Text
ACCELERATED
~O
. ~
UTION DEMONSATION SYSTI21VI REGULATORY INFORMATION DISTRIBUTION SYSTEM 'RIDS )
FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION HALE,M.
Carolina Power 6 Light Co.
RICHEY,R.B.
Carolina Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION DOCKET 050 0 04 0 0
SUBJECT:
Monthly operat'or Dec 1989 for Harris Nuclear Power Plant, Unit 1. /90011 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
D NOTES:Application for permit renewal filed.
o5ooo4oo
/
RECIPIENT ID CODE/NAME PD2-1 LA BECKER,D INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/LPEB10 PB11 REG FILE 01 EXTERNAL: EGGG SIMPSON,F NRC PDR
. COPIES LTTR ENCL 3"
3 1
1 10 10 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME
.PD2-1 PD AEOD/DOA IRM TECH ADV NRR/DOEA/OEABll NUDOCS-ABSTRACT RGN2 LPDR NSIC COPIES LTTR ENCL 1,
1 1
1 2
2 1
1 1
1 1
1 1
1 1
1 A
D R
D NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP, US TO REDUCE WAS'ONTACTTHE.DOCUMENTCONfROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISIRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 29 ENCL 29 A
D
'D S
A 1
Nj
~C;>> '
h
~ 4
Carolina Power & Ught Company P. O. Box 165 ~ New Hill, N. C. 27562 R. B. RICHEY Manager Harris Nuclear Project JAN 1 2 1990, File Number.'SHF/10-15505 Letter Number:
HO-903002 (0)
Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO 1
DOCKET NO. 50-400 LICENSE NO ~ NPF-63 MONTHLY OPERATIONS REPORT Dear Sirs'.
In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.
1, Carolina Power 6 Light Company herewith submits the report of operation statistics and shutdown experience for the month of December 1989.
Yours very truly, C.G R. B. Richey Manager Harris Nuclear Project MWH:kdl Enclosure cc.'Messrs.
S.
D. Ebneter (NRC-RII)
R.
G. Oehl (DOE)
J.
E. Tedrow (NRC-SHNPP) 9001230079'5'1231 PDR ADOCK 05000400 R
PDC MEM/DATAREPa/1/OS4 z>p
0
~
't C
h k
I
DOCKET NO.:
050-400 UNIT:
Harris Unit 1
DATE:
December 1989 COMPLETED BY:, Mark Hale OPERATIONS
SUMMARY
Harris Unit 1 operated at a 30.82 percent Availability Factor for the month of December with a
13.01 percent Capacity Factor.
There was one refueling
,outage, two load reductions, one unit off-line event to perform a Turbine Mechanical Overspeed Test and one off-line event due to failure of the 1A Main Feedwater Pump.
Details are, provided on the Unit Shutdowns and Power Reduction Sheet.-
There are 157 fuel assemblies in the reactor vessel and 194 spent fuel assemblies, in Spent Fuel Pool B.
90 of the spent fuel assemblies are BWR and were shipped to Harris from CPSL's Brunswick Plant.
MEM/DATAREPa/1/OS4
~Ig ~
CPXL CO RUH DAJF 81/18/98
~'UN TTNE 08:16:32 F'LANT PERFGRHANCE DATA.
~TEN OPERATIHG DATA REI-'QRT I-IARRIS UNIT F'AGE RPD36-008 OPERATING sT~Tus DGCI<ET No. 058-488 COHPLETED E<Y NARK M.
HALE TELEPI.IOHE (919)362-2944 2 h 3.
5 A 6.
7.
8.
UNXT NAME:
IIARRIS UNXT RLPORTIHG PERIOD:
DECEHDER 89 LXCEHBED TI.IERHAI POMER (HMT): 2775 HAHEPI ATE RATlHG (GROSS NME): 958.9 DESIGN ELECTRICAL RATING (HET HMF): 988.8 HAX DEPENDABLE CAI7ACII'Y
( GROSS HWE): 920. 0 HAX DEPENDABLE CAPACITY (NET HWF): 860.0 IF CHAHGES OCCUR IH CAPACITY RATINGS (ITEHS GXVE REASONS:
N/A NOTES There are 157 fuel assemblihs lin the reactor, 194 spent fuel lassemblies in Spent Fuel Pool B, l90 of the spent fuel assemblies arel IBWR and were shipped from Brunswick)
I I
3 THRU 7>
SINCE LAST RFPORT, V*
18.
I OWEI'< LEVEL To MHXCII Rl"STR ICTI'""D IF AHY
( HET HWE
) l Less than 87%,
The Unit is restricted to a maximum of 87%
by Technical Specifications, due to one Main Steam Safety Valve (1MS-44) being inoperable.
