ML18018B924
| ML18018B924 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 05/06/1985 |
| From: | Verrelli D NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Utley E Carolina Power & Light Co |
| Shared Package | |
| ML18018B925 | List: |
| References | |
| NUDOCS 8505200585 | |
| Download: ML18018B924 (1) | |
See also: IR 05000320/2004020
Text
HAY 06
1985
( CIG
Carolina
Power and Light Company
ATTN:
Mr,
E. Utley
Executive Vice President
Power Supply and Engineering
and Construction
411 Fayetteville Street
Raleigh,
NC
27602
Gentlemen:
SUBJECT:
REPORT
NO. 50-400/85-14
On
March 20
Apri 1 20,
1985,
NRC
inspected
activities
authorized
by
NRC
Construction
Permit No.
CPPR-158 for your Shearon
Harris facility.
At the con-
clusion of the
inspection,
the findings were discussed
with those
members
of
your staff identified in the enclosed
inspection report.
Areas
examined during the inspection
are identified in the report.
Within these
areas,
the
inspection
'consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and observation
of activities
in progress.
Within the
scope of the inspection,
no violations or deviations
were identified.
Your attention
is invited to unresolved
items identified in the
inspection
report.
These matters will be pursued
during future inspections.
Should you have
any questions
concerning this letter,
please
contact
us.
Sincerely,
Enclosure:
Inspection
Report
No. 50-400/85-14
cc w/encl:
R. A. Watson,
Vice President
Harris Nuclear Project
R.
M. Parsons,
Project General
Manager
bcc w/encl:
Document Control
Desk
State of North Carolina
NRC Resident
Inspector
David M. Verrelli, Chief
Reactor Projects
Branch
1
Division of Reactor Projects
RII
din:es
0/
/85
RII
r
c son
S/y
'ooozoooso
eioooos
ADOCK 05000400
8