ML18024A759
| ML18024A759 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 03/09/1979 |
| From: | Gilleland J TENNESSEE VALLEY AUTHORITY |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML18024A758 | List: |
| References | |
| NUDOCS 7904110024 | |
| Download: ML18024A759 (4) | |
Text
TENNESSEE VALLEYAUTHORITY
'-~c p.r c HATTANooQA, TENNEssM.Pg)pl
' ~A 500C Chestnut Street Tower II
'" ~+838m Argqry>
Mr. James P. O'Reilly, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Region II - Suite 3100 101 Marietta Street Atlanta, Georgia 30303
Dear Mr. O'Reilly:
Enclosed is our response to R, C. Lewis'arch 2, 1979, letter RII:DSP 50-259/79-3, 50-260/79-3, and 50-296/79-3, concerning an activity at Browns Ferry Nuclear Plant which appeared to be in noncompliance with NRC requirements.
We have reviewed the above inspection report and find no proprietary information in it.
Very truly yours, A~
. E. Gilleland Assistant Manager of Power Enclosure V 9041100>g AllEQLllfOppoftunlty Kmptoyw
,J I
ENCLOSURE
RESPONSE
TO INSPECTION REPORT RII:DSP 50-259/79-3, 50-260/79<<3, 50-296/79-3
""R.
CD LEWIS'ETTER TO H. G. PARRIS
'""DATED MARCH 2) 1979 PIHDING As required by 10 CFR Part 50, Appendix B) Criterion XI, test results shall be documented and evaluated to assure that test requirements have been satisfied.
Contrary to the above, for unit 1, surveillance testing performed on the standby liquid control system on December 20, 1978, was not in accordance with the provisions of facility Operational Quality Assurance Manual, Part II, Section 4.5.5 in that test data was not properly recorded on the data sheets provided in the surveillance instructions.
This is a deficiency.
RESPONSE
Corrective Ste s Taken and Results Achieved Test data was not properly recorded on the data sheet for SI 4.4.A.2 due to personnel error.
The instruction was not written plainly.
The surveillance instruction was revised, and PORC approved it on February 27, 1979.
Full compliance has been achieved.
'v l