Forwards Insp Rept 50-400/85-36 on 850930-1004.No Violation or Deviation Noted
ML18019A476
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 11/01/1985
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML18019A477 List:
References
NUDOCS 8511140225
Download: ML18019A476 (2)


See also: IR 05000400/1985036

Text

Carolina

Power and Light Company

~

~

~

~

~

~

~

~

~

ATT :

Mr.

E.

E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P.

0.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

REPORT

NO. 50-400/85-36

On September

30

October 4,

1985,

NRC inspected activities authorized

by

NRC

Construction

Permit

No.

CPPR-158 for your Harris facility.

At the conclusion of

the

inspection,

the findings were discussed

with those

members

of your staff

identified in the enclosed

inspection report.

Areas

examined

during the inspection

are identitied in the report.

Within these

areas,

the

inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation of activities

in progress.

Within the scope of the inspection,

no violations or deviations

were identified.

~

~

Should you have

any questions

concerning this letter, please

contact

us.

Sincerely,

/a/

David M. Verrelli, Chief

Reactor Projects

Branch

1

Division of Reactor Projects

Enclosure:

Inspection

Report

No. 50-400/85-36

cc

encl:

.

A. Watson,

Vice President

arris Nuclear Project

Parsons,

Project General

Manager

L. Willis, .Plant General

Manager

b

w/encl:

RC Resident Inspector

Document Control Desk

State of North Carolina

8SZia40mS Ssiiol

PDR

ADOCK 05000400

l

Q

PDR

.

P~

WLiu:sa

10/g] /85

10/3o/85

ARHerdt

10/y/85

~

j

ll

0