ML18019A686
| ML18019A686 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 03/14/1986 |
| From: | Panciera V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML18019A688 | List: |
| References | |
| NUDOCS 8603240439 | |
| Download: ML18019A686 (4) | |
See also: IR 05000400/1986007
Text
Mellen: b ~ EFredric
son
03/>5 /86
03/r5/86
rr el 1 i
RD
03
86
03
lker
86
8603240439
Sb03i4
ADOCK 05000400
G
f
Carolina
Power and Light Company
ATTN:
Mr. E.
E. Utley
t
Senior
Executive Vice President
Power Supply and Engineering
and Construction
P. 0.
Box 1551
Raleigh,
NC
27602
Gentlemen:
SUBJECT:
REPORT
NO ~ 50-400/ 6-0
On
January
20 -
February
20,
1986,
NRC conducted
an inspection
of activities
authorized
by
NRC
Construe'ion
Permit
No.
CPPR-158
for your
Shearon
Harris
facility.
At the conclusion of the inspection,
the findings were discussed
with
those
members of your staff identified in the enclosed
inspection report.
Areas
examined during the inspection
are identified in the report.
Within these
areas,
the
i nspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and observation
of activities
in progress.
Within the
scope of the inspection,
no violations or deviations
were identified.
Should you have
any questions
concerning this letter,
please
contact
us.
Sincerely,
Original signed by
V. W. Panciera
Vincent W. Panciera,
Chief
Reactor Projects
Branch
2
Division of Reactor Projects
Enclosure:
Inspection
Report
No. 50-400/86-07
cc w/encl:
R. A. Watson,
Vice President
Harris Nuclear Project
J.
L. Willis, Plant General
Manager
R.
M. Parsons,
Project General
Manager
bcc w/encl:
C. Barth,
ELD
J.
Moore,
ELD
NRC Resident
Inspector
Document Control. Desk
State of North Carol ina
RII
RII
RII
RII
LSMel 1 en: lb
03/
/86
PEFredrickson
03/
/86
DMVerrelli
03/
/86
RDWalker
03/
/86
A.X
/
C