEAR REGULATORYCOMMISSION
REGION II
101 MARIETTAST., N.W., SUITE 3100
ATLANTA,GEORGIA 30303
OCT 04 879
Valley Authority
Attn: H; G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga,
37401
Gentlemen:
This refers
to the
inspection
conducted
by L. Modenos
of this office on
September 4-6,
1979 of activities
authorized
by
NRC Operating
License
Nos.
and
DPR-68 for the
Browns Ferry Nuclear Plant facility, and to
the discussion of our findings held with J. L. Harness at the conclusion of the
inspection.
Areas
examined
during the inspection
and
our findings are
discussed
in the
enclosed
inspection
report.
Within these
areas,
the inspection
consisted of
selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
Within the scope of this inspection,
no items of noncompliance were disclosed.
.1
<< ~
I
ff
~
t ~
I
I<<1
<< ~
tj
I
In accordance
with Section 2.790 of the NRC's "Rules of Practice", Part 2, Title
10, Code of Federal Regulations,
a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary
that you make
a written application within 20 days to this office to
withhold such
information from public disclosure.
Any such application must
include
a full statement of the reasons
on the basis of which it is claimed that
the information is proprietary,
and
should
be
prepared
so that proprietary
information identified in the application is contained in a separate
part of the
document. If we do not hear from you in this regard within the specified period,
the report willbe placed in the Public Docume'nt Room.
'f
f<<
tj
'
)
Valley Authority
OCT p g 87g
Should you have any questions
concerning this letter,
we will be glad to discuss
'them with you.
Sincerely,
C. E. Murp y, Ch'
Reactor Construction and
Engineering Support Branch
Enclosure:
Inspection Report Nos. 50-259/79-23,
50-260/79-23,
and 50-296/79-23
cc w/enclosure:
J.
G. Dewease
Plant Superintendent
Post Office Box 2000
Decatur,
35602
D. E. McCloud, Project Engineer
400 Chestnut Street
Tower II
Chattanooga,
37401