ML18022A653

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-400/88-10 on 880502-06.No Violations or Deviations Noted.Unresolved Item Identified in Rept Will Be Pursued During Future Insps
ML18022A653
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/17/1988
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML18022A654 List:
References
NUDOCS 8806290107
Download: ML18022A653 (4)


See also: IR 05000400/1988010

Text

P.C CELERATED

DISTRIBUTION

DEMONSTRATION

SYSTEM

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

'CCESSION NBR:8806290107

DOC.DATE: 88/06/17

NOTARIZED: NO

FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina

AUTH.NAME

AUTHOR AFFILIATION

HERDT, A.R.

Region 2, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

UTLEY,E.E.

Carolina Power

& Light Co.

SUBJECT:

Forwards Insp Rept 50-400/88-10

on 880502-06.No violations

or deviations noted.

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:Application for permit renewal filed.

DOCKET

05000400

D

05000400

8

RECIPIENT

ID CODE/NAME

PD2-1

PD

INTERNAL: ACRS

DEDRO

NRR/DLPQ/PEB 11

NRR/DOEA DIR 11

NRR/DREP/RPB

10

NRR/PMAS/ILRB12

BB

(J

REG FILE

02

N'ILE

01

XTERNAL: LPDR

NSIC

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

BUCKLEY,B

AEOD

NRR MORISSEAU,D

NRR/DLPQ/QAB 10

NRR/DREP/EPB

10

NRR/DRIS DIR 9A

NUDOCS-ABSTRACT

OGC 15-B-18

RES/DRPS

DEPY

NRC PDR

COPIES

LTTR ENCL

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

A

A

D

8

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

25

ENCL

25

JUN 17 1988

Docket No. 50-400

License

No.

NPF-63

Carolina

Power and Light Company

ATTN:

Mr. E.

E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

NRC

INSPECTION REPORT

NO. 50-400/88-10

This refers

to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

S. Tingen

on

May 2-6,

1988.

The inspection

included

a review of activities

authorized for your Harris facility.

At the conclusion of the inspection,

the

findings

were

discussed

with those

members

of your staff identified in the

enclosed

inspection report.

Areas

examined

during the inspection

are identified in the report.

Within

these

areas,

the inspection

consisted of selective

examinations

of procedures

and representative

records,

interviews with personnel,

and observation

of

activities in progress.

Within the

scope

of the

inspection,

no violations

or deviations

were

identified.

Your attention

is invited to an unresolved

item identified in the inspection

report.

This matter will be pursued

during future inspections.

In accordance

with Section

2.790 of the

NRC's

"Rules of Practice,"

Part 2,

Title IO,

Code of Federal

Regulations,

a copy of this letter and its enclosure

will be placed in the

NRC Public Document

Room.

Should you have any questions

concerning this letter, please

contact us.

Sincerely

Enclosure:

NRC Inspection

Report

cc w/encl:

(see

Page

2)

Alan R. Herdt, Chief

Engineering

Branch

Division of Reactor Safety

8306290i07

330617

PDR

ADOCK 05000400

0

DCD

JUN 17 'l988

Carolina

Power

and Light Company

2

cc w/encl:

R. A. Watson,

Vice President

Harris Nuclear Project

D. L. Tibbitts, Director of Regulatory

Compliance

J.

L. Harness,

Plant General

Manager

bcc w/encl:

C. Barth,

OGC

NRC Resident

Inspector

A. Upchurch,

Chairman, Triangle J

Council of Governments

DRS, Technical Assistant

Document Control

Desk

State of North Carolina

STi nge: ser

0 /4/88

RII

FJap

06/ Q/88

RII

Fred

'ckson

06//5/88