ML18019A509
| ML18019A509 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 01/02/1986 |
| From: | Verrelli D NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Utley E Carolina Power & Light Co |
| Shared Package | |
| ML18019A510 | List: |
| References | |
| NUDOCS 8601080217 | |
| Download: ML18019A509 (4) | |
See also: IR 05000400/1985043
Text
J~~ 02
]S85
Ca olina Power
and Light Company
TN:
Mr.
E.
E. Utley
Senior Executive Vice President
Power
Supply and Engineering
and Construction
P. 0.
Box 1551
Raleigh,
NC
27602
Gentlemen:
SUBJECT:
REPORT
NO. 50-400/85-43
On October
20 - November 20,
1985,
NRC inspected activities authorized
by
NRC
Construction
Permit
No.
CPPR-158
for your
Shearon
Harris facility.
At the
conclusion of the inspection,
the findings were discussed
with those
members
of
your staff identified in the enclosed
inspection report.
Areas
examined during the inspection
are identified in the report.
Within these
areas,
the
inspection
consisted
of selective
examinations
of procedures
and
representative
'. ecords,
interviews with personnel,
and observation
of activities
in progress.
Within the
scope of the inspection,
no violations or deviations
were identified.
Should you have
any questions
concerning this letter,
please
contact
us.
Sincerely,
PRIGINAL SIGNEO SY
QAYtD Ah
VERRELLI
David M. Verrelli, Chief
Reactor Projects
Branch
1
Division of Reactor Projects
Enclosure:
Inspection
Report
No. 50-400/85-43
c w/encl:
R. A. Watson,
Vice President
Harris Nuclear Project
.
M. Parsons,
Project General
Manager
L. Willis, Plant General
Manager
bcc w/encl:
(See
page 2)
8601080217
860102
PDR', ADO'05000000,(
'
C
+1 ~=.~i~)IR J'ilff3",gQ
f3.l.i "BV S') QtVAQ
C
1
Ag 03
l986
Carolina
Power
and Light Company
bcc w/encl:
PRE Resident
Inspector
Document Control
Desk
State of North Carolina
I
RII
LMellen:jw
M7~/85
I (~/ s'~
PFr
rickson
plass
f