ML18023A491

From kanterella
Jump to navigation Jump to search
Updated Final Safety Analysis Report (Ufsar), Amendment 27, 10.5 Table - Fuel Pool Cooling and Cleanup
ML18023A491
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 10/05/2017
From:
Tennessee Valley Authority
To:
Office of Nuclear Reactor Regulation
Shared Package
ML18018A778 List: ... further results
References
Download: ML18023A491 (1)


Text

BFN-19 TABLE 10.5-1 FUEL POOL COOLING AND CLEANUP SYSTEM SPECIFICATIONS SYSTEM FUNCTION SYSTEM SPECIFICATION RATED CORE THERMAL POWER 3,293 MWt (pre-uprated) 3,458 MWt (uprated)

TOTAL POOL, WELL, AND PIT VOLUME 106,881 cu ft FUEL STORAGE POOL VOLUME 51,340 cu ft SYSTEM DESIGN FLOW (1 PUMP) 600 gpm MAXIMUM FLOW (2 PUMPS) 1,200 gpm PUMP CHARACTERISTICS (1 PUMP) 600 gpm, 330 ft TDH 6

FPC HEAT EXCHANGER (1) - DESIGN CAPACITY 4.4 x 10 Btu/hr/Hx.

Fuel Pool Flow: 600 gpm; Temp. 125°F / RBCCW Flow: 750 gpm; Temp. 100°F 6

RHR HEAT EXCHANGER (1) - DESIGN CAPACITY 19.3 X 10 Btu/hr/Hx.

Fuel Pool Flow: 800 gpm; Temp. 150°F / RHRSW Flow: 4500 gpm; Temp. 95°F 34.0 X 106 Btu/hr/Hx.

Fuel Pool Flow: 2000 gpm; Temp. 150°F / RHRSW Flow: 4500 gpm; Temp. 95°F FILTER DEMINERALIZER 270 sq ft, 550 gpm 20 psi max dp (dirty)

HOLDING PUMP FLOW 27 gpm PRECOAT FLOW 405 gpm FUEL POOL SPECIFIC CONDUCTIVITY 10.0 mho/cm FUEL POOL CHLORIDE 500 ppb