Advises That Final Summary Re Dcrdr Will Be Submitted in Sept 1985,per Section 18 of Sser 1 (NUREG-1038).Small Number of Dcrdr Tasks Dependent on Completion of Control Room Const Will Not Be Completed by Sept
ML18019A339
Person / Time
Site: Harris 
Issue date: 08/26/1985
From: Zimmerman S
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
RTR-NUREG-1038 NLS-85-287, NUDOCS 8508300016
Download: ML18019A339 (4)


Text

REGUl INFORMATION DISTRIBUT i

YSTEM (RIDS)

ACCESSION NBR: 8508300016 DOC ~ DATE: 85/08/26 NOTARIZED:

NO FACIL:50-400 Shearon Harris Nuclear Power Pl anti Unit ii Carolina AUTH BYNAME AUTHOR AF FILIATION ZIMMERMANiS ~ RE Carolina Power lj,'ight Co, RECIP ~ NAME, RECIPIENT AFFILIATION DENTONiH.R.

Office of Nuclear Reactor Regulationi Director DOCKET 05000400

SUBJECT:

Advises that final summary re DCRDR will be submitted in Sept 1985iper Section 18 of SSER 1

(NUREG-103S),Small number of DCRDR tasks dependent on completion of control room const will not be completed by Sept, DISTRIBUTION CODE:

B001D COPIES RECEIVED:LTR ENCL.

SIZE:

(

TITLE: Licensing Submittall PSAR/FSAR Amdts L Related Correspondence'OTES; RECIPIENT ID CODE/NAME NRR/DL/ADL NRR LB3 LA INTERNAL: ACRS ELD/HDS1 IE/DEPER/EPB 36 NRR ROEiM ~ L NRR/DE/CEB 11 NRR/DE/EQB 13 NRR/DE/MEB 18 NRR/DE/SAB 24 NRRrDHFS/HFEB40 NRRrDHFS/PSRB NRR/DS I/AEB 26 NRR/DSI/CPB 10 NRR/DSI/ICSB 16 NRR/DS I/PSB 19 NRR/DS I/RSB 23 RGN2 EXTERNAL: 24X DMB/DSS (AMDTS)

NRC PDR 02 PNL GRUELiR COPIES LTTR ENC 1

1 RECIPIENT ID CODE/NAME NRR LB3 BC BUCKLEYpB 01 ADM/LFMB IE. FILE IE/DQAVT/QAB21 NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB 28 NRR/DE/MTEB 17 NRR/DE/SGEB 25 NRR/DHFS/LQB 32 NRR/DL/SSPB NRR/DS I/AS8 NRR/DSI/CSB 09 NRR/DSI/METB 12 N

RAB 22

04 RM/DOAMI/MIB BNL(AMDTS ONLY)

LPDR 03 NSIC 05 COPIES LTTR ENCL' 1

1 1

1 1

1 2

1 1

1 1

1 1

1 1

1 1

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 52 ENCL

~y Oy 4

0 t'

'I t

C 7

t l.

r'l (i

4 (I

(t 4

1 ts II'i g

}!

l{

I

ItO CNK Carolina Power 8 Light Company AUG 2 6 1885 SERIAL: NLS-85-287 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO.

1 DOCKET NO.50-000 DETAILEDCONTROL ROOM DESIGN REVIEW SCHEDULE FOR SUBMITTALOF INFORMATION

Dear Mr. Denton:

Section 18 of Supplement 1 to the Shearon Harris Nuclear Power Plant (SHNPP) SER (NUREG-10338) summarized the additional information required to complete a detailed control'design review (DCRDR). This information'was requested at least six months prior to SHNPP licensing.

On April 9, 1985 CPdcL submitted via NLS-85-096 a DCRDR Summary Report documenting the status of the task and the methodology for its completion.

Carolina Power 2 Light Company willsubmit the Final Summary Report in September 1985 to be consistent with the request for information six months prior to licensing which is scheduled for March 1986.

A small number of DCRDR tasks that are dependent on the completion of control room construction willnot be completed by September but willbe completed prior to fuel load.

The Company willinter face with the NRC staff for any additional information that may be required.

If you have any questions or comments on this subject, please contact Ms. Carol Love at (919) 836-8166.

Yours very truly, 3DK/crs (18233DK)

S.. Zim erman ager Nuclear Licensing Section CC:

Mr. B. C. Buckley (NRC)

Mr. G..F. Maxwell (NRC-SHNPP)

Dr. 3. Nelson Grace (NRC-Rll)

Mr. R. Ramirez (NRC)

Mr. Travis Payne (KUDZU)

Mr. Daniel F. Read (CHANGE/ELP)

Wake County Public Library Mr. Wells Eddleman Mr. 3ohn D. Runkle Dr. Richard D. Wilson Mr. G. O. Bright (ASLB)

Dr. 3. H. Carpenter (ASLB)

Mr. 3. L. Kelley (ASLB) 8SOS3OOOie SS0826':-

- PDR '"ADOCK 05000400 '

'DR street 4 P. O. Box 1551

~ Raleigh, N. C. 27602 Quet 11 Q