Notice of Violation from Insp on 851202-06 & 16-20
ML18019A564
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 01/28/1986
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML18019A563 List:
References
50-400-85-47, NUDOCS 8602040233
Download: ML18019A564 (4)


Text

ENCLOSURE 1

NOTICE OF VIOLATION Carolina Power and Light Company Shearon Harris Unit 1 Docket No. 50-400 License No.

CPPR-158 The following violation was identified during an inspection conducted on December 2-6 and December 16-20, 1985.

The Severity Level was assigned in accordance with the NRC Enforcement Policy (10 CFR Part 2, Appendix C).

10 CFR 50, Appendix B, Criterion V as implemented by CP8L accepted gA program (FSAR Chapter 17.2) requires that instructions',g procedures, or draw-ings shall include appropriate quantitative or qualitative acceptance criteria for determining that important activities have been satisfactorily accomplished.

10 CFR 50, Appendix B, Criterion XVII as implemented by CPIIL accepted QA program (FSAR Chapter 17.2) requires that test records shall as a minimum, identify the inspector or data recorder, the type of observation, the results, the acceptability, and the action taken in connection with any deficiencies noted.

Contrary to these requirements, test procedure 1-2005-P-01, Revision 0, Hot Functional

Test, approved December 11,
1985, provided acceptance criteria
7. 1 and 7.2, which are vague and imprecise as follows:

~ 7.1 Reactor Coolant System heat-up has been satisfactorily demonstrated within limitations listed or referenced in the steps of this procedure (Section 6.1).

7.2 Supporting Systems and Components have demonstrated satisfactory operation as described in the steps of this procedure.

Furthermore, as of December 20,

1985, the procedure steps and data sheets listed below did not prescribe quantitative, or qualitative acceptance
criteria, normal operating ranges or limitations to evaluate the test results and the acceptability of the test data.

10.2 10.4 10.5 10.8 10.9 10.18 Reactor Coolant Pump Data Incore Cooling (ICC) Monitor

¹1 Seal Data w/RCP's Secured

¹1 Seal Data w/RCP's Energized Containment Ventilation CRDM Cooling Fan Temperature In addition, the following sets of data do not have a verification signature and date to identify the data recorder for data sheets:

10.2, 10.4, 10.9, 10.10, 10.11, 10.12, 10.13, 10.14, 10.16, 10.18, 10.19, 10.20, 10.21, 10.22, and 10.23.

8b02040233 8b0i28 PDR ADQCK 05000400t

'DR

n \\p t

Ch e

e e>>

I

~

IP tt3 C

I'I I

e>> L I gnpt P

I ll crt It v

le f'

II 'P'V

~ ~

P I n, Itt f

hf eel+!I "I,

h e

e QlI'I

'I a

l n

," Pe'4 f If PI II c

(

It I

l lt fi (te 4>>

~

l ~

e e

P P

Carolina Power and Light Company

~

~

~

Shearon Harris Unit 1

Docket No. 50-400 License No.

CPPR-158 This is a Severity Level IV violation (Supplement II).

Pursuant to 10 CFR 2.201, you are required to submit to this office within 30 days of the date of this Notice, a written statement or explanation in reply, including:

(1) admission or denial of the alleged violation; (2) the reasons for the violation if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violation; and (5) the date when full compliance will be achieved.

Security or safeguards information should be submitted as 'an enclosure to facilitate withholding it from public disclosure as required by 10 CFR 2.790(d) or 10 CFR 73.21.

Date:

yrg*.

Vwrl

  • i VVV k

rw y

ll W f I

rW',I W ry C

IWI lVI '

I,,fk eh l'W I.'llV V

r II

(

Ww \\

n t

"l r

II W