ML18019A545

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-400/85-51 on 851209-13.No Violation or Deviation Identified
ML18019A545
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 01/15/1986
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML18019A546 List:
References
NUDOCS 8601290027
Download: ML18019A545 (2)


See also: IR 05000400/1985051

Text

yeas//ssaJ)

P

e

Ag 15 I856

Ca olina Power

and Light Company

TN:

Mr. E.

E. Utley

Senior Executive Vice President

Power

Supply

and Engineering

and Construction

P.

O.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

REPORT

NO. 50-400/85-51

On

December

9-13,

1985,

NRC inspected activities authorized

by

NRC Construction

Permit

No.

CPPR-158 for your Shearon

Harris facility.

At the conclusion of the

inspection,

the findings were discussed

with those

members of your staff identi-

fied in the enclosed

inspection report.

Areas

examined during the inspection

are identified in the report.

Within these

areas,

the

inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation

of activities

in progress.

Within the scope cf the inspection,

no violations or deviations

were identified.

Should you have

arsy questions

concerning this letter,

please

contact

us.

Sincerely,

V. u

fknerer~

David M. Verrelli, Chief

Reactor Projects

Branch

1

Division of Reactor Projects

Enclosure:

Inspection

Report

No. 50-400/85-51

cc w/encl:

sR.

A. Watson,

Vice President

Harr i s Nucl ear

Project

~ M. Parsons,

Project General

Manager

"0 . L. Willis, Plant General

Manager

bcc w/encl:

lARC Resident

Inspector

Document Control

Desk

State of North Carolina

RI I

RII

JRHa

is:cdg

TConlon

12/g//85

j/ ~/8'6

I'0

860i290027

8EsOi i5g

PDR

ADDCK 05000400

8

PDR

RIQ

AHerdt

p

wWP4-

1/lk/86

T'

d38$ < f j,'j~g