ML18019A617

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-400/86-06 on 860128-31.No Violations or Deviations Noted
ML18019A617
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/03/1986
From: Panciera V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML18019A618 List:
References
NUDOCS 8603110123
Download: ML18019A617 (2)


See also: IR 05000400/1986006

Text

[ ~

'.g

MAR 0 3

)g86

Carolina

Power and Light Company

ATTN:

Mr.

E.

E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P.

0.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

REPORT

NO. 50-400/86'-06

On January

28-31,

1986,

NRC inspected activities authorized

by NRC Construction

Permit

No.

CPPR-158

for your

Harris facility.

At the

conclusion

of the

inspection,

the

findings

were

discussed

with those

members

of your staff

identified in the enclosed

inspection report.

Areas

examined

during the inspection

are identified in the report.

Within these

areas,

the

inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation of activities

in progress.

Within the scope of the inspection,

no violations or deviations

were identified.

Should you have any questions

concerning this letter, please

contact

us.

Sincerely,

Enclosure:

Inspection

Report

No. 50-400/86"06

cc w/encl:

R.

A. Watson,

Vice President

Harris Nuclear Project

v R.

M. Parsons,

Project General

Manager

,Q.

L. Willis, Plant General

Manager

bcc w/encl:

NRC Resident Inspector

Document Control

Desk

State of North Carolina

Vincent

. Panciera,

Chief

Reactor Projects

Branch

2

Division of Reactor Projects

RII

46J/f+ ~

Lenahan: lb

02/iZ/86

RII

/Nul/~~

FJape

02/i> /86

RII

AHer t

2~/86

~ "';B60$iiOf23"~8M393

~

.:.. PDR

ADOCK 05000400

- '::

  • ':8

PDR

a

l

ized I

it I

s)

l

I

g

0