@FAN 3. 3 1S85

Carolina

Power and Light Company

+ATTN:

Mr.

E.

E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

REPORT

NO. 50-400/85-40

On

November 18-22,

1985,

NRC inspected activities authorized

by

NRC Construction

permit

No.

CPPR-158

for your Harris facility.

At the conclusion of the inspec-

tion, the findings were discussed

with those

members of your staff identified in

the enclosed

inspection report.

Areas

examined during the inspection

are identified in the report.

Within these

areas,

the

inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation

of activities

in progress.

Within the

scope of the inspection,

no violations or deviations

were identified.

Should you have

any questions

concerning this letter,

please

contact

us.

Sincerely,

David M. Verrelli, Chief

Reactor Projects

Branch

1

Division of Reactor Projects

Enclosure:

Inspection

Report

No. 50-400/85-40

cc w/encl:

" W. A. Watson,

Vice President

Harris Nuclear Project

M. Parsons,

Project General

Manager

L. Willis, Plant General

Manager

b~c w/encl:

l4RC Resident

Inspector

Document Control

Desk

State of North Carolina

RII

'I

r

MWM

1 r:cdg

gG

s

man

12/iz /85

12hz/85

TConl on

12/[0/85

A erd

12/

/85

851227033b

8512i3

PDR

ADOCK'05000400

PDR

'

)

~O/