ML18019A452

From kanterella
Jump to navigation Jump to search
Forwards Containment Recirculation Sump Evaluation, Based on Methodology Presented by NRC During 850918 Meeting. Integrated Design Insp Item D2.3-1 Closed.List of Meeting Attendees Also Encl
ML18019A452
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/25/1985
From: Zimmerman S
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML18019A454 List:
References
REF-GTECI-A-43, REF-GTECI-ES, TASK-A-43, TASK-OR NLS-85-384, NUDOCS 8511040293
Download: ML18019A452 (3)


Text

REGULATORY ORMATION DISTRIBUTION SYS M (BIDS)

ACCESSION NOR:8511040293 DOC DATE: 85/10/25 NOTARIZED; NO FACIL:50-400 BYNAME

~

Shearon Harris Nuclear Power Pl ant r Uni t ii Carolina. 05000400 AUTH ZIMMERMANiS,RE RECIP ~ NAME DENTONiH" SUBJECT; RE encl'OCKET' AUTHOR AFFILIATION Carolina Power 8 RECIPIENT A/FILIATION Light Co+

Office. of Nuclear Reactor Regulationp Director V

Forwards "Containment Recirculation Sump Evaluationi," based on methodolgy presented by NRC during 850918 Design Insp Item 02,3 1 closed. List of meeting meeting,'ntegrated attendees'lso DISTRIBUTION CODE: 8001D COPIES RECEIVEOtLTR L ENCL Related f SIZEe~, fklPS TITLE': Licensing Submittal: PSAR/FSAR Amdts 8, Correspondence'OTES:.

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL IO CODE/NAME LTTR ENCL' NRR/DL/ADL 1 0 NRR LB3 BC NRR L83 LA 1=- 0 BUCKLEYgB 01 1 INTERNAL: ACRS 41 6 6 ADM/LFMB 1 0 ELD/HDS1 1 0 IE FILE 1 1 IE/DEPER/EPB 36 1 1 IE/DQAYT/QA821 1 1 NRR ROE MAL 1 1 NRR/DE/AEAB 1 ~

0 NRR/DE/CEB 1 1 1 1 NRR/DE/EHEB 1 1 NRR/DE/EQB 13 2 2 NRR/DE/GB 28 2 2' NRR/DE/MEB 18 1 1 NRR/DE/MTEB 17 1 NRR/DE/SAB 24 1 1 NRR/DE/SGEB 25 1 1-NRR/OHFS/HFEB40 1 1 NRR/DHFS/LQB 32" 1 NRR/OHFS/PSRB 1 1 NRR/DL/SSPB 1 0 NRR/DS I/AEB 26 1 1 NRR/DSI/ASB 1 - 1 NRR/DSI/CP8 10. 1 1 NRR/DSI/CSB 09 1-NRR/DSI/ICSB 16 1 1 NRR/DSI/METB 12 1 1-NRR/DSI /PSB 19. 1 1 NR RAB 22 1 1 NRR/DSI/RSB 23 1 1 FIL 04 1 1 ~

RGN2 3 3 RM /MI8 1 0 EXTERNAL: 24X 1 1 BNL(AMDTS ONLY) 1 DMB/OSS (AMDTS) 1 1 LPDR 03 1-NRC PDR 02', 1 NSIC 05 1 PNL~ GRUELiR 1 TOTAL NUMBER OF COPIES REQUIRED; LTTR 52 ENCL 44

k ~,w t (

/" 'q ~ $ w II i- F I

%4. J d

)p V

V Wet 'l 1, g l I 4 7[,4 N

'I 1

t fr F

' 'll k k 1

4i H

I f j

à e d' t

J

O Sly Carolina Power & Light Company SERIAL: NLS-85-380 OCT 3 51985 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. l DOCKET NO.50-000 CONTAINMENT RECIRCULATION SUMP EVALUATIONREPORT

Dear Mr. Denton:

Attached for your use is the subject report which demonstrates the design and functional adequacy of the Harris containment recirculation sumps. The study was performed using the analytical methodology presented to members of your staff on September l8, 1985.

This methodology was developed using the guidance in the proposed resolution to Generic Safety Issue A-03. The meeting attendees list is attached as Enclosure 2.

Carolina Power R Light Company considers IDI Item D2.3-1 closed based upon the satisfactory completion and submittal of this report to the NRC. The Shearon Harris FSAR will be appropriately revised in a future amendment.

If you have any questions, please contact David C. McCarthy at (919) 362-2010.

Yours very truly, S.. Zim erman Ma er Nuclear Licensing Section DCM/crs (2070DCM)

Attachment Cct Mr. R. E. Architzel (NRC) Wake County Public Library Mr. B. C. Buckley (NRC) Mr. Wells Eddleman Mr. G. F. Maxwell (NRC-SHNPP) Mr. 3ohn D. Runkle Mr. 3. L. Milhoan (NRC) Dr. Richard D. Wilson Dr. 3. Nelson Grace (NRC-RII) Mr. G. O. Bright (ASLB)

Mr. Travis Payne (KUDZU) Dr. 3. H. Carpenter (ASLB)

Mr. Daniel F. Read (CHANCE/ELP) Mr. 3. L. Kelley (ASLB)

Mr. H. A. Cole q,col 8511040293 851025 PDR ADOCK 05000400 8

411 Fayettevilte Street o P. O. Box 1551 o Raleigh, N. C. 27602