Forwards Insp Rept 50-400/85-25 on 850619-21.No Violations or Deviations Identified
ML18019A287
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 07/02/1985
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML18019A288 List:
References
NUDOCS 8508020056
Download: ML18019A287 (2)


See also: IR 05000400/1985025

Text

585

Carolina

Power

and Light Company

~

~

~

~

~

~

~

ATTN:

Mr.

E.

E. Utley

Senior Executive Vice President

Power

Supply and Engineering

and Construction

411 Fayetteville Street

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

REPORT

NO. 50-400/85"25

On

June 19-21,

1985,

NRC inspected activities authorized

by

NRC Construction

Permit

No.

CPPR-158

for your Harris facility.

At the

conclusion

of the

inspection,

the

findings

were

discussed

with those

members

of your staff

identified in the enclosed

inspection report.

Areas

examined

during the inspection

are identified in the report.

Within these

areas,

the

inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation of activities

in progress.

Within the scope of the inspection,

no violations or deviations

were identified.

Should you have any questions

concerning this letter, please

contact

us.

Sincerely,

l~(

David M. Verrelli, Chief

Reactor Projects

Branch

1

Division of Reactor Projects

Enclosure:

Inspection

Report

No. 50-400/85-25

c'c w/encl:

R.

A. Watson,

Vice President

Harris Nuclear Project

R.

M. Parsons,

Project General

Manager

bcc w/encl:

NRC Resident

Inspector

Document Control

Desk

State of North Carolina

RI

RII

KVan yne:.dr +FJgPe

6Cyg/85

6/

/85

RII

A erdt

$y~ XSR

PFr

rickson

6

85

508020056

850702

'gR

. hooch o

'A,

~E'V/ a(

C

'4

1

1

/