ML18019A250

From kanterella
Jump to navigation Jump to search
Responds to Violations Noted in Insp Rept 50-400/85-04. Formal Guideline Procedure to Place Adequate Control & Verification Requirements on Cable Sized by Hpes Projected for Issuance by 850614
ML18019A250
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/29/1985
From: Parsons R
CAROLINA POWER & LIGHT CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
CON-NRC-356 NUDOCS 8506240200
Download: ML18019A250 (3)


Text

CP L Carolina Power a Light Company P. O. Box 101, New Hill, VC 27562 April 29, 1985 Dr. J. Velson Crace .VRC-356 United States Vuclear Regulatory Commission Region II 101 Marietta Street, tVorthwest (Suite 2900)

Atlanta, Georgia 30323

Dear Dr. Crace:

The purpose of this letter is to inform you of the status of corrective action being taken to resolve violation RII GFM/RLP 50-000/85-00-02, "Inadequate Electrical Design", and to establish a new projected full compliance date.

In our April ll, 1985, letter NRC-339, we stated that the subject NIO. AWG conductor had been replaced with a 82 AWG conductor per F R-E-0052, and that administrative instructions had been issued to ensure closer monitoring and control of cable sized by HPES. We also stated that a formal guideline procedure to place adequate control and verification requirements on cable sized by HPES was projected to be issued by April 30, 1985.

We hereby inform you that the issuance of the above mentioned guideline will be delayed. We are cu'rrently completing a review of the Ebasco issued design basis document upon which the CPtttL guideline will be based. It is now projected that the review, approval, and issuance of the guideline will be accomplished by 3une 14, 1985.

Thank you for your consideration in this matter.

Yours very truly, R. M. Parsons Project Ceneral Manager Completion Assurance Shearon Harris Nuclear Power Plant RMP:sae cc: Messrs. G. Maxwell/R. Prevatte (NRC-SHNPP)

Mr. B. C. Buckley (NRC)

XEX-se 1 0/1WS5

Dr. 3. Nelson Grace 2 NRC-356 bcc: Mr. H. R. Banks Mr. T. A Baxter (Shaw, Pittman Potts &: Trowbridge)

Mr. C. S. Bohanan Mr. H. W. Bowles Vlr. C. Carmichael (2)

Vlr. V. 3 Chiangi

~

Mr. A. B. Cutter Dr. T. S. Elleman Ms. S F. Flynn

~

Mr. G. L. Forehand Vlr. 3. F. Garibaldi (Ebasco)

Mr. 3 L. Harness

~

Vlr P. C. Hopkins Dr. 3. D. E. 3eff ries Vtr. I. A. 3ohnson Mr. L. I ~ 'flin Mr. R. E. Lumsden Mr. R. L. Mayton, 3r Mr. S McManus

~

Mr. C. H. Moseley, 3r Vlr. 3 F. Nevill

~

Mr. D. L. Nordstrom (LIS)

Mr. R. M. Parsons Mr. VI. Shannon (Westinghouse)

Mr. G. A. Sinders Mr. Sheldon D. Smith Mr. M. F. Thompson, 3r Mr. A. C. Tollison Mr. E 3. Wagner

~

Mr. R. A. Watson Mr. 3 L. Willis

~

File: Hl/A-2D File: H-X-05 XE X-se l 0/2-OS 5