ML18019A493

From kanterella
Jump to navigation Jump to search
Forwards 47879-02, Test Rept on Electrical Separation Verification Testing for CP&L for Use in Shearon Harris Nuclear Power Plant, in Compliance W/Rev 1 to Reg Guide 1.75 & Section 5.1.1.2 of IEEE Std 384-1974
Date released: 08/31/2018 Download: ML18019A493


Test Rept on Electrical Separation Verification Testing for CP&L for Use in Shearon Harris Nuclear Power Plant.
ML18019A494
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 11/21/1985
From:
WYLE LABORATORIES
To:
References
Download: ML18019A494 (633)
Forwards 47879-02, Test Rept on Electrical Separation Verification Testing for CP&L for Use in Shearon Harris Nuclear Power Plant, in Compliance W/Rev 1 to Reg Guide 1.75 & Section 5.1.1.2 of IEEE Std 384-1974
ML18019A492
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 11/21/1985
From: Zimmerman S
CAROLINA POWER & LIGHT CO.
To: DENTON H R
Office of Nuclear Reactor Regulation
References
RTR-REGGD-01.075, RTR-REGGD-1.075
Download: ML18019A492 (17)