Forwards Insp Rept 50-400/86-35 on 860505-09.No Violations or Deviations Noted
ML18019B067
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/26/1986
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML18019B068 List:
References
NUDOCS 8607100396
Download: ML18019B067 (4)


See also: IR 05000400/1986035

Text

June

26,

1986

Docket No. 50-400

License

No.

CPPR-158

Carol in~ Power

and Light Company

ATTN: vAr. E.

E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

NRC INSPECTION

REPORT

NO. 50-400/86-35

This refers to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

C.

F. Smith on May 5 - 9,

1986.

The inspection

included

a review of activities

authorized

for your

Shearon

Harris facility.

At the

conclusion

of the

inspection,

the

findings

were

discussed

with

those

members

of your

staff

identified in the enclosed

inspection report.

~

~

Areas

examined during the inspection

are identified in the report.

Within these

areas,

the

inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation

of activities

in progress.

Within the scope of the inspection,

no violations or deviations

were identified.

In accordance

with Section

2.790 of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a

copy of this letter and its enclosure

will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter,

please

contact

us.

Sincerely,

(original signed by)

David M. Verrelli, Chief

Reactor Projects

Branch

2

Division of Reactor Projects

Enclosure:

NRC Inspection

Report

cc:

(See

page

2)

8607100396

860626

PDR

ADOCK 05000000

6

PDR

RlI

i

Bel i sl e

/P/86

RIIy

CJulian

&/=786

RIIg~

PFr edrickson

5/~86

Carolina

Power

and Light Company

June

26,

1986

'c w/encl:

"

R. A. Watson,

Vice President

Harris Nuclear Project

~R.

H. Parsons,

Project General

Nanager

v

D. L. Tibbetts, Director of Regulatory

Compliance

~ J.

L. Willis, Plant General

Hanager

cc w/encl:

g,. Barth,

ELD

~J.

moore,

ELD

~NRC Resident

Inspector

ocument Control

Desk

~State of North Carolina

RII

CSmith:er

06/

/86

RII

GBelisle

06/

/86