High trip set at 85% and the Unit was operated at 75% power.
THIS HONTI-I YR TG DATE CUNUL ATIVE
~I
- 1 3
- 14.
15.
16.
17.
18.
19.
70 21.
79 A k
- 23*
'74 HouRs IN REr-ORTXNG PERIOD NUMBER OF IHOUI'
UNIT SERVICE FACTOR UNlT AVAILADIL1TYFACTOR uNxT cAr-.
FAcTGR
<usING HDc NET)
UHIT CAP.
FACTOR (USING DER NET) uNX'r l-GRcED ourAGE RATE SHUTDOWNS SCHE1)* OVER NEXT 6 HONTHS 744.88 778
.88
.88 331368.30 105555.08 83251.08 30.82 38.82 13.81 12.43
.36 (TYPE,
- DATE, 8768.ee 6962.57
- 88 6875.12
~ 88 18293815.34 6849755.00 5631852.00 78.48 78.48 74*76 71*43 1*86 AND DURAT1GN 23481.00 17997.57
.80 17659.35
.e0 46541678.40 15458262.00 14338168.88 75.46 75.46 71.25 68.08 4.95 QF EACH>:
25.
xF sHuTDoMN Ar END GF <<FPoRT
- FERXQD, EsTxHArED DArE GF START uF".
UNITS IH TEST STATUS (PRloR TO COMHERCIAL OPERATION >:
FORECAST ACHIEVED INITIAL CRITICALITY 1NITIAI ELECTRIC1TY COMMERCXAL OPERATION MEM/DATAREPa/2/OS4
CPAL CO RUN DATE 81/18/98 IDUN TIHE 88:
3 6: 29 PLANT PERI=ORHANCE DATA
~TEH APPENDIX B AVERAGE DAILY POWER LEVEL HARRT.S UNIT PAGE RPD39-888 DECEHBER 1989 DAY AVG. DAILY POMI:-Ik LEVEI
<HME-NET)
DOCI<E r NO. 8>8-<88 COHPL.ETED BY HARI< M.
I IAL.E TI=LI:.PHONE (91 9) 362-2944 DAY AVG. DAlLY POWER LEVEI (HME-NET) 7 22 158 18 278 375 28 38 MEM/DATAREPa/3/OS4
l )'
C t
k b
I
~ ~
~
I I
I ~ f
~
I I
II
~
~
~
~
I
~
~
~ ~
I
~
~
~ ~
~
~
~
~
I ~
~ ~
~
~
~ ~
~
~
~
~
~
I' I
~
I
~
~
~
~
~
~
~
~
~
~
~ ~
I '
~
~
Ia..
~
~
~
~
~
~
I
~
~
I
~
~
~.
c
I ~ 1 I
I 'll I
I
\\
~
~
~
I
~
~
~
~
~
I
~
~
~ ~
~
~
I ~
~
~
~
~
~
~
~
~
I ~
~
~
~
~
~
~
~
~
~
~
~
~
~
I.
I
~
~
I ~.;
~
~
~
~ '
~ ~
I
~
~
~
~..
~
'4 7
S n
I
UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:
DECEMBER 1989 DOCKET NO.:
050-400 UNIT NAME:
Harris DATE:
I/5/90 COMPLETED BY:
M. W. Hale TELEPHONE:
(919) 362-2944 Date Tl y
P e
Duration (Hours)
R Method of Shutting Down Reactor Licensee Event Report if System Code 4
Component Code 5
Cause 8, Corrective Action to Prevent Recurrence 89-026 891227 4.58 N/A ZZ ZZZZ Unit off-line due to performance of Turbine Mechanical Overspeed Trip Test.
The test results were satisfactory.
Unit was returned to service.
F:
Forced S:
Scheduled 2
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training II License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
Method:
I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4
Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) Flic (NUREG&161) 5 Exhibit 1 - Same Source MEM/DATAREPa/6/OS4
d
~
C C
F C
C
~
~
~
~
~
~
~
~
I;
~
~
~ ~
~
~
~
~
~ ~
~
~
~
~
~
~
I ~
I
~
~
I ~
~
~
~
~
~ ~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~;
~
4 I
I
~
Ii-1
~
~
~
I
~ ~
~
I ~
I
~
~
I
~
~
~
I ~
I ~
~
I I
II I
'l
~ I I
~
~
~
~
~
~
~
I s
~
~
s
~
~
~
I ~
~ ~
~
~
~
s
~
~
~
~
~
~
~
~
~
~
~
~
~ '
~
~
~
~
~
~
~
~
~
~
~
~
s
~
s
~
s,
~
~
I I
~
~
Is -
~
~
~
t
~
~
~
~ ~
I
~
I