ML18022A703

From kanterella
Jump to navigation Jump to search
Forwards Shearon Harris Nuclear Power Plant Unit 1 Inservice Insp Summary,First Interval,First Period,First Refueling Outage Completed 881014, Per ASME Code Section Xi,Article IWA-6220(b)
ML18022A703
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 01/12/1989
From: Richey R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML18022A702 List:
References
NLS-89-008, NLS-89-8, NUDOCS 8901240599
Download: ML18022A703 (2)


Text

COL Carolina Power & Light Company R O. Box 1551 ~ Raleigh, N. C. 27602 ggN 1 2 1989 R. B. RICHEY, Manager SERIAL: NLS-89-008 Nuclear Sewices Department 10CFR50.55a SVQi240599 PDR 8'at'Qi i2 9

ADOCK 05000400 PDR United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 IN-SERVICE INSPECTION REPORT Gentlemen:

In accordance with the reporting requirements of the ASME Boiler and Pressure Vessel Code,Section XI, Article IWA-6220(b), Carolina Power &

Light Company (CP&L) hereby submits Shearon Harris Nuclear Power Plant (SHNPP), In-Service Inspection results. The enclosed report covers the inspections performed during the first of two scheduled plant refueling outages in the first period of the first inspection interval.

Please refer any questions regarding this submittal to Mr. Steven D.

Chaplin at (919) 836-6623.

Yours very truly, R. B. Richey RBR/lmr(gcorgisi)

Enclosure cc: Mr. R. A. Becker Mr. W. H. Bradford Mr. M. L. Ernst

,4 pp I' w

E n E