~ 'v
~ >s
SEP 27
1985
Carolina
Power and Light Company
~TTN:
Mr. E.
E. Utley
Senior
Executive Vice President
Power Supply and Engineering
and Construction
P. 0.
Box 1551
Raleigh,
NC
27602
Gentlemen:
SUBJECT:
REPORT
NO. 50-400/85-33
On
August
20 -
September
20,
1985,
NRC conducted
an inspection
of activities
authorized
by
NRC Construction
Permit
No.
CPPR-158
for your
Shearon
Harris
facility.
At the
conclusion
of the
inspection,
the. findings
were
discussed
with those
members of your staff identified in the enclosed
inspection report.
Areas
examined during the inspection
are identified in the report.
Within these
areas,
the
inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and observation
of activities
in progress.
Within the
scope of the inspection,
no violations or deviations were, identified.
Your attention
is invited to
one
unresolved
item identified in the inspection
report.
This matter will be pursued during future inspections.
Should you have
any questions
concerning this letter,
please
contact
us.
Sincerely,
ORIGINAL" SlGHpn nv
DAVlD Ph
YE(RELLl
David M. Verrelli, Chief
Reactor Projects
Branch
1
Division of Reactor Projects
Enclosure:
Inspection
Report
No. 50-400/85-33
w/encl:
. A. Watson,
Vice President
Harris Nuclear Project
L. Willis, Plant General
Manager
bcc w/encl:
(See
page
2)
SQ 10090'329
8
~quip
9
e
4
ll
Carolina
Power
and Light Company
SEP 2V 1985
bcc w/encl:
Resident
Inspector
Document Control
Desk
State of North Carolina
RII
PFredri ckson: dr
9/
/85
RII+
OVerrel 1 i
9/y)/85
~ 'I '
k'