Forwards Insp Rept 50-400/88-14 on 880523-27.No Violations or Deviations Noted
ML18022A662
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/22/1988
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML18022A663 List:
References
NUDOCS 8807130097
Download: ML18022A662 (3)


See also: IR 05000400/1988014

Text

ACCZLERATED

DIS7RIBUTION

DEMONSTRATION

SYSTEM

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8807130097

DOC.DATE: 88/06/22

NOTARIZED: NO

FACIL:50-400 Shearon Harris Nuclear

Power Plant, Unit 1, Carolina

AUTH.NAME

AUTHOR AFFILIATION

COLLINS,D.M.

Region

2, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

UTLEYPE.E.

Carolina

Power

& Light Co.

DOCKET ¹

05000400

SUBJECT:

Forwards

Insp Rept 50-400/88-14

on 880523-27.No violations

or deviations noted.

R

DISTRIBUTION CODE:

IE06D

COPIES

RECEIVED:LTR i ENCL /

SIZE:

cE +i+

TITLE: Environ

& Radiological

(50 DKT)-Insp Rept/Notice of Violate.on Respons

NOTES:Application for permit renewal filed.

05000400

S

RECIPIENT

ID CODE/NAME

PD2-1

LA

BUCKLEY,B

INTERNAL: ACRS

AEOD/DSP

NMSS/SGOB

4E4

NRR/DOEA/EAB 11

NRR/DREP/RPB

10

NUDOCS-ABSTRACT

REQDUL1&

02

RES

DRPS

DEPT

RGN2/DRSS/EPRPB

EXTERNAL: LPDR

NSIC

COPIES

LTTR ENCL

1

0

1

1

2

2

1

1

1

1

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

PD2-1

PD

AEOD/DOA

NMSS/LLOB

5E4

NRR/DLPQ/PEB ll

NRR/DREP/EPB

10

NRR/PMAS/ILRB12

OGC 15-B-18

RES

RGN2

FILE

01

RGN4

MURRAYPB

NRC

PDR

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

S

h

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

26

ENCL

25

Docket No. 50-400

License

No.

NPF-63

Carolina

Power

and Light Company

ATTN:

Nr. E.

E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT

NO. 50-400/88-14

This refers to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

C.

H.

Bassett

on

Nay 23-27,

1988.

The inspection

included

a review of

activities authorized for your Shearon

Harris facility.

At the conclusion of

the inspection,

the findings were discussed

with those

members of your staff

identified in the enclosed

inspection report.

Areas

examined

during the inspection

are identified in the report.

Within

these

areas,

the inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation

of

activities in progress.

Within the

scope

of the

inspection,

no violations

or deviations

were

identified.

In accordance

with Section 2.790 of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosure

will be placed in the

NRC Public Document

Room.

Should you have any questions

concerning this letter, please

contact us.

Sincerely,

Enclosure:

Inspection Report

cc w/encl:

(See

page

2)

Douglas

N. Collins, Chief

Emergency

Preparedness

and

Radiological Protection

Branch

Division of Radiation Safety

and Safeguards

8807230097

880622

PDR

ADOCK 05000400

6

PNU

Carolina

Power and Light Company

cc w/encl:

R. A. Watson, Vice President

Harris Nuclear Project

D. L. Tibbitts, Director of Regulatory

Compliance

J. L. Harness,

Plant General

Manager

bcc w/encl:

C. Barth,

OGC

NRC Resident

Inspector

A. Upchurch,

Chairman, Triangle J

Council of Governments

DRS, Technical Assistant

Document Control

Desk

State of North Carolina

RII

RII

RI

CBassett

CHosey

PF edrickson

6//>/88

6//'f/88

6/("7/88