ML18024B065

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-259/79-19,50-260/79-19 & 50-296/79-19 on 790808-10.No Noncompliance Noted
ML18024B065
Person / Time
Site: Browns Ferry  
Issue date: 09/06/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML18024B066 List:
References
NUDOCS 7910290214
Download: ML18024B065 (4)


See also: IR 05000259/1979019

Text

UNITEDSTATES

NUCLEAR REGULATORYCOMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

In Reply Refer To:

RII:LM

50-259/79-19

50-260/79-19

50-296/79-19

SEA 085yg

Tennessee

Valley Authority

Attn:

H. G. Parris

Manager of Power

500A Chestnut Street

Tower II

Chattanooga,

Tennessee

37401

Gentlemen:

)

This refers to the inspection

conducted

by L. Modenos of this office on

August 8-10,

1979 of activities authorized by NRC License Nos. DPR-33,

DPR-52 and DPR-68 for the Browns Ferry Nuclear Plant facility, and to

the discussion of our findings held with H. I . Abercrombie at the conclusion

of the inspection.

Areas examined during the inspection

and our findings are discussed in

the enclosed inspection report.

Within these

areas,

the inspection

consisted of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observations

by the inspector.

Within the scope of this inspection,

no items of noncompliance

were

disclosed.

In accordance

with Section 2.790 of the NRC's "Rules of Practice",

Part 2, Title 10,

Code of Federal Regulations,

a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room. If this report contains

any information that you (or

your contractor) believe to be proprietary, it is necessary

that you

make

a written application within 20 days to this office to withhold

such information from public disclosure.

Any such application must

include

a full statement of the reasons

on the basis of which it is

claimed that the information is proprietary,

and should be prepared

so

that proprietary information identified in the application is contained

in a separate

part of the document.

If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document

Room.

t

Tennessee

Valley Authority

-2-

SEF 08m>

Should you have any questions

concerning this letter,

we will be glad to

discuss

them with you.

Sincerely,

C. E. Murphy,

ie

Reactor Construction

and

Engineering Support Branch

cc w/enclosures:

J.

G. Dewease

Plant Superintendent

Post Office Box 2000

Decatur,

Alabama

35602

D. E. McCloud, Project Engineer

400 Chestnut Street

Tower II

Chattanooga,

Tennessee

37401

~ ~