ML18018B857

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-400/84-43 on 841127-30.No Violations or Deviations Noted
ML18018B857
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/14/1984
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML18018B858 List:
References
NUDOCS 8501210085
Download: ML18018B857 (3)


See also: IR 05000400/1984043

Text

~S AEQII

0p0

Cy

A

0

r

~ 9 <<+*+>>

UNITED STATES

Exhibit 3

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTASTREET, N.W.

ATLANTA,GEORGIA 30323

DEC i4 1984

Carolina

Power

and Light Company

ATTN:

Hr.

E.

E. Utley

Executive Yice President

Power Supply

and Engineering

and Construction

411 Fayetteville Street

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

REPORT

NO. 50"400/84-43

On

November 27-30,

1984,

NRC inspected activities authorized

by

NRC Construciion

Permit

No.

CPPR-158

for your

Harris facility.

At

the

conclusion

of

the

inspection,

the

findings

were

discussed

with

those

members

of your staff

identified in the enclosed

inspection

repor.t.

Areas

examined during the inspection

are identified'n the report.

Within these

areas,

the

inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation

of activities

in progress.

Within the

scope of the inspection,

no violations or deviations

were identified.

~

~

~

Your attention

is invited to

unresolved

items identified

in

the

inspection

report.

These matters

wi 11

be pursued during future inspections.

In accordance

with

10 CFR 2.790(a),

a copy of this letter and enclosure will be

placed in the

NRC Public Oocument

Room unless

you notify this office by telephone

within

10

days

of the

date of this letter

and

submit written applica.iorr

o

withhold information contained

therein within 30 days of the date of this letter.

Such application

must

be consistent

with the requirements

of 2.790(b)( 1).

Should you have

any questions

concerning this letter,

please

contact

us.

Sincerely,

l j

Oa id M. Vhrreili, Chief

Reactor Projects

Branch

1

Oivision of. Reactor

Projects

Enclosure:

Inspection

Report

No. 50-400/84-43

cc w/encl:

(See

page

2)

8

Carolina

Power

and Light Company

cc w/encl:

R. A. Watson,

Vice President

Harris Nuclear Project

R.

M. Parsons,

Project, General

Manager