In Reply Refer To:
RII:RJH
50-259/79-20
50-260/79-20
50-296/79-20
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTAST., N.W., SUITE 3100
ATLANTA,GEORGIA 30303
AUG2 0 1979
Valley Authority
Attn:
H.
G. Parris
Manager of Power
500A Chestnut Street
Tower II
Chattanooga,
37401
Gentlemen:
This refers to the inspection
conducted
by R. J. Hardwick of this office
on August 2-3,
1979 of activities authorized
by NRC License Nos.
and DPR-68 for the Browns Ferry facility, Unit Nos.
1,
2 and 3,
and to the discussion of our findings held with J. L. Harness
at the
conclusion of the inspection.
Areas
examined during the inspection
and our findings are discussed
in
the enclosed
inspection report.
Within these
areas,
the inspection
consisted of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observations
by the inspector.
Within the scope of this inspection,
no items of noncompliance
were
disclosed.
Two new unresolved
items resulted
from this inspection
and are discussed
in the enclosed report.
These
items will be examined during subsequent
inspections.
In accordance
with Section 2.790 of the NRC's "Rules of Practice",
Part 2, Title 10,
Code of Federal Regulations,
a copy of this letter and
the enclosed
inspection report will be placed in the NRC's Public
Document
Room. If this report contains
any information that you (or
your contractor) believe to be proprietary, it is necessary
that you
make
a written application within 20 days to this office to withhold
such information from public disclosure.
Any such application must
include
a full statement
of the reasons
on the basis of which it is
claimed that the information is proprietary,
and
shou%'d
be prepared
so
that proprietary information identified in the application is contained
V 9 x 0 0 z 6 t'ZS
AUG 2
0 1979
Valley Authority
in a separate
part of the document.
If we do not hear from you in this
regard within the specified period, the report will be placed in the
Public Document
Room.
Should you have any questions
concerning this letter,
we will be glad to
discuss
them with you.
Sincerely,
C. E. Murphy, Chi
Reactor
Construe ion and
Engineering
Support Branch
Enclosures:
Inspection Report Nos. 50-259/79-20,
50-260/79-20
and 50-296/79-20