AUG 02

1985

Carolina

Power

and Light Company

+ATTN:

Mr. E.

E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

REPORT

NO. 50-400/85-27

On

June

20

July 20,

1985,

NRC

inspected

activities

authorized

by

NRC

Construction

Permit

No.

CPPR-158

for your

Shearon

Harris facility.

At the

conclusion of the inspection,

the findings were discussed

with those

members

of

your staff identified in the enclosed

inspection report.

Areas

examined during the inspection

are identified in the report.

Within these

areas,

the

inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation of activities

in progress.

Within the

scope of the inspection,

no violations or deviations

were identified.

Should you have

any questions

concerning this letter,

please

contact

us.

Sincerely,

+/ ~b~ig ~, Vnyye kl.>

David M. Verrelli, Chief

Reactor Projects

Branch

1

Division of Reactor Projects

Enclosure:

Inspection

Report

No. 50-400/85-27

c w/encl:

. A. Watson,

Vice President

Harris Nuclear Project

M. Parsons,

Project General

Manager

b~c w/encl:

NARC Resident

Inspector

Document Control

Desk

State of North Carolina

, 8508i40286 '85080Z

', PDR.,

ADOCK05000400,

'PDR-

RI

RI

AH d: jw

PF edrickson

%'/85

P7" )l85

~/y ~~