Forwards Meeting Summary Rept 50-400/84-40 on 841102
ML18018B854
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 11/26/1984
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML18018B855 List:
References
NUDOCS 8501210018
Download: ML18018B854 (2)


See also: IR 05000400/1984040

Text

BENDIX 2

~p

pit R gpss(

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

)

101 MARIETTASTREET, N.W.

"trI

'- ~,

> .'TLANTA,GEORGIA 30323

,efDt '"

I -: -l

  • >><< ~~GIN HA<ZI> q. p p

goV26 l984

Carolina

Power

aod Light Company

ATTN:

Mr. E.

E. Utley

Executive Vice President

Power Supply and Engineering

and Construction

411 Fayettevil le Street

Raleigh,

NC

27602

Gentlemen:

~

~

SUBJECT:

MEETING SUMMARY - REPORT

NO. 50-400/84"40

This letter refers

to the

technical

meeting

held at your request

in the

NRC

Region II Office

on

November 2,

1984.

This

meeting

concerned

activities

authorized

by

NRC

Construction

Permit

No.

CPPR-158

for the

Shearon

Harris

facility.

The meeting

provided Carolina

Power

and Light Company

(CPCL)

an opportunity to

demonstrate

the ability of their ultrasonic

examination

procedure

and

equipment

to detect,

locate,

and size actual

crack flaws propagating

from the pipe inside

diameter

in centrifugally cast

stainless

stee1

as

discussed

in the

enclosed

report.

It is our opinion that this meeting

was informative

and beneficial to both

NRC

and

CPKL because

of the

exchange

of information concerning

inspection of cast.

stainless

steel.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosure will

be

placed

in

NRC's

Public

Document

Room

unless

you notify this office

by

telephone

within

10 days of the date of this letter and submit written applica-

tion to withhold information contained therein within 30 days of the date of the

letter.

Such

application

must

be

consistent

with

the

requirements

of

2.790(b)(1).

Should

you

have

any questions

concerning

this matter,

we will be pleased

to

discuss

them.

Enclosure:

(See

page

2)

Sincerely,),4

D vid M.

rrelli, Chief

R actor Projects

Branch

1

Division of Reactor Projects

f

. '.

'

.~r

Carolina

Power

and Light Company

Noy 26 1984

~

Enclosure:

[nspection

Report

No. 50-400/84-40

cc w/encl: ..-

R. A. Watson,

Vice President

Harris Nuclear Project

R,

M. Parsons,

Project General-Manager