ML18019A770

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-400/86-14 on 860303-07.No Violation Noted
ML18019A770
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/02/1986
From: Panciera V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML18019A771 List:
References
NUDOCS 8604080297
Download: ML18019A770 (1)


See also: IR 05000400/1986014

Text

April 2,

1986

Carolina

Power

and Light Company

~ATTN:

Mr. E.

E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

REPORT

NO. 50-40 8-

On

March 3-7,

1986,

NRC

inspected

activities

authorized

by

NRC Construction

'Permit

No.

CPPR-158

for your

Harris facility.

At the

conclusion

of the

inspection,

the

findings

were

discussed

with

those

members

of your staff

identified in the enclosed

inspection report.

Areas

examined during the inspection

are identified in the report.

Within these

areas,

the

inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation

of activities

in progress.

Within the

scope of the inspection,

no violations or deviations

were identified.

Should you have

any questions

concerning this letter,

please

contact

us.

Sincerely,

(original signed

by)

Vincent W. Panciera,

Chief

Reactor Projects

Branch

2

Division of Reactor Projects

Enclosure:

Inspection

Report

No. 50-400/86-14

,cg w/encl:

W. A. Watson,

Vice President

arris Nuclear Project

.

M. Parsons,

Project General

Manager

L. Willis, Plant General

Manager

~b c w/encl:

C

Barth,

ELD

W Moore,

ELD

HIRC Resident

Inspector

Document Control

Desk

State of North Carolina

RII

RII

RII

gyes)

@ping

L

c

on:jw

RWright

GBelisle

3/Zo /86

3/gv /86

3/A /86

8604080>~

5000000

8+0402-

pgR

@DOC~ 0

PER

8

3~/86

RII

RI

on

PF

dr ckson

3/Z /86

3@i /86

~or