ML18019A476
| ML18019A476 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 11/01/1985 |
| From: | Verrelli D NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Utley E Carolina Power & Light Co |
| Shared Package | |
| ML18019A477 | List: |
| References | |
| NUDOCS 8511140225 | |
| Download: ML18019A476 (2) | |
See also: IR 05000400/1985036
Text
Carolina
Power and Light Company
~
~
~
~
~
~
~
~
~
ATT :
Mr.
E.
E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P.
0.
Box 1551
Raleigh,
NC
27602
Gentlemen:
SUBJECT:
REPORT
NO. 50-400/85-36
On September
30
October 4,
1985,
NRC inspected activities authorized
by
NRC
Construction
Permit
No.
CPPR-158 for your Harris facility.
At the conclusion of
the
inspection,
the findings were discussed
with those
members
of your staff
identified in the enclosed
inspection report.
Areas
examined
during the inspection
are identitied in the report.
Within these
areas,
the
inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and observation of activities
in progress.
Within the scope of the inspection,
no violations or deviations
were identified.
~
~
Should you have
any questions
concerning this letter, please
contact
us.
Sincerely,
/a/
David M. Verrelli, Chief
Reactor Projects
Branch
1
Division of Reactor Projects
Enclosure:
Inspection
Report
No. 50-400/85-36
cc
encl:
.
A. Watson,
Vice President
arris Nuclear Project
Parsons,
Project General
Manager
L. Willis, .Plant General
Manager
b
w/encl:
RC Resident Inspector
Document Control Desk
State of North Carolina
8SZia40mS Ssiiol
ADOCK 05000400
l
Q
.
P~
WLiu:sa
10/g] /85
10/3o/85
ARHerdt
10/y/85
~
j
ll
0