ML18022A769

From kanterella
Jump to navigation Jump to search
Annual Rept of Number of Personnel & man-rem by Work & Job Function for 1989,primary Coolant Iodine Spikes & Primary Safety & Relief Valve challenges.W/900212 Ltr
ML18022A769
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/31/1989
From: Richey R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HO-900018-(O), NUDOCS 9002270074
Download: ML18022A769 (5)


Text

AC CELEBRATED BUTI ON DEMONS TI 0.'i SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9002270074 DOC.DATE: 89/12/31 NOTARIZED: NO DOCKET ¹ FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION RICHEY i R. B. Carolina Power a Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

"Annual Rept of Number Personnel & Man-REM,Primary Coolant Iodine spikes 6 primary Safety 6 Relief Valve Challenges." R DISTRIBUTION CODE: IE56D COPIES RECEIVED:LTR TITLE: 20.407 Annual Personnel Monitoring Rpt~nnual Rad Exposure L ENCL SIZE:

pt by Fun I

D 05000400 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 1 0 PD2-1 PD 5 5 BECKER,D 1 0 INTERNAL: ACRS 6 6 AEOD/DSP/TPAB 1 1 NRR/DOEA/OEAB11 1 1 NRR+D~P/ RPB11 2 2 NUDOCS-ABSTRACT 1 1 REPTILE 02 1 1 RES BROOKS,B 2 2 GN2 Ol 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 S

D NOTE 'IO ALL "RIES" RECIPZBGS'LEASE S

HELP US TO REDOCE RASZE> CGNZACT 'IHE DOCUNEÃ7 CONGEAL DESK ROCN Pl-37 (EXP. 20079) K) EIJMNATE KCR NAME HKH DIPIRZK7ZICN LIST8 MR DOCUMERIG KRJ DC@'T NEED<

TOTAL NUMBER OF COPIES REQUIRED: LTTR 25 ENCL 23

CP&l Carolina Power 8 Light Company P. O. Box 165 ~ New Kill, N. C. 27562 R. B. RICKEY Manager Karrla Nuclear ProJect FEB 1 2 t990 Letter Number.'HO-900018 (0)

Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400 LICENSE NO+ NPF-63 ANNUAL OPERATING REPORT Gentlemen:

In accordance with Technical Specification 6.9.1.2 for the Shearon Harris Nuclear Power Plant, Unit No. 1, Carolina Power and Light Company herewith submits the annual report of (a) individuals receiving exposures greater than 100 mrem/yr and their associated manrem exposure according to work and job functions, (b) primary coolant iodine spikes, and (c) challenges to the pressurizer power-operated relief valves (PORVs) and primary safety valves for 1989.

Very truly yours, I

Harris Nuclear Project MGW:dgr Enclosure cc: Mr. S. D. Ebneter (NRC-RII)

Mr. J. E. Tedrow (NRC-SHNPP) 5'002270074 8912-'1 PDR AGOCK 0500tt400 R PDC MEM/HO-9000180/1/OSl

Document Control Desk Page 2 RIMS 11 NUMBER OF PERSONNEL AND MAN-REM BY WORK AND JOB FUNCTION, 1989 HARRIS PLANT NUMBER OF PERSONNEL > 100 MREM I TOTAL MAN REM WORK AND JOB FUNCTION STAT UTIL CNTR I STAT UTIL CNTR REACTOR OPERATIONS AND SURVEILLANCE MAINTENANCE PERSONNEL 1 0 8 0. 512 0.000 3.604 OPERATING PERSONNEL 32 0 8 8.818 0.000 3.483 HEALTH PHYSICS PERSONNEL 24 0 34 10.234 0.000 10.687 SUPERVISORY PERSONNEL 0 0 0 0. 125 0.000 0.000 ENGINEERING PERSONNEL 1 0 0 0.454 0.000 0. 143 ROUTINE MAINTENANCE MAINTENANCE PERSONNEL 13 7 5 4.538 2.452 4.478 OPERATING PERSONNEL 0 0 0 0. 215 0.000 0.035 HEALTH PHYSICS PERSONNEL 0 0 1 0.294 0.000 0.579 SUPERVISORY PERSONNEL 0 0 0 0.000 0.000 0.000 ENGINEERING PERSONNEL 1 0 2 0. 315 0.000 .0. 649 INSERVICE INSPECTION MAINTENANCE PERSONNEL 6 0 12 3.627 0. 010 4.435 OPERATING PERSONNEL 1 0 1 0.345 0.000 0.430 HEALTH PHYSICS PERSONNEL 2 0 2 0.860 0.000 0.460 SUPERVISORY PERSONNEL 0 0 0 0. 135 0.000 0.011 ENGINEERING PERSONNEL 3 '0 6 1.922 0.002 3.849 SPECIAL MAINTENANCE MAINTENANCE PERSONNEL 0 13 F 814 0.528 4 '84 OPERATING PERSONNEL 0 0 0.081 0.000 0.070 HEALTH PHYSICS PERSONNEL 0 5 0.974 0.000 1.332 SUPERVISORY PERSONNEL 0 0 0.001 0.000 0.000 ENGINEERING PERSONNEL 1 12 0. 453 0. 185 6. 194 WASTE PROCESSING MAINTENANCE PERSONNEL 0 0 1 0.000 0.000 0.350 OPERATING PERSONNEL 0 0 0 0.010 0.000 0.000 HEALTH PHYSICS PERSONNEL 1 0 0 0. 165 0.000 0.040 SUPERVISORY PERSONNEL 0 0 0 0.000 0.000 0.000 ENGINEERING PERSONNEL 0 0 1 0.000 0.000 0.445 REFUELING MAINTENANCE PERSONNEL 45 11 79 28.845 7.191 38.791 OPERATING PERSONNEL 0 0 0 1.025 0.000 0.380 HEALTH PHYSICS PERSONNEL 8 0 20 2.320 0.000 6.297 SUPERVISORY PERSONNE1. 0 0 0 0.000 0.000 0.315 ENGINEERING PERSONNEL 13 0 20 5.888 0.078 10.730 TOTAL MAINTENANCE PERSONNEL 71 18 118 40.336 10. 181 55 742

~

OPERATING PERSONNEL 33 0 9 10.494 0.000 4.398 HEALTH PHYSICS PERSONNEL 37 0 62 14. 847 0.000 '9.395 SUPERVISORY PERSONNEL 0 0 0 0. 261 0.000 0.326 ENGINEERING PERSONNEL 19 1 41 9.032 0.265 22.010 GRANO TOTAL 160 19 230 74.970 10.446 101.871 Notesi. (1) Dose based on pocket dosimeters (2) Stat = Harris Plant staff Util = CP&L non-Harris personnel Cntr = Contractor MEM/H0-9000180/2/OSl

Document Control Desk Page 3 1989 ANNUAL REPORT PRIMARY COOLANT IODINE SPIKES During 1989, the primary coolant did not exceed 1.0 yCi/gram dose equivalent I-131 or ) 100/E/uCi/gram dose as set forth in Technical Specification 3.4.8.

MEM/H0-9000180/3/Osl

Document Control Desk Page 4 1989 ANNUAL REPORT PRIMARY SAFETY AND RELIEF VALVE CHALLENGES During 1989, there were no challenges to the primary power operated relief valves (PORVs) or the primary safety valves.

MEM/HO-9000180/4/Osl