January 6, 1986 0 Docket No. 50-400 Mr. E. E. Utley, Executive Vice President Power Supply and Engineering Il Construction Carolina Power and Light Company Post Office Box 1551 Raleigh, North Carolina 27602
Dear Mr. Utley:
SUBJECT:
Request for Additional Information - Shearon Harris, Unit 1
We have reviewed Amendment No.
23 of the Shearon Harris FSAR Chapter 14, Initial Test Program and find that additional information, on the issues identified in the enclosure, is required in order to continue our review.
'incerely,
Enclosure:
As stated cc w/
Enclosure:
See attached list DISTRIBUTION:,
Docket No. 50-400 NRC PDR Local PDR PD ¹2 R/F HThompson OELD EJordan BGrimes JPartlow Bart C. Buckley, Project Manager PWR Project Directorate ¹2 Division of PWR Licensing-A Office of Nuclear Reactor Regulation BBuckley JLee ACRS (10)
Tech.
Branch Gray File LRubenstein 8601090533 860>0+
pDR ADOCN, 05000400 A
PDR FC
- L :P D-7 NAME :J.Lee
- PM:P
- B.Bu
- D:P kley;bg L.
n
~
~
~
~
~
~
DATE :1/
/86
- 1/
/86
/86 OFFICIAL RECORD COPY
Mr. E.
E. Utley Carolina Power 5 Light Company CC:
George F. Trowbridge, Esq.
Shaw, Pittman, Potts 5 Trowbridge 1800 M Street, NM Washington, DC 20036 Richard E. Jones, Esq.
Associate General Counse I Carolina Power 8 Light Company 411 Fayetteville Street Mall
- Raleigh, North Carolina 27602 Jo Anne Sanford, Esq.
Special Deputy Attorney General State of North Carolina Post Office Box 629 Raleigh, North Carolina 27602 Thomas S. Erwin, Esq.
115 M. Morgan Street Raleigh, North Carolina 27602 Resident Inspector/Harris NPS c/o U.S. Nuclear Regulatory Commission Route I, Box 315B New Hill, North Carolina 27562 Charles D. Barham, Jr.,
Esq.
Yice President 5 Senior Counsel Carolina Power 8 Light Company Post Office Box 1551
- Raleigh, North Carolina 27602 Mr. John un e,
R kl Executive Coordinator
'na Conservation o
t Council of North Caroli 307 Granville Road Chapel Hill, North Carolina 27514 Mr. wells Eddleman 806 Parker Street Durham, North Carolina 27701 Mr. George Jackson, Secretary Environmental Law Project School of Law, 064-A University of North Carolina Chapel Hill, North Carolina Shearon Harris Mr. Travis Payne, Esq.
723 M. Johnson Street Post Office Box 12643 Raleigh, North Carolina 27605 Mr. Daniel F.
Read CHANGE Post Office Box 2151 Raleigh, North Carolina 27602 BradIey M. Jones, Esq.
U.S. Nuclear Regulatory Commission Region II 101 Marietta Street Atlanta, Georgia 30303 Richard D. Milson, M.D.
725 Hunter Street Apex, North Carolina 27502 Regional Administrator, Region 1I U.S. NucIear Regulatory Commission 101 Marietta Street Suite 2900 Atlanta, Georgia 30303 Mr. Robert P. Gruber Executive Director Public Staff -
NCUC Post Office Box 991'aleigh, North Carolina 27602 Dr. Linda Little Governor s Waste Management Board 513 Albermarle Building 325 North Salisbury Street
- Raleigh, North Carolina 27611
Enclosure RE(UEST FOR ADDITIONAL INFORMATION SHEARON HARRIS NUCLEAR POWER PLANT 640.5 4.t
{open Item 202) 640.9
'n FSAR sections should be modified to conform R
d Special Low Power Testing with the Westinghouse Revise peci n
{NRC) dated July 8, 1981:
ibed in the letter from..
a (Westinghouse) to H.
R. Denton
{
a e
(1)
Subsection 14.
2 12 2 22 {Pressurizer Heaters and Spray Valves Capability Test Summary).
and 4 (regarding charging flow
) sho ld be rew 'tt n variations and RCS cooldown shou e
as part of the test method.
(
)
Th t t method and acceptance criteteria should be b
e es d f d to address the effects of au y
xiliar mo s
se o
pressurizer spray on pressurizer pressure.
acce tance criteria should be (c)
The test method and p
mo 1
1e d'f' to address the effects o
c a
and steam from variations on subcoo '.
'lin
{d)
Acceptance Criter>a 3 shoul
~
~
ld be clarified.
(2)
Subsection 14.
2 12 2 26 {Natural Circulation Test Summary).
tive should be modified to rein-f th ff t f
1 state the demonstration o
e e e
of pressurizer heaters on margin to sa ura
'emperature.
test method should be',modified to reinstate th core powe~ distribution the obs observation o
e co as it remains par t o e
a f th acceptance criteria.
6 Emer ency Diesel Generator Test FSAR Subsection 14.2. 12. 1. 16 {Emerg y't nce with FSAR Subsection acceptance criteria in accordance wit u
8.3.1.2.4:
10 ercent of nominal voltage
{1)
The recovery of withsn 10 pe and two percent of nominal frequency ws in of each load sequence time interval.
s eed shall not exceed 107.5
{2)
The diesel generator spec percent of nominal speed
{450 rpm upon i
of the largest single load.
640.21 14D 14E FSAR Subsection 14.2.1.
i y
d f d to r einstate 1.25 (Safety Injection System Performance Test Summary) should be mo i ie o
the recor sng o
d f CSIP system pressure, temperature, chemistry and duration of test>ng, or app justification should be provided in response to
~s s
ta'ned in FSAR 14.2.11-2 should be modified to include all test summaries containe
>n Subsection 14.2.12.
2.12.1.36 (Fuel Pool Cooling and Clean-up d'f'dt 't th
't regarding operability ar
) should be mo
~ ie o
test methods and acceptance c
ctionalizing devices an rains lo o
FSAR S b t o l ak tests on gaskets and bel o
14.2.7 should be modified to provide technica jus i i for exception to Regulatory Guide 1.68, Appendix
.m on 14.2.12.2.12 (Control Rod Reactivity Worth d'f' t
rovide clarification f th t t o th ld be modifie o pro
'egarding the location and positron o