ML18019A496
| ML18019A496 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 12/13/1985 |
| From: | Verrelli D NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Utley E Carolina Power & Light Co |
| Shared Package | |
| ML18019A497 | List: |
| References | |
| NUDOCS 8512270336 | |
| Download: ML18019A496 (1) | |
See also: IR 05000400/1985040
Text
@FAN 3. 3 1S85
Carolina
Power and Light Company
+ATTN:
Mr.
E.
E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. 0.
Box 1551
Raleigh,
NC
27602
Gentlemen:
SUBJECT:
REPORT
NO. 50-400/85-40
On
November 18-22,
1985,
NRC inspected activities authorized
by
NRC Construction
permit
No.
CPPR-158
for your Harris facility.
At the conclusion of the inspec-
tion, the findings were discussed
with those
members of your staff identified in
the enclosed
inspection report.
Areas
examined during the inspection
are identified in the report.
Within these
areas,
the
inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and observation
of activities
in progress.
Within the
scope of the inspection,
no violations or deviations
were identified.
Should you have
any questions
concerning this letter,
please
contact
us.
Sincerely,
David M. Verrelli, Chief
Reactor Projects
Branch
1
Division of Reactor Projects
Enclosure:
Inspection
Report
No. 50-400/85-40
cc w/encl:
" W. A. Watson,
Vice President
Harris Nuclear Project
M. Parsons,
Project General
Manager
L. Willis, Plant General
Manager
b~c w/encl:
l4RC Resident
Inspector
Document Control
Desk
State of North Carolina
RII
'I
r
MWM
1 r:cdg
gG
s
man
12/iz /85
12hz/85
TConl on
12/[0/85
A erd
12/
/85
851227033b
8512i3
ADOCK'05000400
'
)
~O/